Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPhoenix Copper. Regulatory News (PXC)

Share Price Information for Phoenix Copper. (PXC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 17.50
Bid: 17.00
Ask: 18.00
Change: 2.625 (17.65%)
Spread: 1.00 (5.882%)
Open: 14.875
High: 18.00
Low: 14.875
Prev. Close: 14.875
PXC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Additional Results of Metallurgical Core Drilling

4 Jan 2023 07:00

RNS Number : 5694L
Phoenix Copper Limited
04 January 2023
 

Phoenix Copper Limited / Ticker: PXC / Sector: Mining

4 January 2023

Phoenix Copper Limited

('Phoenix' or the 'Company')

 

Additional Results of Metallurgical Core Drilling at the Empire Open Pit Copper Project, Idaho 

 

Phoenix Copper Ltd (AIM: PXC, OTCQX: PXCLY), the AIM-quoted USA focused base and precious metals emerging producer and exploration company is pleased to report the assay results from a further two metallurgical core holes at its Empire Open Pit Copper Project, in Custer County, Idaho, USA (the 'Empire Open Pit'). 1,077 metres ('m') of a planned 1,500 m metallurgical core drilling programme were completed during 2022 and will provide samples and technical information for further metallurgical testing, geotechnical studies, and geological modeling.

Significant drill results from the fourth and fifth holes of the programme are listed in Table 1, including the following highlights:

Hole KXD22-04

· 11.00 m of 1.59% copper, 45.60 grammes / tonne ('g/t') silver, and 0.37% zinc starting at the surface

Including 5.20 m of 2.00% copper and 56.30 g/t silver from the surface

And including 1.20 m of 5.19% copper, 149.00 g/t silver, and 1.61% zinc from 9.80 m

· And 0.60 m of 2.55% copper and 58.80 g/t silver from 12.80 m

· And 2.70 m of 0.597 g/t gold and 13.60 g/t silver from 80.30 m

Hole KXD22-05

· 17.70 m of 0.59% copper, 20.10 g/t silver, and 0.39% zinc starting at a depth of 22.60 m

Including 1.20 m of 7.43 g/t gold and 10.50 g/t silver from 29.30 m

And including 3.40 m of 1.98% copper, 0.32 g/t gold, 60.30 g/t silver, and 0.90% zinc from 35.40 m

The 2022 metallurgical exploration programme was designed to collect material from each of the metallurgical domains, to evaluate the metallurgical variability within the Empire Open Pit, while improving the understanding of the geologic and structural controls on mineralisation. The results continue to confirm the continuity of mineralisation, which appears along structures striking northeast and dipping steeply to the southeast. The Phoenix team is assessing these results for inclusion in updated geological models and to target additional drilling programmes.

Ryan McDermott, Chief Executive Officer, said, "We are pleased to announce the assays from the fourth and fifth metallurgical core holes drilled in 2022. Holes KXD22-04 and KXD22-05 represent 551.5 feet (168.1 metres) of the nine-hole drilling program. Drilling commenced in early June and assay certificates for holes four and five were received in late December. The Phoenix team targeted specific zones within the Empire resource in order to collect samples that are representative of the geology and grade characteristics of the deposit as a whole. The samples will be used in the additional testing of ammonium thiosulfate as a recovery agent for copper, gold, and silver, which may enable us to bring forward production of gold and silver, currently scheduled as a second phase of the Empire Open Pit project.  

"Consistent with the copper, gold, and silver values previously reported for holes KXD22-01 through KXD22-03, holes KXD22-04 and KXD22-05 show equally robust values including 11 metres grading 1.59% copper and 45.60 g/t silver in KXD22-04 and 17.70 metres of 0.59% copper and 20.10 g/t silver, including 1.20 metres of 7.43 g/t gold. Most importantly, the intercepts in the first five holes of the program meet the ore type-grade-interval length necessary for the metallurgical test work currently being undertaken. 

"The metallurgical testing program is progressing as planned; however, assay results are taking longer than originally anticipated due to laboratory backlog.

"We look forward to reporting additional assays from this year's drilling as they become available and appreciate everyone's patience while the assay laboratory clears the sample backlog."

 

Table 1 - Empire Drilling Results December 23, 2022

Drill Hole

Intersection Metres

g/tonnes

%

%

%

ppm

ppm

Number

From

To

Interval

Au

Ag

Cu

Pb

Zn

Mo

W

KXD22-04

0

11.0

11.0

0.072

45.6

1.59

0.03

0.37

31.4

168.9

including

0

5.2

5.2

0.114

56.3

2.00

0.01

0.08

10.6

157.7

including

9.8

11

1.2

0.090

149.0

5.19

0.17

1.61

126.0

110.0

and

12.8

13.4

0.6

0.050

58.8

2.55

0.01

0.08

27.0

60.0

and

31.2

34.7

3.5

0.094

13.6

0.84

0.01

0.11

58.7

40.9

and

46.6

52.7

6.1

0.028

0.6

0.00

0.00

0.01

435.6

11.5

and

80.3

83.1

2.7

0.597

13.6

0.17

0.04

0.32

230.4

120.6

and

90.8

92.4

1.5

0.110

15.5

0.08

0.01

0.04

337.0

90.0

and

107.4

109.9

2.4

0.020

38.4

0.03

0.01

0.02

63.0

420.0

KXD22-05

22.6

40.2

17.7

0.645

20.1

0.59

0.05

0.39

54.9

47.1

including

23.9

25.3

1.4

0.140

40.1

0.64

0.01

0.38

157.0

110.0

including

29.3

30.5

1.2

7.430

10.5

0.14

0.00

0.24

9.0

10.0

including

35.4

38.7

3.4

0.320

60.3

1.98

0.24

0.90

160.0

100.0

and

49.4

57.0

7.6

0.110

4.4

0.16

0.05

0.38

26.0

32.4

including

49.4

50.4

1.1

0.140

19.4

0.67

0.31

1.53

31.0

110.0

 

* Length along hole (not equivalent to true width).

 

 

Assay Quality Control

All PQ and HQ drill core is logged by Konnex personnel at Phoenix's drill core facility located in Mackay, Idaho, USA. The drill core is then cut in half. One half is sent to a commercial laboratory for assaying, and the other half is kept for future reference. A strict QA/QC programme is in place by integrating duplicates, blanks, and certified reference standards into the core sample sequence.

Qualified Person

The foregoing technical information in this news release has been reviewed and verified by Zachary J. Black, SME-RM, General Manager. Mr. Black is a resource geologist with more than 17 years of domestic and international experience in the mining and construction industries. Mr. Black has a degree in Geological Engineering from the University of Nevada, Reno and is a registered member of the Society for Mining, Metallurgy, and Exploration, Inc. He is a Qualified Person under the AIM Rules. Mr. Black consents to the inclusion of the information in the form and context in which they appear.

Environmental, Social, and Corporate Governance

Phoenix is committed to meeting and exceeding the environmental standards required by law as a core value of the Company. The baseline environmental data collected to date will be used for furthering the permitting process, but as importantly, will be used as the building blocks for the Company's ongoing Environmental, Social, and Corporate Governance (ESG) platform, overseen by the Company's ESG & Sustainability Committee.

Market Abuse Regulation (MAR) Disclosure

The Company deems the information contained within this announcement to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014, which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via the Regulatory Information Service, this inside information is now considered to be in the public domain.

Contacts

For further information please visit https://phoenixcopperlimited.com or contact:

Phoenix Copper Limited

Ryan McDermott

Brittany Lock

Richard Wilkins

Tel: +1 208 954 7039 

Tel: +1 208 794 8033

Tel: +44 7590 216 657 

SP Angel (Nominated Adviser)

David Hignell / Kasia Brzozowska

Tel: +44 20 3470 0470

Tavira Financial Limited (Joint Broker)

Jonathan Evans / Oliver Stansfield

 

Tel: +44 20 7100 5100

WH Ireland (Joint Broker)

Harry Ansell / Katy Mitchell

Tel: +44 20 7220 1666

Panmure Gordon (UK) Limited (Joint Broker)

John Prior / Hugh Rich / Ailsa Macmaster

Tel: +44 20 7886 2500

EAS Advisors (US Corporate Adviser)

Matt Bonner / Rogier de la Rambelje

Tel: +1 (646) 495-2225

BlytheRay(Financial PR)

Tim Blythe / Megan Ray

Tel: +44 20 7138 3204

Notes

Phoenix Copper Limited is a USA focused, base and precious metals emerging producer and exploration company, initially targeting copper and zinc production from an open pit mine.

Phoenix's primary operations are focused near Mackay, Idaho in the Alder Creek mining district, at the 80% owned Empire Mine property, which historically produced copper at grades of up to 8%, as well as gold, silver, zinc and tungsten, from an underground mine.

Since 2017, Phoenix has carried out extensive drill programs which have defined a NI 43-101 compliant PEA (preliminary economic assessment) for an open pit heap leach solvent extraction and electrowinning ("SX-EW") mine, which was updated in October 2020. The contained metal in all NI 43-101 compliant categories of resources, Measured, Indicated and Inferred, stand at 129,641 tonnes of copper, 355,523 ounces of gold, 10,133,772 ounces of silver and 58,440 tonnes of zinc. Phoenix updated its economic model in February 2021 to include the processing of all contained metals through a two phased approach.

In addition to Empire, the district includes the historic Horseshoe, White Knob and Blue Bird Mines, past producers of copper, gold, silver, zinc, lead and tungsten from underground mines. A new discovery at Red Star, 330 metres northwest of the Empire Mine proposed open pit, has revealed high grade silver / lead sulphide ore, and from three shallow exploration drill holes a maiden inferred resource of 103,000 tonnes containing 173.4 g/tonne silver, 0.85 g/tonne gold and 3.85% lead (1.6 million ounces silver equivalent) was reported in an NI 43-101 technical report published in May 2019. Additionally, the district includes Navarre Creek, a volcanic hosted precious metals target in a 14.48 sq km area. The Company's total land package at Empire comprises 8,034 acres (32.51 sq kms).

At Empire, it is estimated that less than 1% of the potential ore system has been explored to date and, accordingly, there is significant opportunity to increase the resource through phased exploration. The stated aim of the Company is to fund this phased exploration through free cashflow generated by its initial mine. A Plan of Operations in respect of the initial open pit mine was filed with the relevant regulatory authorities in June 2021.

Phoenix also has two wholly owned cobalt properties on the Idaho Cobalt Belt to the north of Empire. An Earn-In Agreement has been signed with Electra Battery Materials (formerly First Cobalt Corporation), Toronto, in respect of one of those properties.

Phoenix is listed on London's AIM (PXC), and trades on New York's OTCQX Market (PXCLF and PXCLY (ADRs)). More details on the Company, its assets and its objectives can be found on PXC's website at https://phoenixcopperlimited.com/

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLMZGGMNFRGFZM
Date   Source Headline
8th Apr 202412:25 pmRNSBlock Listing Six Monthly Return
27th Mar 20247:00 amRNSExtension of Warrants
19th Mar 20247:00 amRNSPurchase of Empire Processing Equipment Finalised
4th Mar 20247:00 amRNSRefinancing of Short-Term Loan Facility
19th Feb 20247:00 amRNSUpdate: Purchase of Equipment and Debt Refinancing
31st Jan 20246:15 pmRNSResult of Retail Offer and Additional Subscription
26th Jan 202412:10 pmRNSResult of Placing and Subscription
26th Jan 20249:25 amRNSClose of Accelerated Bookbuild
26th Jan 20247:01 amRNSRetail Offer
26th Jan 20247:00 amRNSProposed Placing, Subscription and Retail Offer
18th Jan 20247:00 amRNSOperational Update
5th Jan 20247:00 amRNSCorporate copper bonds and loan facility update
11th Dec 20237:00 amRNSExtension of Loan Facility
20th Nov 20237:00 amRNSExtension of Loan Facility
24th Oct 20237:00 amRNSUpdate for Navarre Creek Exploratory Drilling
10th Oct 20235:02 pmRNSBlock Listing Six Monthly Return
28th Sep 20237:00 amRNSInterim Results
4th Sep 20237:00 amRNSResults of Metallurgical Testing at Empire Mine
17th Jul 20237:00 amRNSCommencement of Navarre Creek Drilling Programme
23rd Jun 20237:00 amRNSExtension of Loan Facility
8th Jun 202312:33 pmRNSResult of Annual General Meeting
6th Jun 20237:00 amRNSPreliminary Results of Metallurgical Testing
25th May 20237:00 amRNSFinal results for the year ended 31 December 2022
12th Apr 20237:00 amRNSExploration Drilling Results at the Empire Mine
6th Apr 20237:00 amRNSBlock Listing Six Monthly Return
29th Mar 20239:05 amRNSSecond Price Monitoring Extn
29th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20239:05 amRNSSecond Price Monitoring Extn
24th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSCorporate Update
16th Mar 20237:00 amRNSFurther Results of Metallurgical Core Drilling
12th Jan 20237:00 amRNSFurther Results of Metallurgical Core Drilling
5th Jan 20237:00 amRNSPhoenix Subsidiary Welcomes New General Manager
4th Jan 20237:00 amRNSAdditional Results of Metallurgical Core Drilling
9th Dec 202211:00 amRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSInitial Results of Metallurgical Core Drilling
6th Oct 20227:00 amRNSBlock Listing Six Monthly Return
29th Sep 202211:05 amRNSSecond Price Monitoring Extn
29th Sep 202211:00 amRNSPrice Monitoring Extension
29th Sep 20227:00 amRNSInterim Results
23rd Sep 20229:06 amRNSSecond Price Monitoring Extn
23rd Sep 20229:00 amRNSPrice Monitoring Extension
20th Sep 20221:47 pmRNSTR-1: Notification of major holdings
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20222:05 pmRNSSecond Price Monitoring Extn
13th Sep 20222:00 pmRNSPrice Monitoring Extension
8th Sep 20227:00 amRNSOperational & Financing Update
12th Jul 20227:00 amRNS2022 Drilling Programme Underway at Empire
5th Jul 20224:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.