Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0255    0.00 (0.00%)
Bid:
0.024
Ask:
0.027
Spread: 0.003 (12.50%)
Market Cap: £2.44m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update

30 Sep 2010 14:13

RNS Number : 6249T
Red Rock Resources plc
30 September 2010
 



RED ROCK RESOURCES PLC

Update

Dated: 30 September 2010

 

Red Rock Resources plc ("Red Rock" or the "Company"), the gold mining and exploration company with projects in Kenya and Colombia, and interests in steel feed and uranium, reports on progress at its operations.

 

·; Colombian plant ahead of schedule

·; Increase in initial planned capacity at El Limon plant

·; Metallurgical analysis to determine tailings process route under way in Kenya

·; Annual results released at Jupiter Mines Ltd and Resource Star Ltd

 

Colombia gold project:

 

The final $400,000 loan tranche has been advanced to Mineras Four Points SA ("MFP"). The entire $2,000,000 loan to MFP required under the terms of the Funding and Co-Operation Agreement ("Agreement") announced on 10th June 2010 has now been advanced, from funds provided by Red Rock.

 

There are no further performance requirements on the part of Red Rock, and MFP has provided security as required by Red Rock, so that the Agreement is fully operative.

 

At the El Limon mine, the target date for the plant renovation to be complete and for production to recommence is still 30th November 2010, although currently work is ahead of schedule. The initial capacity is now planned at 150 tons per day rather than the previous target of 100 tons per day.

 

Mine safety work has proceeded well, with a second access now provided up to Level 0, and planned to be brought up to surface. Improvements to the ventilation system and replacement of air piping, and installation of the new winch, wire and bucket, are accomplished.

 

A substation with 1000 KW transformers is almost complete, and back up generators with 800 KW capacity are expected to be refurbished and operational within one month. Rewiring within the plant is not accomplished, but is estimated to take two weeks.

 

The last work on the conveyors, crushers, and mill is being completed, with an estimated timing of 10 days to 3 weeks.

 

The plant is near completion, with new 5 ton tanks expected to be installed within 2 weeks, and some adjustments to parts of the circuit likely to be required to fine-tune the plant after receipt of metallurgical test results from Canada, which are expected to arrive on Monday [4] October 2010. 

 

Labour relations with staff who have accepted the new contracts are good; some contractors however have not signed new contracts, and those who do not will not be retained when their current contracts expire in two months.

 

Expansion of the plant to 250 tons per day would require investment by MFP in expansion of the mill capacity and additional tanks, and could be put in place rapidly. Expansion to 400 tons per day would require plant investment of an estimated $620,000 and a new vertical shaft with an estimated cost of $500,000. Planning for expansion is under way.

 

Red Rock's consultant geologist in Colombia has established that the vein is thickening, with significantly higher grade, at the lowest levels of the mine now being developed, particularly at Level 6 south where the vein is over 1m thick. A tunnel is being driven from Level 0 to locate an expected second vein.

 

At the La Aurora/Machuca mine, buildings and sub-station are now in place, with a new winch, and the crushing plant has been delivered. Priority is being given to completing the works at El Limon.

 

Migori gold project: An initial report and analysis

 

Analysis of the VTEM and Magnetic/Radiometric airborne surveys continues, with a a final report expected in October 2010. Multiple targets have been identified.

 

Metallurgical testwork results on the Macalder tailings samples have been received from Amdel Laboratories, and are being analysed. An update with initial conclusions as to process route and timings will follow shortly.

 

Red Rock expects to finalise a drill programme during October 2010.

 

Jupiter Mines Ltd (ASX:JMS)(22.64% held declining to 5.23% on completion of Jupiter Mines Ltd's acquisition of the Tshipi manganese project): 

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31stb4lflbm99y.pdf .

 

Jupiter Mines Ltd continues to prioritise exploration of the Mt Ida magnetite project, where Red Rock has a 1.5% gross production royalty.

 

The transfer of the mining rights at the major Tshipi manganese project to Jupiter have been approved by the South African authorities.

 

Resource Star Ltd (ASX:RSL)(26.9% held):

 

The results for the year ended 30th June 2010 have today been announced, and are available at http://www.asx.com.au/asxpdf/20100930/pdf/31svmqfytd37j3.pdf .

 

Completion of the RC drill programme at the Machinga Rare Earth Project in Malawi, where the Company's farm-in partners Globe Metals and Mining Ltd are operators, was delayed due to the need to replace a rig during drilling. Results are now expected during October.

 

The helicopter magnetics/radiometrics over the Ilomba Hill uranium/niobium/rare earth prospect in Northern Malawi was completed, and announcement of results will be made shortly.

 

The drill programmes at Livingstonia in Malawi, to expand the Inferred uranium Resource, and in the Northern Territory of Australia, where multiple targets exist in the Edith River licenses, and some strong prospects are being tested, will commence during October.

 

Enquiries:

 

Regency Mines PLC Andrew Bell, Chairman 0207 402 4580

Sandra Spencer, Public and

Investor Relations 0207 402 4580

 

Nominated Adviser

Religare Capital Markets Peter Trevelyan-Clark/Ben Jeynes 020 7444 0800

 

Broker

Simple Investments Ltd Nick Emerson 01483 413500

 

 

 

 

Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFLVALIIVII
Date   Source Headline
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20222:06 pmRNSSecond Price Monitoring Extn
15th Feb 20222:01 pmRNSPrice Monitoring Extension
15th Feb 202212:52 pmRNSCopper and Cobalt Drilling in DRC
4th Feb 20227:00 amRNSAsset Review and Current Developments
28th Jan 20227:00 amRNSIssue of Equity, Exercise of Options, TVR
25th Jan 20227:00 amRNSOption Exercise, Directors' Dealings and TVR
19th Jan 20227:00 amRNSJudgement for Damages Obtained in DRC
7th Jan 20227:00 amRNSKenya Exploration Update
6th Jan 202211:26 amRNSLicences obtained at Bilbale and Boulon
6th Jan 20227:00 amRNSDRC Update
29th Dec 202112:21 pmRNSFinal Results
15th Dec 20217:00 amRNSDrilling starts in Victoria, Grant of New Licence
8th Dec 20217:00 amRNSKenya Exploration Update
7th Dec 202111:00 amRNSUpdate on Australian Joint Venture Subsidiary
16th Nov 20217:00 amRNSSummary of Gold Exposure
16th Nov 20217:00 amRNSDRC Projects Update
28th Oct 20219:54 amRNSHolding(s) in Company
28th Oct 20219:00 amRNSPrice Monitoring Extension
18th Oct 20219:44 amRNSLicence applications by Cote d'Ivoire subsidiary
11th Oct 20217:00 amRNSDRC Project - interim update
29th Sep 20217:00 amRNSInvestments Update
21st Sep 20214:11 pmRNSUpdate on Power Metal Resources and Australian JV
16th Sep 20213:40 pmRNSRRAL - historic mine workings, Victoria, Australia
16th Sep 202112:11 pmRNSPrice Monitoring Extension
16th Sep 202112:10 pmRNSSecond Price Monitoring Extn
16th Sep 20217:00 amRNSKenya Exploration Update
15th Sep 20214:41 pmRNSSecond Price Monitoring Extn
15th Sep 20214:36 pmRNSPrice Monitoring Extension
10th Sep 20211:45 pmRNSCompany Broker
27th Aug 20219:26 amRNSHolding(s) in Company
13th Aug 202111:05 amRNSSecond Price Monitoring Extn
13th Aug 202111:00 amRNSPrice Monitoring Extension
12th Aug 202110:52 amRNSDirector/PDMR Shareholding
10th Aug 20216:23 pmRNSKenya Exploration Update
9th Aug 202110:55 amRNSDRC Copper-Cobalt project - drilling update
9th Aug 20217:00 amRNSAustralian Gold Joint Venture update
26th Jul 20217:00 amRNSDirectorate Change
30th Jun 20215:47 pmRNSTotal Voting Rights
30th Jun 20219:34 amRNSDrilling contract awarded at Mikei Gold Project
29th Jun 20217:00 amRNSDrill Programme at DRC Copper-Cobalt Project
22nd Jun 20212:40 pmRNSHolding(s) in Company
10th Jun 20214:19 pmRNSHolding(s) in Company
4th Jun 20217:00 amRNSExercise of Warrants and Total Voting Rights
25th May 20217:00 amRNSDrill Programme to start at DRC Prospect
14th May 202111:55 amRNSInvestee update - Juno Minerals
10th May 20217:00 amRNSInvestee Entity Update - Elephant Oil Limited
30th Apr 20215:38 pmRNSTotal Voting Rights
29th Apr 20213:00 pmRNSUpdate: Australia

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.