Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSan Leon Regulatory News (SLE)

  • This share is currently suspended. It was suspended at a price of 16.14

Share Price Information for San Leon (SLE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 16.14
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 16.14
SLE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lewino-1G2 Operational Update

23 Oct 2013 07:00

RNS Number : 1442R
San Leon Energy PLC
23 October 2013
 



23 October 2013

San Leon Energy Plc

("San Leon" or the "Company")

Lewino-1G2 Operational Update

San Leon is pleased to announce the next operational steps for the vertical hydraulic fracture stimulation ("frac") of the Lewino-1G2 well on its 221,000 acre (894 km2) Gdansk W Concession in Poland's northern Baltic Basin.The initial vertical frac was performed to test both the fracture stimulation and flow potential of the lower Ordovician shale and to gather necessary data for future horizontal drilling and multi-staged hydraulic fracture stimulation. The Company announced on 16 September 2013 that, in conjunction with United Oilfield Services (UOS) and other specialist frac consultancies, it would use the data to optimise further frac operations in the well. That design work has now been completed, materials and services have been ordered, and mobilisation of the snubbing unit to prepare the well for the fracs will commence shortly. As with any drilling operation, the timescales can be subject to some variation, however, the snubbing unit will be mobilised in the coming days and the Company expects flowback, clean-up and testing to begin at the end November or early December,

During these operations, two further fracs will be performed on Lewino-1G2. The first will be a re-frac of the existing zone, while the second will frac a new overlying part of the Ordovician Caradoccian formation. The design work is expected to optimise these operations by changing several parameters relative to the initial frac, including the use of ceramic propant, which has significantly higher strength than sand, reducing propant crushing, and therefore expected to yield better frac conductivity and communication to the wellbore. Although this is believed to be the first time that ceramic propant has been used in Poland, it is very widely used in the US.

Executive Chairman, Oisin Fanning, commented:

"We are pleased with our optimisation plans for the next stage of the frac stimulation operations on Lewino-1G2. These have been based on the valuable data acquired from the first frac, and have had input from all parties involved. We look forward to reporting back on our progress."

Qualified Person

Joel Price, who has reviewed this update, has 20 years' experience in the oil & gas industry and is a member of the Society of Petroleum Engineers. He holds a BA in Natural Sciences from Cambridge University, an MEng from Heriot-Watt University, and an MBA from Durham University. Joel is currently the Head of Engineering for San Leon Energy and is based in San Leon's London office.

-Ends-

 

San Leon Energy plc
 
+353 1291 6292
 
Oisin Fanning, Executive Chairman
 
 
 
 
Fox-Davies Capital Limited
 
+44 (0) 20 3463 5000
 
Daniel Fox-Davies
 
 
Oliver Stansfield
 
 
Jonathan Evans
 
 
 
 
Macquarie Capital (Europe) Limited
 
+44 (0) 20 3037 2000
 
Steve Baldwin
 
 
Nicholas Harland
 
 
 
 
FirstEnergy Capital LLP
 
+44 (0) 20 7448 0200
 
Hugh R. Sanderson
 
 
Jonathan Wright
 
 
David van Erp
 
 
 
 
Westhouse Securities Ltd
Nominated Adviser
+44 (0) 207 601 6000
 
Richard Johnson
 
 
Antonio Bossi
 
 
 
 
Vigo Communications
Financial Public Relations
+44 (0) 207 016 9573
 
Patrick d’Ancona
 
 
Chris McMahon
 
 
 
 
College Hill
Investor Relations Adviser
+44 (0) 20 7457 2020
 
David Simonson
 
 
Alexandra Roper
 
 
This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGGQCUUPWGQP
Date   Source Headline
11th Jul 20227:30 amRNSRestoration - San Leon Energy plc
8th Jul 20224:43 pmRNSPublication of Admission Document & Restoration
8th Jul 20228:01 amRNSFinal results
8th Jul 20228:00 amRNSProposed Transactions
1st Jul 20227:00 amRNSUpdate on investment in the Oza field, Nigeria
24th Jun 20227:00 amRNSFurther update on the Potential Transaction
26th May 20224:38 pmRNSUpdate on development of the Oza field, Nigeria
10th May 20227:00 amRNSUpdate on development of the Oza field, Nigeria
3rd May 20224:28 pmRNSExtension & update to investment in the Oza field
29th Apr 20227:00 amRNSFurther update on the potential transaction
24th Mar 20221:21 pmRNSUpdate on development of the Oza field, Nigeria
28th Feb 20227:00 amRNSUpdate on potential transaction
15th Feb 20227:00 amRNSFurther loan and acquisition of interest in ELI
1st Feb 20227:00 amRNSFurther extension of Conditional Payment Waiver
31st Jan 20227:01 amRNSChange of adviser
31st Jan 20227:00 amRNSSuccessful conclusion of the TAQA litigation
27th Jan 20223:58 pmRNSAmendment to investment in the Oza field, Nigeria
4th Jan 20227:00 amRNSFurther extension of Conditional Payment Waiver
24th Dec 20217:00 amRNSUpdate on potential transaction
1st Dec 20217:01 amRNSFurther extension of Conditional Payment Waiver
1st Dec 20217:00 amRNSAppointment of CFO
29th Nov 20217:00 amRNSUpdate on potential transaction
2nd Nov 20213:28 pmRNSFurther Extension of Payment Waiver & CFO update
2nd Nov 20211:52 pmRNSUpdate on investment in Oza Field, Nigeria
21st Oct 20213:24 pmRNSUpdate on investment in Oza Field, Nigeria
1st Oct 20214:30 pmRNSFurther extension of Conditional Payment Waiver
1st Oct 20217:00 amRNSUpdate on investment in Oza Field, Nigeria
30th Sep 202112:28 pmRNSResult of AGM
30th Sep 20217:00 amRNSUnaudited Interim Results
20th Sep 20217:00 amRNSExtension of Conditional Payment Waiver
3rd Sep 20217:00 amRNSNotice of Annual General Meeting
1st Sep 20212:11 pmRNSUpdate on investment in Oza Field, Nigeria
12th Aug 20217:00 amRNSUpdate on investment in Oza Field, Nigeria
9th Aug 20217:00 amRNSUpdate re: ELI Loan Repayment
3rd Aug 20217:00 amRNSDirectorate Change
15th Jul 20211:26 pmRNSUpdate on investment in Oza Field, Nigeria
12th Jul 20217:00 amRNSUpdate on proposed transaction
7th Jul 20217:00 amRNSConditional Payment Waiver for MLPL Loan Notes
29th Jun 20217:00 amRNSFinal Results
24th Jun 202110:12 amRNSProposed transactions & AIM suspension
24th Jun 20219:45 amRNSSuspension - San Leon Energy plc
24th Jun 20217:00 amRNSConditional acquisition of further interest in ELI
17th Jun 20212:09 pmRNSUpdate on investment in Oza Field, Nigeria
28th May 20217:00 amRNSUpdate on investment in Oza Field, Nigeria
7th May 20217:00 amRNSBoard changes
14th Apr 20217:00 amRNSHolding in Company
9th Apr 20217:00 amRNSUpdate on investment in Oza Field, Nigeria
24th Mar 20212:10 pmRNSDirector Option Grants
16th Mar 20217:00 amRNSOperational update
11th Mar 20217:00 amRNSUpdate on migration from CREST

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.