Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSIMEC Atlantis Energy Regulatory News (SAE)

Share Price Information for SIMEC Atlantis Energy (SAE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.10
Bid: 1.00
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.20 (20.00%)
Open: 1.10
High: 1.10
Low: 1.10
Prev. Close: 1.10
SAE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Turbine Construction Contract with Lockheed Martin

30 Mar 2015 07:00

RNS Number : 7835I
Atlantis Resources Limited
30 March 2015
 

30 March 2015

 

ATLANTIS RESOURCES LIMITED

("Atlantis" or the "Company")

 

Turbine Construction Contract with Lockheed Martin

 

Atlantis, majority owner of the world's largest tidal stream energy project, MeyGen, announces today that it has executed a construction contract with global defence contractor Lockheed Martin, for the delivery of Atlantis' new 1.5 megawatt AR1500 turbine to fulfil the Company's MeyGen project turbine supply obligations. The 18 metre rotor diameter AR1500 turbine, scheduled for delivery dockside in Scotland in 2016, will be one of the largest capacity single rotor turbines ever built. The AR1500 turbine will have an active rotor pitching system and full nacelle yawing capability.

 

The Lockheed Martin turbine construction contract scope includes the manufacture of the steel turbine housing, the assembly of all the turbine modules (including the gearbox and generator) and the systems integration and quality assurance of the overall turbine delivery programme. Lockheed and Atlantis are working with the supply chain in Scotland to maximise local content for the AR1500.

 

This announcement marks the latest step in the Atlantis - Lockheed Martin relationship and builds on Lockheed Martin's contribution under the AR1500 detailed design contract. The yaw drive and variable pitch system that will be integrated into the AR1500 are being developed and manufactured by Lockheed Martin as part of their commitment under the existing technology partnership teaming agreement struck between Atlantis and Lockheed in 2013.

 

Atlantis is also pleased to announce that contractors will today commence horizontal directional drilling operations at the MeyGen site in Caithness, to create the bores for the cables which will link the onshore site at Ness of Quoys with the four subsea turbines. Construction works have been underway at the onshore site since January to prepare the necessary infrastructure for this important phase of the project.

 

 

Tim Cornelius, CEO of Atlantis, commented:

 

"This new multi-million pound contract with Lockheed Martin further develops the strong relationship that exists between the two companies who are at the forefront of tidal power generation. Lockheed Martin has been a strong partner and supporter of Atlantis for a number of years and we look forward to continuing to work alongside this global technology giant as we continue to deliver turbine systems for installation on the MeyGen project going forward. "

 

 

For further information please contact:

 

Atlantis Resources Limited

via FTI Consulting

Tim Cornelius, Chief Executive Officer

Duncan Black, Chief Financial Officer

Peel Hunt LLP (Nominated Adviser and Broker)

+44 (0) 20 7418 8900

Daniel Harris / Jock Maxwell MacDonald

FTI Consulting

+44 (0) 20 3727 1000

Ben Brewerton / Alex Beagley / Stephanie Blott / James Styles

 

 

Atlantis names Lockheed Martin as principal contractor to deliver AR1500 turbine to the MeyGen tidal power project

 

· Lockheed Martin awarded construction contract to build Atlantis' new 1.5MW AR1500 tidal turbine for the MeyGen project.

 

· Atlantis boosts strong partnership following initial collaboration on design optimisation of the AR1500.

 

· Construction continues on the 398MW MeyGen project as horizontal drilling operations commence on-site.

 

 

Atlantis, majority owner of the world's largest tidal stream energy project, MeyGen, announces today that it has executed a construction contract with global defence contractor Lockheed Martin for the delivery of Atlantis' new 1.5 megawatt AR1500 turbine to fulfil the Company's MeyGen project turbine supply obligations.

 

The 18 metre rotor diameter AR1500 turbine, scheduled for delivery dockside in Scotland in 2016, will be one of the largest capacity single rotor turbines ever built. The AR1500 turbine will have an active rotor pitching system and full nacelle yawing capability.

 

The Lockheed Martin turbine construction contract scope includes the manufacture of the steel turbine housing, the assembly of all the turbine modules (including the gearbox and generator) and the systems integration and quality assurance of the overall turbine delivery programme. Lockheed and Atlantis are working with the supply chain in Scotland to maximise local content for the AR1500.

 

This announcement marks the latest step in the Atlantis - Lockheed Martin relationship and builds on Lockheed Martin's contribution under the AR1500 detailed design contract. The yaw drive and variable pitch system that will be integrated into the AR1500 are being developed and manufactured by Lockheed Martin as part of their commitment under the existing technology partnership teaming agreement struck between Atlantis and Lockheed in 2013.

 

Tim Cornelius, CEO of Atlantis, commented:

 

"This new multi-million pound contract with Lockheed Martin further develops the strong relationship that exists between the two companies who are at the forefront of tidal power generation. Lockheed Martin has been a strong partner and supporter of Atlantis for a number of years and we look forward to continuing to work alongside this global technology giant as we continue to deliver turbine systems for installation on the MeyGen project going forward."

 

Atlantis has also announced that contractors have commenced horizontal directional drilling operations at the MeyGen site in Caithness, to create the bores for the cables which will link the onshore site at Ness of Quoys with the four subsea turbines. Each of the four bores will be approximately 550m long, and is designed to contain a 4.4kV cable through which tidally generated energy can be exported from the turbines to the onshore grid connection. The drilling is expected to take four months and will be carried out by Manchester-based O'Connor Utilities Ltd. Construction works have been underway at the onshore site since January to prepare the necessary infrastructure for this important phase of the project.

 

MeyGen was one of the first tidal projects in the world to secure the necessary planning consent, lease agreement, grid connection and power purchase agreement in order to begin onshore and offshore construction. Construction of the first phase of the project is expected to take place throughout 2015 and 2016, with first power being delivered to the grid for sale in 2016.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
CNTPGUMCWUPAPUB
Date   Source Headline
13th Dec 20217:00 amRNSSale of Green Highlands Renewables
10th Dec 202110:43 amRNSShare Issuance
9th Dec 202112:42 pmRNSNotice of EGM Results
8th Dec 202111:05 amRNSSecond Price Monitoring Extn
8th Dec 202111:00 amRNSPrice Monitoring Extension
1st Dec 20211:50 pmRNSTotal Voting Rights
30th Nov 202111:05 amRNSSecond Price Monitoring Extn
30th Nov 202111:00 amRNSPrice Monitoring Extension
29th Nov 20214:41 pmRNSSecond Price Monitoring Extn
29th Nov 20214:36 pmRNSPrice Monitoring Extension
29th Nov 20212:01 pmRNSPrice Monitoring Extension
29th Nov 20219:56 amRNSDirectorate Change
26th Nov 20217:00 amRNSGovernment gives the green light for blue energy
24th Nov 20217:59 amRNSExtraordinary General Meeting
9th Nov 20217:00 amRNSShare Issuance
1st Nov 20217:00 amRNSTotal Voting Rights
26th Oct 20217:00 amRNSDirectorate Change
18th Oct 20212:11 pmRNSHolding(s) in Company
18th Oct 20212:09 pmRNSHolding(s) in Company
18th Oct 20211:59 pmRNSShare Issuance
18th Oct 20219:06 amRNSSecond Price Monitoring Extn
18th Oct 20219:00 amRNSPrice Monitoring Extension
13th Oct 20212:05 pmRNSSecond Price Monitoring Extn
13th Oct 20212:00 pmRNSPrice Monitoring Extension
7th Oct 202111:05 amRNSSecond Price Monitoring Extn
7th Oct 202111:00 amRNSPrice Monitoring Extension
7th Oct 20219:00 amRNSPrice Monitoring Extension
7th Oct 20217:16 amRNSDuplicate - SAE Uskmouth permit update
7th Oct 20217:00 amRNSSAE Uskmouth permit update
7th Oct 20217:00 amRNSOperational Update
6th Oct 20219:23 amRNSBlock listing Interim Review
6th Oct 20217:00 amRNSHolding(s) in Company
29th Sep 20219:06 amRNSSecond Price Monitoring Extn
29th Sep 20219:00 amRNSPrice Monitoring Extension
29th Sep 20217:00 amRNSResults of Placing
28th Sep 20215:22 pmRNSPlacing announcement
28th Sep 20215:19 pmRNSInterim Results (unaudited)
1st Sep 20217:00 amRNSTotal Voting Rights
19th Aug 20218:13 amRNSResult of AGM
18th Aug 20217:00 amRNSShare Issuance
28th Jul 20217:00 amRNSShare Issuance
23rd Jul 20212:05 pmRNSSecond Price Monitoring Extn
23rd Jul 20212:00 pmRNSPrice Monitoring Extension
23rd Jul 20219:05 amRNSSecond Price Monitoring Extn
23rd Jul 20219:00 amRNSPrice Monitoring Extension
23rd Jul 20217:00 amRNSCompany update
21st Jul 20217:00 amRNSDirectorate Change
16th Jul 20217:00 amRNSNotice of AGM
30th Jun 202111:05 amRNSSecond Price Monitoring Extn
30th Jun 202111:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.