Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Drilling Report

16 Sep 2013 07:00

RNS Number : 0221O
San Leon Energy PLC
16 September 2013
 

16 September 2013

San Leon Energy Plc

("San Leon" or the "Company")

Lewino-1G2 Initial Vertical Frac and Test Results

San Leon is pleased to announce it has completed the flow back, testing and initial analysis of its first vertical hydraulic fracture stimulation ("frac") of the Lewino-1G2 well on its 221,000 acre (894 km2) Gdansk W Concession in Poland's northern Baltic Basin. This initial vertical frac was performed to test frackability and the flow potential of the lower Ordovician shale and to gather critical data necessary for future horizontal drilling and multi-staged hydraulic fracture stimulation, targeted on obtaining commercial flow rates from the Ordovician and Lower Silurian shales.

The frac was performed through a 4.5-meter perforated interval, at a depth of 3,545.5 to 3,550 meters, in the highly prospective Ordovician Caradocian shale. The frac pumped over 11,000 barrels of fluid and 95 tons of sand propant at an average of 120 barrels per minute with a maximum pressure of 12,200 psi. This is the highest frac pump rate at pressure ever performed outside the US.

Approximately 25% of the frac fluid was recovered along with a small, consistent flow of burnable gas. The well flared gas on several occasions including initial opening of the well after the frac and following a shut-in period after approximately 20% of the frac fluid was recovered.

Results/Conclusions:

· The Gdansk W Concession is located in the gas/condensate window with excellent gas quality estimated to be 98% burnable gas, including 75% methane (C1), 15% ethane (C2), and 8% C3-C10. Based upon initial results the company expects a modest condensate yield from the formation.

· Due to the depth and other rock properties encountered, the use of larger, high-strength propant will be required in future fracs. The Company believes this, and increased propant concentration in the fracs, will significantly increase fracture conductivity and ultimately provide a significant improvement in flow rates.

· The frac fluid chemistry is being redesigned with the benefit of data received from this first frac, and is expected further to improve productivity.

Based upon the significant amount of data collected in this first frac the Company is planning additional vertical fracs in Lewino-1G2 in the Ordovician, to include a re-fracing at the existing fractured zone. Design peer review work is on-going with several other experienced engineering firms in support of UOS' redesign, including APEX Engineering in the USA and Fenix in The Netherlands.

The Company is also in talks with UOS to design, and execute immediately thereafter, fracs in a 1500-metre horizontal section, which the Company expects to unlock the potential of this play.

The Company estimates ongoing operations to take place in early Q4 2013 subject to final design work and regulatory approvals. The Company has already contracted UOS for the additional work at Lewino as part of its on-going services agreement.

Executive Chairman, Oisin Fanning commented:

"The initial results and data collected at Lewino-1G2 are very encouraging and easily justify continued operations on this concession. The amount of data collected along with the flow of burnable gas from the well is an excellent result for this initial frac and test at Lewino and exceeded our expectations for San Leon's first frac in the basin and further underpins our belief that we are in one of the highest potential blocks in the basin. As is seen throughout North America, each working shale is different, and in fact the same shale formations can vary significantly in the same basin. We are at a critical stage in our shale gas exploration in Poland and we are excited to have flowed gas to surface and to have recovered the necessary information to continue to prove this play. Our knowledge of this system has increased exponentially and we believe has accelerated our understanding of the commercial potential of shale gas production in Poland."

Qualified person

Joel Price, who has reviewed this update, has 19 years' experience in the oil & gas industry and is a member of the Society of Petroleum Engineers. He holds a BA in Natural Sciences from Cambridge University, an MEng from Heriot-Watt University, and an MBA from Durham University. Joel is currently the Head of Engineering for San Leon Energy and is based in San Leon's London office.

For further information contact:

San Leon Energy Plc

Tel: +353 1291 6292

Oisin Fanning, Executive Chairman

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

John Dwyer

Fox Davies Capital

Tel: +44 (0) 20 3463 5000

Daniel Fox-Davies

Susan Walker

FirstEnergy Capital LLP

Tel: +44 (0) 20 7448 0200

Hugh R. Sanderson

David van Erp

Westhouse Securities (Nominated Advisor)

Tel: +44 (0) 20 7601 6100

Richard JohnsonAntonio Bossi

College Hill Associates

Tel: +44 (0) 20 7457 2020

David SimonsonAlexandra Roper

Plunkett Public Relations

Tel: +353 (0) 1 284 4414 / +353 (0) 87 826 0833

Sharon Plunkett

Jennie Cotter

 

www.sanleonenergy.com 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFVLAAIELIV
Date   Source Headline
29th Nov 20113:21 pmRNSExercise of Options
17th Nov 20117:00 amRNSLewino 1G-2 Drilled
11th Nov 20115:47 pmRNSCompletion of acquisition
11th Nov 20119:52 amRNSCommencement of drilling
10th Nov 20115:10 pmRNSAdmission of new shares re Realm
2nd Nov 20119:10 amRNSRealm Energy shareholder approval
21st Oct 20113:15 pmRNSResults of Belvedere-1 Well
19th Oct 20117:44 amRNSBarryroe Update
18th Oct 20112:30 pmRNSNew Licencing Option
12th Oct 20113:48 pmRNSSpudding of Belvedere-1 Well
12th Oct 201110:11 amRNSRealm Energy Acquisition Update
5th Oct 201112:30 pmRNSHolding(s) in Company
3rd Oct 20115:10 pmRNSDirector/PDMR Shareholding
30th Sep 20117:00 amRNSInterim Results
29th Sep 20117:00 amRNSResults of Chopin-1 Well
26th Sep 20111:04 pmRNSCommencement of drilling
23rd Sep 201112:29 pmRNSResult of AGM
21st Sep 201111:34 amRNSRealm Energy Announcement
5th Sep 20113:17 pmRNSCommencement of drilling
1st Sep 201111:06 amRNSBelvedere -1 exploration well
31st Aug 20119:47 amRNSInvestor Presentation
26th Aug 20118:35 amRNSAcquisition of Realm Energy
12th Aug 20114:35 pmRNSPrice Monitoring Extension
2nd Aug 20117:00 amRNSCompletion of 3D Seismic
29th Jul 20117:00 amRNSDrilling Update
19th Jul 20112:09 pmRNSAdditional Listing
30th Jun 20117:00 amRNSFinal Results
23rd Jun 201110:12 amRNSOperational update
14th Jun 201110:13 amRNSHolding(s) in Company
3rd May 201111:14 amRNSCommencement of Seismic Survey
29th Mar 20117:00 amRNSOperational Update
23rd Mar 20112:28 pmRNSAdditional Listing
22nd Mar 20117:00 amRNSJoint Participation Agreement
18th Mar 20118:35 amRNSCommencement of Seismic Servey
10th Mar 20117:00 amRNSRockall Licence Update
2nd Mar 201110:18 amRNSHolding(s) in Company
8th Feb 20114:18 pmRNSAdditional Listing
4th Feb 20117:00 amRNS3D Seismic Survey Completed
3rd Feb 20117:28 amRNSReplacement: Durresi Licence Approval
3rd Feb 20117:00 amRNSDurresi Licence Approval
26th Jan 20119:50 amRNSAdditional Listing
18th Jan 20117:00 amRNSHolding(s) in Company
14th Jan 20117:00 amRNSApproval received
12th Jan 20114:44 pmRNSHolding(s) in Company
12th Jan 20117:00 amRNSRockall licence update
6th Jan 20112:14 pmRNSBoard Changes
5th Jan 201112:11 pmRNSHolding(s) in Company
31st Dec 20108:12 amRNSCompletion of Placing
30th Dec 201012:40 pmRNSResult of EGM
22nd Dec 20104:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.