Operational update

6 May 2011 07:00

RNS Number : 0529G
Paragon Diamonds Limited
06 May 2011
 



 

Paragon Diamonds Limited

("Paragon" or the "Company")

(AIM: PRG)

 

Paragon Diamonds, the AIM quoted, African focused diamond production and development company, today announces an operational update relating to its operations in Lesotho and Zambia.

 

Highlights

·; Lemphane (Lesotho)

o Work underway for commencement of initial +5,000t bulk sampling at Lemphane followed by further +5,000t and +10-15,000t respectively to determine likely grade/valuation and distribution

o 15tph Mobile DMS plant acquired by Paragon in November 2010 being shipped to Lesotho to commence bulk sampling processing and subsequent trial mining

·; Kaplamp (Zambia)

o Remote sensing to be undertaken immediately with ground magnetic surveys to follow

o Mini-bulk sampling to commence in Q3 to determine grade/valuation

o Pre-wash and pan plant already acquired by Paragon awaiting shipment to Zambia

 

 

Following the recent announcement, on 21 April 2011, of the conditional acquisition of a further 54.2% of International Diamond Consultants ("IDC") the Directors of Paragon, in consultation with the existing IDC employees and consultants, have undertaken a review of the operational strategy at both the Lamphane and Kaplamp diamond projects, the results of which are set out below.

 

Lemphane (Lesotho)

 

A detailed work programme and costing, plus operational procedures for bulk sampling is being prepared. This will be completed by the end of May 2011. Permits will be applied for from the government of Lesotho prior to commencement of the sampling and processing but these are expected to be in place before the end of June 2011.

 

Once the permits are obtained, work will commence immediately on a bulk sample programme of +5,000t within the Kimberlite in order to gain a better understanding as to the likely grade and value of diamonds contained within the pipe. Following this initial extraction there will be a continuous follow up sampling programme of a further +5,000t and then a subsequent +10-15,000t of ongoing material.

 

Stripping of overburden, mapping of trenches, and preparing the sample for extraction will commence as soon as permits have been obtained. A mobile crusher will be used to crush and stockpile the sample awaiting processing by the plant which is expected to arrive on site by the beginning of Q3 2011.

 

Bulk Sampling Plant

Work has already commenced on shipping the recently acquired 40 tph pre-treatment and 15 tph modular DMS diamond recovery plant (as announced on 29 November 2010) to Lesotho where it will be re-assembled and used to process stockpiles of crushed ore.

 

In addition to the sampling activities, work will also be undertaken over the coming months on the construction of slimes and water dams and pump accumulation of process water and other necessary infrastructure works as required.

 

The initial results from the bulk sampling programme are expected in Q3 2011 at which stage indicative metallurgical parameters as well as grade, valuation and distributions within the pipe can be estimated. At this stage a further review of the strategy will be undertaken and if appropriate, trial mining will be commenced.

 

Zambia - Kaplamp Project

 

The Kaplamp project consists of a province of at least 12 lamproite intrusions and dykes, up to 45 hectares in size, of which at least seven are reported to be diamondiferous. The province has been compared to the Ellendale lamproite province in Western Australia, in terms of its size, geological setting and number and distribution of lamproite bodies. The Ellendale province hosts a number of economic diamond occurrences, two of which are presently being mined.

 

Applications have been started to gain permission to commence exploration in the KapLamp licence with remote sensing and interpretation of satellite imagery to commence shortly. In early Q3 2011, it is expected that a ground magnetic survey will be undertaken followed by drainage sampling of the five principle targets. The samples will then be sent to South Africa for processing.

 

Following the initial samples, mini-bulk sampling will be undertaken on the identified targets using a pre-wash pan plant that has already been acquired by Paragon and is currently in storage in South Africa awaiting shipment to Zambia. The intention is continue with the bulk sampling and if appropriate trial mining for the duration of Q3 2011 up to the commencement of the rainy season in November 2011.

 

Commenting today, Stephen Grimmer Chief Executive Officer said: "Our agreement to significantly increase our stake in IDC is transformational for Paragon. I am very optimistic about the opportunities that Lemphane and Kaplamp present for the Company and believe that the initial work we have proposed should deliver meaningful results by Q3 2011 in order to progress these two projects in an efficient manner."

 

In accordance with the AIM Rules, the information in this announcement has been reviewed by Stephen Grimmer PhD, a qualified geologist with over 20 years' diamond exploration experience.

 

Paragon Diamonds Limited

Frank Scolaro - Chairman

Stephen Grimmer - Chief Executive Officer

Simon Retter - Finance Director

www.paragondiamonds.co

+44 (0) 20 7099 1940

 

ZAI Corporate Finance Ltd

+44 (0) 20 7060 2220

Richard Morrison

Sarang Shah

 

Fox-Davies Capital Ltd

Simon Leathers

Jonathan Evans

 

+44 (0) 20 3463 5010

 

 

Threadneedle Communications

Laurence Read

Beth Harris

 

+44(0) 20 7653 9855

Definitions

 

t "tonnes"

tph "tonnes per hour"

DMS "Dense Media Separation"

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRUGUCUAUPGGQA
Date   Source Headline
25th Mar 20138:00 amRNSDirectorate Change
6th Mar 20137:00 amRNSLemphane, Operational update
31st Jan 20137:40 amRNSLemphane operational update
14th Jan 20137:00 amRNSScoping study and drilling contracts
8th Jan 20137:00 amRNSMemorandum of Understanding
19th Dec 20128:46 amRNSDirectorate Change
3rd Dec 201212:36 pmRNSOperational Update
25th Sep 20127:00 amRNSDirectorate Change
19th Sep 20127:00 amRNSHalf Yearly Report
4th Sep 20127:00 amRNSOperational Update - Motete Dyke
28th Aug 20127:00 amRNSMotete update
24th Jul 20127:00 amRNSFurther Bulk Sample Results, Motete Dyke project
9th Jul 201212:11 pmRNSResult of AGM
4th Jul 20128:47 amRNSPreliminary Bulk Sample Results
8th Jun 201210:49 amRNSHolding(s) in Company
7th Jun 20121:39 pmRNSDirector/PDMR Shareholding
6th Jun 201211:08 amRNSLicence Extension Awarded
1st Jun 20127:00 amRNSAnnual Financial Report
31st May 201210:28 amRNSTotal Voting Rights
26th Apr 20127:00 amRNSAcquisition of remaining interest in IDC
13th Apr 20127:00 amRNSOperational Update at Motete Dyke
12th Apr 20122:38 pmRNSOperational Update
11th Apr 20127:00 amRNSFurther bulk sampling results from Lemphane
29th Mar 20127:00 amRNSCompletion of Micro-Diamond Recovery at Motete
26th Mar 20127:00 amRNSLaunch of website
19th Mar 201210:54 amRNSHolding(s) in Company
15th Mar 201210:55 amRNSHolding(s) in Company
1st Mar 20127:00 amRNSTotal Voting Rights
24th Feb 20127:00 amRNSNew Exploration Targets Identified in Lesotho
16th Feb 20127:00 amRNSFirst Large Diamonds Recovered from Lemphane
7th Feb 20127:00 amRNSFurther positive micro-diamond results from Motete
26th Jan 201212:25 pmRNSFundraising and Issue of Equity
18th Jan 20128:45 amRNSDirectorate Change
16th Jan 20127:00 amRNSDiamond grade and volumetric estimate at Motete
9th Jan 20127:00 amRNSFurther results from large micro-diamond sample
4th Jan 20127:00 amRNSPositive results from first micro-diamond sample
7th Dec 20117:00 amRNSAppointment of Nominated Adviser
1st Dec 20117:00 amRNSAward of License
7th Nov 20117:00 amRNSCommencement of bulk sampling at Lemphane, Lesotho
27th Sep 20117:00 amRNSInterim Results
31st Aug 20112:44 pmRNSUpdate on Operations and Exploration
29th Jul 20113:44 pmRNSTotal Voting Rights
26th Jul 20111:47 pmRNSDiamond and Gold Sale
26th Jul 201110:46 amRNSAward of Licence
14th Jul 20117:00 amRNSMineral Chemistry Results
21st Jun 201111:57 amRNSStatement re Further Directorate Change
21st Jun 20117:00 amRNSDirectorate Change
18th May 20117:00 amRNSCompletion of acquisiton of IDC
12th May 201111:29 amRNSResult of AGM
11th May 201111:48 amRNSDirector Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.