Less Ads, More Data, More Tools Register for FREE

Pin to quick picksReabold Resources Regulatory News (RBD)

Share Price Information for Reabold Resources (RBD)

Share Price is delayed by 15 minutes
Get Live Data
84.00    0.00 (0.00%)
Bid:
83.00
Ask:
85.00
Spread: 2.00 (2.41%)
Market Cap: £12.18m
RBD Live PriceLast checked at - London Stock Exchange

Intraday Reabold Resources Share Chart

Operational Update

29 Jul 2019 07:00

RNS Number : 9461G
Reabold Resources PLC
29 July 2019
 

29 July 2019

 

Reabold Resources Plc

 

("Reabold" or the "Company")

 

Operational Update

 

 

Reabold, the AIM investing company which focusses on investments in pre-cash flow upstream oil and gas projects, is pleased to provide the following update across its portfolio:

 

Highlights:

 

·; Rig mobilisation and drilling for Parta well expected to begin imminently

·; Both VG-4 and VG-3 now in permanent production

·; Permits secured for up to three additional wells at West Brentwood

·; Rig site survey commenced for Curlew-A

 

 

Danube Petroleum

 

As announced on 30 May 2019, activities have commenced for drilling the Iecea Mare 1 ("IM-1") well. Since then, the access road construction has been completed and the drill pad site works have commenced with completion planned to be concurrent with the rig mobilisation. Additionally, all major equipment items have been delivered. The well conductor pipe has been pre-installed in preparation for drilling. Rig mobilisation is expected to commence imminently, with well spud approximately 8 days later following the completion of rig assembly, testing and commissioning.

 

 

California

 

West Brentwood

 

At West Brentwood, the VG-4 well was put onto permanent production on 26 July 2019, following a successful 'hot tap' to tie into an existing gas pipeline in the vicinity of the field. As announced on 28 January 2019, initial production testing at VG-4 saw the well produce at a choked level of 480 bopd and 742 thousand cubic feet per day of gas. Both the VG-3 and VG-4 wells at West Brentwood are now in production.

 

Permits for up to three additional wells at West Brentwood have now been secured. Given the success and prolific production rates seen at West Brentwood, Reabold, along with JV partner Sunset Exploration and contract operator Integrity Management Solutions, ("IMS"), is considering whether the next well at West Brentwood should be accelerated within the California drilling schedule.

 

Monroe Swell

 

As announced on 11 March 2019 and on 1 April 2019, IMS, contractor operator of the Monroe Swell field in which Reabold has earned a 50 per cent. interest, informed the Company of successful drilling results and oil discoveries at the Burnett 2A and 2B wells ("the wells") in California. The wells encountered over 60 and 90 metres of logged pay respectively, ahead of pre-drill expectations, and were subsequently tested by perforating an initial 53.6 metres and 34.8 metres. The wells produced oil before being placed onto permanent production.

 

Since the confirmation of commercial flow rates and being placed on production, the wells are yet to achieve stabilised production rates in line with testing, meaning IMS plans to re-enter and clean out the perforated zones in order to restore production to the rates previously indicated by the test. The Company is also reviewing potential additional intervals for test, which were logged as pay but have not yet been perforated.

 

 

UK Offshore

 

Reabold is pleased to report that the rig site survey for the Curlew-A prospect on licence P 2396 offshore UK has commenced, with the survey expected to be completed by the end of this week. Reabold has an effective 29.6 per cent interest in the licence via its 32.9 per cent. equity interest in Corallian Energy, operator of the licence. Curlew-A has a best estimate 2C contingent resource of 38.8 mmboe based on a CPR completed by Schlumberger Oilfield UK.

 

 

Sachin Oza, Co-CEO of Reabold, commented:

"We are very pleased with the progress being made across the Reabold portfolio. In particular, the increased cash flow generated from California is highly complementary to the larger scale assets in the UK and Romania.

 

We look forward to results from both the West Newton test programme and the IM-1 well in Romania during Q3, both of which have the potential to deliver material returns in a success case."

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

ENDS

 

For further information please contact:

 

Reabold Resources plc

Stephen Williams

Sachin Oza

c/o Camarco

+44 (0) 20 3757 4980

 

Strand Hanson Limited (Nominated and Financial Adviser)

Rory Murphy

James Spinney

James Dance

 

+44 (0)20 7409 3494

 

 

 

Camarco

James Crothers

Ollie Head

Billy Clegg

 

+44 (0) 20 3757 4980

Whitman Howard Limited - Joint Broker

Nick Lovering

Grant Barker

 

+44 (0) 20 7659 1234 

Turner Pope Investments (TPI) Ltd - Joint Broker

Andy Thacker

+44 (0) 20 3621 4120

 

 

Notes to Editors

Reabold Resources plc is an investing company investing in the exploration and production ("E&P") sector. The Company's investing policy is to acquire direct and indirect interests in exploration and producing projects and assets in the natural resources sector, and consideration is currently given to investment opportunities anywhere in the world. 

 

As an investor in upstream oil & gas projects, Reabold aims to create value from each project by investing in undervalued, low-risk, near-term upstream oil & gas projects and by identifying a clear exit plan prior to investment.

 

Reabold's long term strategy is to re-invest capital made through its investments into larger projects in order to grow the Company. Reabold aims to gain exposure to assets with limited downside and high potential upside, capitalising on the value created between the entry stage and exit point of its projects. The Company invests in projects that have limited correlation to the oil price.

 

Reabold has a highly-experienced management team, who possess the necessary background, knowledge and contacts to carry out the Company's strategy.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDVVLFLKDFEBBZ
Date   Source Headline
26th May 20207:00 amRNSAcquisition of Further 16.665% in West Newton
12th May 20204:09 pmRNSHolding(s) in Company
4th May 20207:00 amRNSPositive Decision for EWT at West Newton
29th Apr 20202:40 pmRNSHolding(s) in Company
27th Apr 20207:00 amRNSPositive Decision for EWT at West Newton
17th Apr 20208:18 amRNSHolding(s) in Company
16th Apr 20207:00 amRNSRomania Update
15th Apr 20207:00 amRNSCommencement of Activity at West Newton B Site
13th Mar 20207:00 amRNSUpdate on Market Volatility
26th Feb 20207:00 amRNSUpdate on California Operations
20th Feb 20207:00 amRNSUpdate on West Newton Activity Programme
20th Feb 20207:00 amRNSUpdate on West Newton Activity Programme
4th Feb 20204:28 pmRNSHolding(s) in Company
6th Jan 20207:00 amRNSReabold California - VG-6 Update
23rd Dec 20197:00 amRNSRomania Update
18th Dec 20197:00 amRNSWest Newton Project Update
10th Dec 20197:00 amRNSDrilling Operations Commence at VG-6
2nd Dec 20197:00 amRNSExercise of Danube Options
27th Nov 20191:36 pmRNSHolding(s) in Company
22nd Nov 20197:00 amRNSHolding(s) in Company
22nd Nov 20197:00 amRNSSubscription for new shares in Danube Petroleum
22nd Nov 20197:00 amRNSParticipation in Corallian Fundraise
18th Nov 20195:13 pmRNSDirectors' Dealings
11th Nov 20194:47 pmRNSHolding(s) in Company
11th Nov 20197:00 amRNSUpgraded Potential Volumes - West Newton
6th Nov 201910:00 amRNSUpdate on West Newton
5th Nov 20197:00 amRNSCompletion of Rathlin Cash Investment
1st Nov 20197:00 amRNSAppointment of Joint Broker
31st Oct 20195:14 pmRNSHolding(s) in Company
30th Oct 20197:00 amRNSHolding(s) in Company
28th Oct 20192:00 pmRNSResults of General Meeting
28th Oct 20197:00 amRNSUpdate on Proposed Equity Swap and Placing
22nd Oct 20193:16 pmRNSNotification of major holdings
22nd Oct 20193:15 pmRNSNotification of major holdings
10th Oct 20192:45 pmRNSPosting of Circular and Notice of General Meeting
9th Oct 20197:00 amRNSResults of Placing
8th Oct 20194:45 pmRNSProposed Placing to Raise £24 million
7th Oct 20193:45 pmRNSStatement re: Proposed Placing & Investments
4th Oct 201910:04 amRNSStatement re Potential Fundraising
2nd Oct 20197:00 amRNSCompletion of Increased Investment into Danube
27th Sep 201911:00 amRNSUnaudited Interim Results
26th Sep 20197:00 amRNSWest Brentwood Reserves Update
23rd Sep 20197:00 amRNSReabold California Operational Update
16th Sep 20198:56 amRNSIncreased Investment into Danube Petroleum
9th Sep 20197:00 amRNSSuccessful Appraisal Well at Parta Licence Romania
29th Aug 20197:00 amRNSOperational Update at West Newton, onshore UK
27th Aug 201911:15 amRNSCapital Reduction Update
27th Aug 20197:00 amRNSRomania Operational Update
22nd Aug 20197:00 amRNSIncreased Investment in Rathlin Energy
12th Aug 201910:04 amRNSOperational Update at West Newton, onshore UK

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.