GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksResolute Mining Regulatory News (RSG)

Share Price Information for Resolute Mining (RSG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 27.00
Bid: 27.00
Ask: 27.60
Change: 0.00 (0.00%)
Spread: 0.60 (2.222%)
Open: 27.00
High: 27.40
Low: 27.00
Prev. Close: 27.30
RSG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ravenswood Upgrade Commences

28 Aug 2019 07:00

RNS Number : 3737K
Resolute Mining Limited
28 August 2019
 

28 August 2019

Resolute Mining Limited

(Resolute or the Company)

 

Ravenswood Upgrade Commences

 

Stage 1 of Ravenswood Expansion Project Approved

Recommissioning of third mill to increase processing capacity to 5Mtpa

Stage 1 target production of ~80kozpa at an AISC of ~A$1,600/oz

Stage 1 total capital investment of only A$6 million

Decision on full REP pending: 200koz annually for 15 years from 2022`

Highlights

The upgrade of the Ravenswood Gold Mine envisaged by the Ravenswood Expansion Project has commenced

Total site processing capacity to be increased to 5Mtpa by the end of 2019

Processing of beneficiated low-grade stockpiles to generate sustained positive operating cash flows ahead of the full Ravenswood Expansion Project

Stage 1 expansion to target production of ~80,000oz of gold at an AISC of ~A$1,600/oz in 2020

Ongoing strategic and technical review of the Ravenswood Expansion Project continues to identify efficiency and scale improvements with potential to deliver ~200,000oz annually for 15 years

Final investment decision for full Ravenswood Expansion Project expected in late 2019 with timeline to complete implementation ~24 months post investment decision

 

Resolute Mining Limited (Resolute or the Company) (ASX/LSE: RSG) is pleased to announce that the first stage of the Ravenswood Expansion Project (REP) has commenced at the Ravenswood Gold Mine (Ravenswood) in Queensland, Australia. Stage 1 of the REP is an immediate low capital opportunity to enable the processing of available stockpiled material to target production of 80,000 ounces (oz) of gold at a reasonable cost to ensure Ravenswood generates positive operating cashflows for Resolute during the subsequent development phases of the REP.

Stage 1 of the REP includes the recommissioning of the third grinding mill at the Nolans Processing Plant which will enable a return to a processing rate of 5 million tonnes per annum (Mtpa). The three existing mills at Ravenswood were operational prior to 2011 at throughput rates of approximately 5Mtpa and predominantly processed material from the Sarsfield open pit. Following the suspension of open pit mining at Sarsfield, the Nolans Processing Plant was de-rated to 1.5Mtpa to exclusively process the higher-grade ore mined from the Mt Wright Underground Mine. 

Recommissioning of the third mill has commenced, and the mill is expected to be operational by the end of 2019. The increased processing capacity will allow Resolute to process greater volumes of the low-grade material stockpiled during previous open pit operations at Sarsfield. Available stockpiled material currently includes an Inferred Mineral Resource of 32.6 million tonnes (Mt) at 0.4 grams per tonne of gold (g/t Au) for 390,000oz.

Beneficiation, via a combination of contract crushing and screening and owner-operated facilities, will result in an uplift in head grades to 0.5-0.6g/t Au, and annual production to approximately 80,000oz, with the All-In Sustaining Cost (AISC) expected to be approximately A$1,600/oz from the end of 2019.

Many of the historic open pit stockpiles at Ravenswood contain very low gold grades in the coarse size fractions, rendering them highly amenable to beneficiation. Beneficiation is the process by which the grade of ore is enhanced by discarding size fractions containing largely barren material. Stage 1 of the REP envisages beneficiation of the available stockpiled material, via a combination of contract crushing and screening and owner-operated facilities, to raise head grades to approximately 0.6g/t Au.

As a consequence of increased milling capacity and an uplift in head grades from beneficiation, Stage 1 is expected to provide sustainable annual production at Ravenswood from the end of 2019. As a result, Ravenswood will produce positive operating cash flows for the Company in 2020 and future years, pending and during any further REP development stages.

The recommissioning of the third grinding mill at the Nolans Processing Plant is the first step in the eventual upgrading of the plant to support the REP. The strategic review of the REP which commenced in early 2019 continues to provide strong encouragement for higher throughput and production rates than envisaged in earlier studies. This work indicates that the development period for the full REP is estimated at 24 months and is demonstrating that the full REP has the potential for Ravenswood to deliver approximately 200,000oz of gold annually for 15 years from 2022.

 

Please see image in the full version of the announcement at www.rml.com.au

Figure 1: Nolans Processing Plant with third grinding mill (Mill #3) to be recommissioned to the left of picture. Existing grinding mills located in bottom right of picture

 

Managing Director and CEO, Mr John Welborn, highlighted the importance of the increase in processing capacity at Ravenswood and the implications of beneficiation on the potential for larger scale production over a long mine life in an upgraded REP:

"Increasing the plant capacity at Ravenswood to its historical rate of 5Mtpa and using this capacity to process available low grade stockpiles, will deliver an immediately cashflow positive, profitable mining operation at Ravenswood. As a result, this solution allows Resolute to focus on the ultimate transformation of Ravenswood into a large scale, low cost tier one Australian gold mining operation with an exceptionally long mine life."

"The successful beneficiation trials conducted by Resolute, and the commissioning of a new beneficiation circuit at the Nolans Processing Plant, is consistent with a core strength of Resolute: mining smarter, using advanced technologies and innovative techniques to create sustainable value for all our stakeholders."

"Recently Resolute announced an increase of one million ounces of gold in Ore Reserves at Ravenswood. With almost three million ounces of gold in Ore Reserves the Company is now directing its ongoing study work to focus on an optimised Expansion Project that can produce 200,000oz annually over a 15-year mine life. This outcome will deliver considerable economic benefits to the Ravenswood community, the Queensland Government and Resolute shareholders."

 

Please see image in the full version of the announcement at www.rml.com.au

Figure 2: Nolans Processing Plant showing new beneficiation circuit. Reject material from beneficiation is located at the top right

 

Nolans Processing Plant

The Nolans Processing Plant currently has capacity to treat ~3Mtpa of gold bearing ore through a three-stage crushing circuit. The existing crushing circuit uses a jaw crusher, along with secondary and tertiary cone crushers to reduce the run-of-mine ore to a size suitable for grinding (nominally 18mm). The Nolans Processing Plant includes a beneficiation circuit, which allows production of two products; an oversize fraction which is largely devoid of gold, and a grade-enriched fine fraction which reports to the crushed ore stockpile ready for milling. The oversize fraction is conveyed and transported to a waste stockpile. The existing crushing circuit will be supplemented by contract crushing, which will produce additional screened product for direct feed to the grinding circuit.

The grinding circuit is currently configured in a conventional, closed-circuit primary (Mill #1) and regrind (Mill #2) arrangement. Crushed ore is slurried with water, and ground in the primary mill. Following classification, remaining coarse material is further processed in the regrind mill.

The ground slurry from both the primary and regrind mills is pumped to cyclone classifiers, which produce a coarse underflow fraction for regrinding and a fine overflow fraction for gold leaching. A gravity concentrator also recovers gold from the cyclone underflow.

The upgraded grinding circuit will utilise the spare 4,000kW ball mill (Mill #3) to increase the overall primary and regrind milling capacity. Mill #3 is to be refurbished and recommissioned with some minor modifications being made to the previous slurry pumping and classification arrangements. Mill #1 and Mill #2, both rated at 3,250 kW, will continue to operate in their existing arrangement.

Ravenswood Expansion Project Strategic Review

The updated Ore Reserve and Mineral Resource for Ravenswood (see ASX Announcement dated 22 July 2019) supports Resolute's ongoing strategic review and optimisation study work. As part of Resolute's preparation for the REP, the Company has undertaken various activities including funding and development of a new State School, drilling of previously underexplored areas between the Sarsfield and Buck Reef West pits, examination of enhanced crushing and milling strategies, and the redesign and re-optimisation of the open pits. In late 2018, the Company commissioned a new beneficiation circuit as part of the existing Nolans Processing Plant. This circuit has demonstrated, on a commercial scale, Resolute's ability to upgrade low grade ores via simple two-stage crushing and screening.

The Company is expecting to conclude the REP strategic review during calendar 2019 and will update the market with completed study work and decisions on capital commitments and project timing and funding immediately the review is concluded.

For further information, contact:

 

John Welborn

Managing Director & CEO

 

Jeremy Meynert

General Manager - Business Development & Investor Relations

 

Contact Information

 

Resolute

John Welborn, Managing Director & CEO

Jeremy Meynert, General Manager - BD & IR

Telephone: +61 8 9261 6100

Email: contact@rml.com.au

Web: www.rml.com.au

 

Berenberg (UK Corporate Broker)

Matthew Armitt / Detlir Elezi

Telephone: +44 20 3207 7800

 

 

 

Tavistock (UK Public Relations)

Jos Simson / Charles Vivian / Emily Fenton / Annabel de Morgan

Telephone: +44 207 920 3150 / +44 778 855 4035

Email: resolute@tavistock.co.uk

 

About Resolute

Resolute is a successful, dividend paying gold miner with more than 30 years of experience as an explorer, developer and operator of gold mines in Australia and Africa which have produced more than 8 million ounces of gold.

Resolute's production and cost guidance for the 12 months to 31 December 2019 has been updated to 400,000oz of gold at an AISC of US$960/oz following the acquisition of Toro Gold Limited.

Resolute owns four gold mines. Its flagship asset is the world class Syama Gold Mine in Mali (Syama) which can produce more than 300,000 ounces of gold per annum from existing processing infrastructure. Resolute is currently commissioning the world's first fully automated underground mine at Syama which will deliver a low cost, large scale operation with a mine life beyond 2032. The Mako Gold Mine in Senegal is a high quality, low cost asset with average annual production of ~140,000 ounces of gold. The Ravenswood Gold Mine in Australia and the Bibiani Gold Mine in Ghana are existing largescale assets which provide Resolute with significant production growth potential. Resolute has a pathway to annual gold production in excess of 500,000 ounces from a Global Mineral Resource base of more than 18 million ounces of gold.

Resolute trades on the Australian Securities Exchange (ASX) and the London Stock Exchange (LSE) under the ticker RSG.

 

ASX/LSE: RSG Capital Summary

Fully Paid Ordinary Shares: 900,888,230

Current Share Price:A$1.68 as at 27 August 2019

Market Capitalisation: A$1.51 Billion

FY19 Guidance (to 31 December):

400,000oz @ AISC US$960/oz

Board of Directors

Mr Martin Botha Non-Executive ChairmanMr John Welborn Managing Director & CEO

Ms Yasmin Broughton Non-Executive Director

Mr Mark Potts Non-Executive Director

Ms Sabina Shugg Non-Executive Director

Mr Peter Sullivan Non-Executive Director

Contact

John Welborn Managing Director & CEO

Jeremy Meynert GM - BD & IRLevel 2, Australia Place | 15-17 William StPerth, Western Australia 6000T: +61 8 9261 6100 | F: +61 8 9322 7597E: contact@rml.com.au

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCDMGZRKRGGLZG
Date   Source Headline
28th Jun 20227:00 amRNSAppendix 3Y Terence Holohan
16th Jun 20227:00 amRNSHigher Grade mineralisation intersected
23rd May 20227:00 amRNSAppendix 3X
23rd May 20227:00 amRNSTerry Holohan formally appointed as CEO & MD
20th May 20229:39 amRNSDetails of Voting at Annual General Meeting
9th May 20227:00 amRNSMining Indaba Presentation
28th Apr 20227:00 amRNSMarch 2022 Quarterly Activities Report
26th Apr 20228:27 amRNSQuarterly Conference Call Details
19th Apr 20227:00 amRNSResolute COO Terry Holohan to be appointed CEO
19th Apr 20227:00 amRNSAppendix 3Z Stuart Gale
19th Apr 20227:00 amRNSAnnual General Meeting Withdrawal of Resolutions
14th Apr 20227:00 amRNSAGM Notice of Access
14th Apr 20227:00 amRNSNotice of Annual General Meeting
4th Apr 20227:41 amRNSNotice of ceasing to be a substantial holder
1st Apr 20228:41 amRNSAnnual General Meeting Advance Notice
1st Apr 20227:00 amRNSSuccessful completion of Syama sulphide shutdown
30th Mar 20222:45 pmRNSReport on Payments to Governments
29th Mar 20228:14 amRNSCorporate Governance Statement & Appendix 4G
29th Mar 20228:10 amRNS2021 Sustainability Report
29th Mar 20228:07 amRNS2021 Annual Report
10th Mar 20227:00 amRNSSuccessful Extension of Revolving Credit Facility
4th Mar 20227:00 amRNSLife of Mine Production Update
4th Mar 20227:00 amRNSOre Reserves and Mineral Resource Statement
24th Feb 20227:00 amRNSPreliminary Financial Results Presentation
24th Feb 20227:00 amRNSAppendix 4E Preliminary Final Report
24th Feb 20227:00 amRNSPreliminary Final Report
22nd Feb 20228:37 amRNSPreliminary Results Conference Call Details
17th Feb 20228:25 amRNSTabakoroni Resource Increases 40%
8th Feb 20224:41 pmRNSSecond Price Monitoring Extn
8th Feb 20224:35 pmRNSPrice Monitoring Extension
31st Jan 20227:00 amRNSSale of Orca Shares
20th Jan 20227:00 amRNSQuarterly Activities Report
18th Jan 20229:07 amRNSDec 2021 Quarterly Conference Calls - amended date
18th Jan 20227:52 amRNSDecember 2021 Quarterly Conference Calls
11th Jan 20227:00 amRNSOperational Update
8th Dec 20217:00 amRNSTotal Voting Rights
3rd Dec 202110:24 amRNSIssue of Equity
29th Nov 20217:00 amRNSChange of substantial holder interests
29th Nov 20217:00 amRNSMacquarie Australia Conference Presentation
23rd Nov 20217:00 amRNSIssue of Equity
29th Oct 20217:00 amRNSAppendix 3X - Simon Jackson
29th Oct 20217:00 amRNSDirector Appointment and Resignation
29th Oct 20217:00 amRNSAppendix 3Z - Yasmin Broughton
29th Oct 20217:00 amRNSSeptember 2021 Quarterly Activities Statement
28th Oct 20217:00 amRNSNotice of Results
27th Sep 20217:00 amRNSSyama Sulphide Processing Circuit Update
13th Sep 202110:36 amRNSResolute Presentation at Gold Forum Americas 2021
10th Sep 20217:00 amRNSUS$30 million voluntary debt repayment
10th Sep 20217:00 amRNSAppendix 3Y - Mark Potts
9th Sep 202111:11 amRNSAppendix 3Y Mark Potts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.