Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSE.L Regulatory News (ROSE)

  • There is currently no data for ROSE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

update re Seismic Shoot in the Paradox Basin

31 Aug 2017 07:00

RNS Number : 3699P
Rose Petroleum PLC
31 August 2017
 

31 August 2017

 

Rose Petroleum plc

("Rose", the "Company" or the "Group")

 

Completion of Seismic Shoot Design Optimisation and Commencement of Field Work in the Paradox Basin

 

Rose (AIM: ROSE), the AIM quoted natural resources business, is delighted to announce that it has completed the optimisation of the 3D seismic shoot parameters on its oil and gas exploration acreage in the Paradox Basin, Utah (the "Paradox Acreage"). Surveying contractors have been engaged for the initial work programme on the 3D seismic survey and are expected to commence work within days.

As announced on 22 August 2017, the Company has assembled a highly experienced technical and operational team with specific Paradox Basin experience to assist in the completion of the seismic survey. The Company has been working on and now completed the optimisation for a state of the art 3D seismic shoot. The shoot has now been focused on an area of 40 square miles within the 61 square miles permitted area but retained the same coverage over the Rose acreage, cutting out extended areas of the shoot which were not covering Rose's acreage. It has been designed with high fold (greater than 35 fold with offsets up to 10,000-feet) wide-azimuth design which the Directors believe are better parameters than previous surveys in the area. The data will be suitable for azimuthal velocity (HTI) and amplitude versus offset (AVAZ) analyses for fracture characterisation, which, along with correlation to structural features, should allow the Company to predict areas of open natural fractures. It has been designed to tie in the State 16-42 (with modern logs) and the Federal 28-11 (Cane Creek producer) wells.

As previous stated, the Paradox Basin is a natural fracture driven basin, and drilling will target "fracture swarms" which allow commercial flow rates. Hydraulic fracturing is not usually required. The 3D seismic survey is an essential part of identifying these fracture swarms and is therefore an essential path to unlocking the value of the Paradox Acreage.

Dawson Geophysical Inc., who, as previously announced, is contracted to deliver the turn key Seismic shoot has been pre-paid for and instructed to commence the initial survey work segment which is expected to commence imminently.

The seismic shoot will be operated in three segments - surveying; drilling shot holes; and recording or acquiring the data. The survey work provides the foundational fabric of the shoot itself. The surveying lays out and physically marks on the ground four major elements of the shoot - all source points; all receiver points; all cultural sites for avoidance; and, all access corridors. There will be 4,798 total source points marked and numbered from which seismic signals will be generated with either seismic vibrators or shot holes. There will be a total of 6,880 receiver points that run at a 45 degree angle to the source points. There will be a number of survey crews laying out the source and receiver points. The survey crews will mark the access corridors that the vibrators will follow as they track across each square mile. 

Rose intends to commence the survey work within days and the total time it will take to lay out the entire 40 square mile area will be approximately six weeks. This will pave the way for the shot holes to be drilled and the acquisition crew will move in shortly thereafter.

Matthew Idiens, CEO, commented:

"I am delighted with the progress we have made on the optimisation of the designs and the potential savings created by the improvements. Reducing the shoot area to 40 square miles whilst retaining the same coverage of our acreage has enabled a significant reduction in costs without affecting the quality of the data. Surveying work is expected to commence within days which will keep us on track for completion of the shoot by year end.

"We look forward to keeping the market updated in respect of both the progress on the ground and in respect of our future funding options, which are still progressing and we are confident of a positive outcome, hence the commencement of the surveying work."

 

 

Enquiries:

 

Matthew Idiens (CEO)
Rose Petroleum plc
Tel: +44 (0) 20 7225 4595
Chris Eadie (CFO)
 

Tel: +44 (0) 20 7225 4599

Jeremy Porter / James Reeve / Liz
Allenby Capital Limited
Tel: +44 (0) 20 3328 5656
Kirchner
James Pope / Ben Turner
Turner Pope Investments
Tel: +44 (0)20 3621 4120

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCOKKDBBBKBDFN
Date   Source Headline
1st Jun 20107:00 amRNSAcquisition of Breccia Pipe Targets, US
26th May 20107:00 amRNSNI 43-101 Resource Report, Wate Uranium Pipe
26th Apr 20107:00 amRNSFinal Results
31st Mar 20107:00 amRNSUpdate on Copper Properties
1st Mar 20107:00 amRNSMaiden Resource Statement at Wate, Arizona
27th Jan 20107:00 amRNSAppointment of COO and 2010 Strategy
22nd Jan 20109:30 amRNSHolding(s) in Company
19th Jan 201012:01 pmRNSHolding(s) in Company
19th Jan 20107:00 amRNSAcquisition of New Uranium Property
14th Jan 20107:00 amRNSHolding(s) in Company
23rd Nov 20095:23 pmRNSHolding(s) in Company
18th Nov 20097:00 amRNSAdditional Uranium Drilling Intercepts, Arizona
11th Nov 20097:00 amRNSCopper-Gold Project, New Mexico
6th Nov 20096:12 pmRNSHolding(s) in Company
17th Sep 20097:00 amRNSAcquisition of New Uranium Package
9th Sep 20097:00 amRNSRenewal of Freeport Agreement
7th Sep 20097:00 amRNSHigh Grade Uranium Intercepts
3rd Sep 200911:22 amRNSHolding(s) in Company
1st Sep 200911:52 amRNSHolding(s) in Company
28th Aug 20097:00 amRNSHalf Yearly Report
22nd Jul 20094:39 pmRNSGrant of Options
20th Jul 20097:00 amRNSDirectorate Change
14th Jul 20097:00 amRNSChange of Adviser
25th Jun 20097:00 amRNSUranium Property Acquisition
5th Jun 200912:04 pmRNSHolding(s) in Company
5th Jun 200912:04 pmRNSHolding(s) in Company
14th May 200912:56 pmRNSResult of AGM
21st Apr 20097:00 amRNSAnnual Report and Financial Statements
9th Apr 20097:00 amRNSFinal Results
9th Mar 200911:07 amRNSHolding(s) in Company
26th Feb 20091:17 pmRNSResult of General Meeting
20th Feb 20097:00 amRNSHolding(s) in Company
6th Feb 20097:00 amRNSDirector/PDMR Shareholding
2nd Feb 20097:00 amRNSUranium Update
30th Jan 200912:32 pmRNSYuma King Agreement
26th Jan 20098:55 amRNSNotice of General Meeting
23rd Jan 20099:17 amRNSHolding(s) in Company
18th Dec 20083:17 pmRNSHolding(s) in Company
6th Nov 20087:00 amRNSUranium Update
24th Oct 20087:00 amRNSGrant of Options
17th Oct 20087:00 amRNSUpdate On Uranium Activities
14th Oct 20083:39 pmRNSHolding(s) in Company
22nd Sep 20087:00 amRNSHeads of Agreement
10th Sep 20087:00 amRNSInterim Results
9th Sep 20087:00 amRNSUranium One/VANE Minerals Joi
25th Jul 200810:07 amRNSHolding(s) in Company
15th Jul 20087:00 amRNSOperational Update
20th May 20082:29 pmRNSResult of AGM
14th May 20082:33 pmRNSHolding(s) in Company
21st Apr 20082:34 pmRNSAnnual Report and Accounts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.