The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRainbow Rare Earths Regulatory News (RBW)

Share Price Information for Rainbow Rare Earths (RBW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 11.40
Bid: 11.30
Ask: 11.50
Change: -0.25 (-2.15%)
Spread: 0.20 (1.77%)
Open: 11.65
High: 11.65
Low: 11.40
Prev. Close: 11.65
RBW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Estimate for Phalaborwa Project

17 Jun 2021 07:00

RNS Number : 1658C
Rainbow Rare Earths Limited
17 June 2021
 

Rainbow Rare Earths Limited

("Rainbow" or the "Company")

(LSE: RBW)

17 June 2021

 

MAIDEN JORC MINERAL RESOURCE ESTIMATE FOR PHALABORWA PROJECT

Rainbow Rare Earths Ltd is pleased to announce a maiden JORC (2012) compliant Mineral Resource Estimate in respect of the Phalaborwa Project in South Africa ("Phalaborwa" or the "Project").

· Inferred Mineral Resource Estimate of 38.3Mt at 0.43% TREO is larger than the original 35Mt expected from the gypsum stacks.

· High value Neodymium ("Nd") and Praseodymium ("Pr") oxide, the essential metals for permanent magnets powering the green revolution, represent 29.1% of the total contained rare earth oxides, with an in-situ value of US$95/t gypsum1.

· Economic Dysprosium ("Dy") and Terbium ("Tb") oxide credits, with an in-situ value of US$28/t gypsum1, enhance the overall value of the rare earth basket contained in the stacks, with the in-situ value of these four high value rare earth elements totalling US$123/t gypsum1.

· Very low levels of radioactive elements confirmed in the Inferred Mineral Resource Estimate confirm the 'green' credentials of this project.

1. Based on metal oxide prices published by Argus Media on 11th June 2021

George Bennett, CEO, said: "The Maiden Mineral Resource Estimate for Phalaborwa marks an important milestone for Rainbow, underpinning the opportunity for the rapid development of a low capital and operating cost, high value processing facility in South Africa to provide the essential metals to power the green revolution from an extremely environmentally beneficial project.

The fact that the rare earths are present in a chemical rather than mineral form in the gypsum stacks removes the need, as with the majority of global rare earth projects, to firstly produce a mineral concentrate before undertaking a complex and energy intensive 'cracking' process. The initial Phalaborwa process will deliver a high value cracked rare earth carbonate and studies are ongoing to investigate whether the valuable rare earth metals can be delivered as separated rare earth oxides for direct sale to industrial users. This gives us confidence that Phalaborwa will become the cornerstone of Rainbow's business in the near term.

Alongside the recently announced metallurgical test work results, which have confirmed that the gypsum stacks are amenable to simple, direct leaching with low-cost sulphuric acid at ambient temperature and pressure, the road map to commercialising the Phalaborwa deposit is now clear. We look forward to announcing further metallurgical test work results ahead of completing an initial scoping study/preliminary economic assessment in Q3 2021."

The Phalaborwa gypsum is contained in two separate gypsum stacks, labelled simply as Stack A and Stack B, for which Mineral Resources have been individually estimated as set out below:

Inferred Mineral Resource Estimate

 

 

Contribution of TREO by oxide

Grade

 

Tonnes

TREO

Nd

Pr

Dy

Tb

Other

Th

U

Mt

%

%

%

%

%

%

ppm

ppm

Stack A

27.4

0.42

23.3

5.7

1.0

0.4

69.6

49.0

1.8

Stack B

10.9

0.46

23.6

5.7

1.0

0.3

69.4

44.1

2.0

TOTAL

38.3

0.43

23.4

5.7

1.0

0.3

69.6

47.6

1.8

· All Estimated Mineral Resources are classified as Inferred

· The Inferred Mineral Resource Estimate is reported above a cut-off grade of 0.2% TREO.

· No constraining pit shell is required for the Inferred Mineral Resource Estimate due to the gypsum stacks being entirely above ground level.

· Mineral resources are not mineral reserves and do not have demonstrated economic viability.

Further metallurgical test work is ongoing with ANSTO Minerals in Australia to define a preliminary processing flow sheet to support a scoping study/preliminary economic assessment for the Phalaborwa project, which is expected to be completed in Q3 2021.

The maiden JORC Mineral Resource has been estimated based on the assay results received from 1,056.3m of auger drilling completed in December 2020. The auger drilling was independently assayed by SGS South Africa on the basis of 1.5m interval samples with appropriate duplicate, standards and blanks used for QAQC purposes. A further programme of sonic drilling was undertaken in April 2021 primarily to recover samples for bulk density estimation - the assay results from this drill programme were not available at the time of the initial resource estimation and will be used for a further resource update ahead of a formal feasibility study for Phalaborwa. Further drilling/assay samples will also be required to upgrade the mineral resources to the Measured and Indicated categories required for a formal feasibility study.

The surface topography of the gypsum stacks was calculated by use of a LIDAR survey. The Mineral Resource Estimate uses a 1.5t/m3 estimate for the bulk density of the gypsum stacks, being the average of the bulk density calculated for competent samples collected from the sonic drilling programme (1.66t/m3) and the bulk density calculated from more porous/weathered material near the surface of the stacks (1.33t/m3). Further work is planned to validate the overall bulk density of the stacks to upgrade the mineral resources to the Measured and Indicated categories required for a formal feasibility study.

Mineral resources were estimated using a block model with a panel size of 50 x 50 x 3m with block volume resolution down to 5 x 5 x 0.5m. Grades, including rare earth oxides, thorium and uranium, were estimated by ordinary kriging.

Competent Persons Statement

The Mineral Resource Statement presented herein has been compiled and classified by Malcolm Titley, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Titley is employed by Maja Mining Limited, an independent consulting company. Mr Titley has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Titley is responsible for the preparation of the Mineral Resource Estimate and takes overall responsibility for the resource estimation work and resulting Mineral Resource Statement and consents to the inclusion in this announcement of the matters based on their information in the form and context in which it appears.

Appendix

"Indicated Mineral Resource" is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a probable mineral reserve.

"Inferred Mineral Resource" is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a mineral reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. An Inferred Mineral Resource is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

"JORC Code" means the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia. The JORC Code is an acceptable foreign code for purposes of NI 43-101.

"Mt" means million tonnes

"Dy" means Dysprosium

"TREO" means Total Rare Earth Oxides

"TB" means Terbium

"Nd" means Neodymium

"Pr" means Praseodymium

Market Abuse Regulation ("MAR") Disclosure

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

**ENDS**

For further information, please contact

Rainbow Rare Earths Ltd

Company

George Bennett

Pete Gardner

+27 82 652 8526

 

SP Angel Corporate Finance LLP

Broker

Ewan Leggat

Charlie Bouverat

+44 (0) 20 3470 0470

Flagstaff Strategic and Investor Communications

Tim Thompson

Fergus Mellon

+44 (0) 207 129 1474

rainbowrareearths@flagstaffcomms.com

 

Notes to Editors:

Rainbow's strategy is to become a globally-significant producer of rare earth metals. NdPr are vital components of the strongest permanent magnets used for the motors and turbines driving the green technology revolution. Analysts are predicting demand for magnet rare earth oxides will grow substantially over the coming years, driven by increasing adoption of green technology, pushing the overall market for NdPr into deficit.

The Phalaborwa Rare Earths Project, located in South Africa, comprises an Inferred Mineral Resource Estimate of 38.3Mt at 0.43% TREO contained within gypsum tailings stacked in unconsolidated dumps derived from historic phosphate hard rock mining. High value NdPr oxide represent 29.1% of the total contained rare earth oxides, with economic Dysprosium and Terbium oxide credits enhancing the overall value of the rare earth basket contained in the stacks. The rare earths are contained in chemical form in the gypsum dumps, which is expected to deliver a higher-value rare earth carbonate, with lower operating costs than a typical rare earth mineral project.

The Company's Gakara Project in Burundi, which produces one of the highest-grade concentrates in the world (typically 54% total rare earths oxides ("TREO")) through ongoing trial mining operations, is currently the only African producer of rare earths. The Gakara basket is weighted heavily towards NdPr, which account for over approximately 19.5% of the contained TREO and 85% of the value of the concentrate.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCEAPKKFLSFEFA
Date   Source Headline
18th Apr 20243:50 pmRNSDirector/PDMR Shareholding
16th Apr 20247:00 amRNSPositive Initial Leaching and Mineralogy Results
28th Mar 20247:00 amRNSInterim Results
20th Mar 202411:37 amRNSPublication of Conference Presentation
26th Feb 20247:00 amRNSResource Update
5th Feb 20247:00 amRNSUpdate on Rare Earth Oxide Separation Progress
31st Jan 20247:00 amRNSPublication of Site Visit Presentation
18th Jan 20247:24 amRNSUS Congressional Delegation hosted at Phalaborwa
16th Jan 20247:00 amRNSAppointment of Stifel as Joint Broker
11th Jan 20247:00 amRNSRare Earth Oxide separation commences in the U.S.
6th Dec 20237:00 amRNSConditional shares issue & share options exercise
5th Dec 20237:00 amRNSDFC to fund proposed $50M TechMet investment
1st Dec 20237:00 amRNSRBW's partner K-Tech presents at Congress hearing
21st Nov 20237:00 amRNSResults of Annual General Meeting
8th Nov 20237:00 amRNSTechMet option to invest US$50m in Phalaborwa
31st Oct 20239:23 amRNSPublication of Annual Report and Notice of AGM
30th Oct 20237:00 amRNSPreliminary results for the year-end 30 June 2023
5th Oct 20237:00 amRNSAdmission of First Tranche of Placing Shares
4th Oct 202312:19 pmRNSPrivate Placement Update
4th Oct 20237:00 amRNSLOI for offtake of Phalaborwa gypsum by-product
27th Sep 20237:00 amRNSPrivate Placement Raises £4.5 Million
11th Sep 20237:00 amRNSSupply Agreement with UK-based Less Common Metals
7th Sep 20237:00 amRNSInitial Results from Uberaba confirm Rare Earths
5th Sep 20237:00 amRNSProduction of Mixed Rare Earth Sulphate
29th Aug 20237:00 amRNSDirector/PDMR Shareholding
8th Aug 20237:00 amRNSAJ Bell ‘Live’ Investor Evening 13 September 2023
18th Jul 20237:00 amRNSInvestor Presentation
17th Jul 20237:00 amRNSMOU signed with The Mosaic Company in Brazil
28th Jun 20237:00 amRNSAgreement to Allow 100% Ownership of Phalaborwa
12th Jun 20237:00 amRNSAppointment of Non-Executive Director
6th Jun 20234:03 pmRNSGrant of Share Options
6th Jun 20237:00 amRNSPhalaborwa Pilot Plant Commences Operations
26th May 20231:15 pmRNSDirector/PDMR Shareholding
24th May 20239:53 amRNSHolding(s) in Company
22nd May 20232:12 pmRNSGrant of Share Options
22nd May 20237:00 amRNSHolding(s) in Company
18th May 20235:00 pmRNSHolding(s) in Company
9th May 20237:00 amRNSPrivate placement raises £7.52 million
6th Apr 202312:00 pmRNSHolding(s) in Company
31st Mar 20231:52 pmRNSHolding(s) in Company
31st Mar 20237:00 amRNSInterim Results for six months to 31 December 2022
30th Mar 20237:00 amRNSHolding(s) in Company
20th Mar 20237:00 amRNSPhalaborwa Development and Resource Update
10th Feb 20237:25 amRNSDirector/PDMR Shareholding
10th Jan 20237:00 amRNSInvestor Presentation
15th Dec 20229:44 amRNSDirector/PDMR Shareholding - Replacement
15th Dec 20227:00 amRNSDirector/PDMR Shareholding
23rd Nov 20227:00 amRNSResults of Annual General Meeting
18th Nov 20229:30 amRNSShares/AJ Bell LIVE Investor Evening
10th Nov 20227:00 amRNSExercise of Share Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.