Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPRG.L Regulatory News (PRG)

  • There is currently no data for PRG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lemphane Scoping Study Released

22 Apr 2013 07:00

RNS Number : 8392C
Paragon Diamonds Limited
22 April 2013
 



22 April 2013

 

Paragon Diamonds Limited

("Paragon Diamonds" or the "Company")

(AIM: PRG)

 

Lemphane Scoping Study Released

 

 

Highlights

 

·; Anticipated kimberlite tonnage to be mined of 27Mt to 280m below surface at a 1.3:1 waste:ore ratio

·; Anticipated all-in mining costs

·; 10+ year life of mine at peak annual production in excess of 65,000 carats at US$ 1,500 per carat

·; Notional average operating profit of US$35M per year(1) excluding capital

·; 22% IRR at an anticipated ore value of US$33/tonne

 

 

Paragon Diamonds announces the release of content from its recently commissioned scoping study on the Lemphane Kimberlite Project in Lesotho.

 

The Company has made available on its website a summary version of the recently completed high-level scoping study commissioned with independent consultancy group Paradigm Project Management. The summary version consists of a 13 page condensed version of the 127 page full version submitted in February 2013 to the Ministry of Mines in Lesotho together with a Mining Lease Application.

 

The summary version details the main assumptions and parameters of the study including tonnages, grades, pit design, mine scheduling, tailings and waste rock disposal, an estimation of capital and operating costs and a financial model and sensitivity analysis. 

 

The scoping study summary can be viewed and downloaded as a PDF file at:

 

http://www.paragondiamonds.com/independent_technical_reports.php

 

Paragon Diamonds Chairman Martin Doyle said: "The scoping study confirms the favourable economics of the mining of the Lemphane kimberlite. Work is continuing on resource development with the current bulk sampling and delineation drilling programs. It is anticipated that on completion of the next trial mining phase of 100,000 tonnes of kimberlite a sufficiently robust resource will have been established to support a decision to proceed to full scale production."

 

Note (1) The definition of a mineral resource according to criteria laid down by the Canadian Institute of Mining, Metallurgy and Petroleum has not currently been achieved at Lemphane and accordingly the revenue assumptions used in the scoping study have been derived from the results of a number of statistically unrepresentative bulk samples over the surface of the exposed kimberlite.

 

In accordance with the AIM Rules, the information in this announcement has been reviewed by Stephen Grimmer PhD., MSc., a qualified geologist with over 25 years diamond exploration experience.

 

For further information:

 

Paragon Diamonds Limited

Martin Doyle - Chairman

Simon Retter - Finance Director

www.paragondiamonds.com

+44 (0) 20 7099 1940

 

Fox-Davies Capital Ltd (Nomad and Broker)

Jonathan Evans

Simon Leathers

+44 (0) 20 3463 5010

 

 

 

 

Notes to editors

Paragon Diamonds is looking to rapidly develop producing and exploration diamond properties located within Africa. To date it has secured a series of potentially high value assets which its exploration and development teams are working to progress. The core focus at present is the Company's hard rock licences located in Lesotho, a major producing diamond region. The Company's projects include:

 

Lemphane Kimberlite project Lesotho (85% interest)

Lemphane is one of five known diamond bearing kimberlite pipes within Lesotho, located 5km from the Liqhobong project. The environmental assessment plan, access routes and exploration camp have been completed. DMS plant has been constructed and bulk sampling commenced with 15,000 tonnes processed to date and 20,000 tonnes stockpiled awaiting processing. Extended bulk sampling of a further 25,000 - 40,000 tonnes is possible once initial sample is completed. Mining licence application submitted and drilling underway.

 

Motete Dyke exploration, Lesotho (85% interest)

Motete is a substantial kimberlite dyke (fissure system) in close proximity to the Lemphane project. The licence was awarded in December 2011. During 2012 a resource of 0.86Mct attributable to Paragon at a grade of 65 cpht and an average value of US$62/ct was defined.

 

Kaplamp diamond hosting Lamproite', Zambia

Kaplamp is a large prospecting licence known to host 14 Lamproite pipes within a known diamondiferous region and with five high profile targets identified for initial evaluation. The area is highly prospective as De Beers recovered significant amount of stones in 60's and 70's but relinquished area as Lamproites were not yet recognised as viable. The Argyle Diamond Mine in Western Australia is the most renowned Lamproite hosted mine - in 1994 produced 39% of worlds diamond production.

 

Kopje kimberlite exploration, Botswana

This newly awarded prospecting licence covering 15 km sq in highly prospective area 35 km east of DeBeers' large producing Orapa Mine.

 

Mabuki, Tanzania

Located 81km south of Mwanza, Tanzania with good infrastructure nearby (roads, power, water, transport) the licence sits within a known Kimberlite Field. Artisanal activity occurs to the west of licence with diamond bearing gravels identified off the edge of the licence. The intention is to explore (detailed geophysics and sampling) and map-out, then establish drill targets and define a resource. Wardell Armstrong completed a competent persons report on Tanzania in September 2010.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUKSNRONASAAR
Date   Source Headline
24th Dec 20157:00 amPRNCorporate Update
14th Dec 20155:00 pmPRNUpdate on Mothae
24th Nov 20158:50 amRNSResignation of Nominated Adviser and Broker
20th Nov 20151:22 pmRNSUpdate Regarding Suspension
16th Nov 20157:47 amRNSTemporary Suspension
16th Nov 20157:45 amRNSSuspension - Paragon Diamonds Limited
7th Oct 20157:00 amPRNCorporate and Mothae acquisition update
2nd Oct 20155:10 pmPRNHoldings in Company
2nd Oct 20157:00 amPRN$15 million Debt and Revenue Sharing Facility
30th Sep 20157:00 amPRNInterim Results
15th Sep 201511:30 amPRNPositive Technical Study for Mothae Kimberlite Project
7th Aug 20157:00 amPRNGovernment approval for acquisition of Mothae
4th Aug 201512:40 pmPRNResult of AGM
15th Jul 20157:02 amPRNHolding(s) in Company
15th Jul 20157:00 amPRNHolding(s) in Company
14th Jul 20157:00 amPRNMothae Acquisition Update
7th Jul 201511:56 amPRNHolding(s) in Company
29th Jun 20151:34 pmPRNAnnual Report and Notice of AGM
26th Jun 20157:00 amPRNFinal Results
18th Jun 20157:00 amPRNGBP500,000 debt financing & Share buyback programme
5th May 20157:00 amPRNMOU to acquire Mothae Kimberlite Project in Lesotho
25th Mar 20151:50 pmPRNHolding(s) in Company
25th Mar 20151:45 pmPRNHolding(s) in Company
13th Mar 20157:00 amPRNUpdate on Lemphane Diamond Project and Placing
3rd Mar 20157:01 amPRNHolding(s) in Company
3rd Mar 20157:00 amPRNHolding(s) in Company
28th Jan 20157:00 amPRNBinding MoU - US$12m equity and debt finance package
9th Jan 201512:52 pmPRNHolding(s) in Company
12th Dec 20147:01 amPRNShare Buy Back and Total Voting Rights
12th Dec 20147:00 amPRNHolding(s) in Company
9th Dec 201411:43 amPRNResult of General Meeting
8th Dec 20147:00 amPRNHoldings in Company
5th Dec 20147:00 amPRNIssue of Equity
4th Dec 201412:56 pmPRNOperations Update
25th Nov 20147:00 amPRNUpdate on Processing Plant - Lemphane Kimberlite Lesotho
20th Nov 201411:30 amPRNExercise of option by Titanium
17th Nov 20147:00 amPRNSale of large high value diamonds - Lemphane Lesotho
14th Nov 20147:00 amPRNPosting of Circular and Notice of General Meeting
13th Nov 20147:00 amPRNLesotho Subsidiary Board Changes
11th Nov 20147:00 amPRNDirectorate Change
11th Nov 20147:00 amPRNAcquisition of Lanstead Holding in Company
11th Nov 20147:00 amPRNAppointment of Adviser
1st Oct 201410:52 amPRNTotal Voting Rights
26th Sep 20147:00 amPRNIssue of Equity
25th Sep 201410:53 amPRNHoldings in Company
15th Sep 20147:01 amPRNInterim Results
15th Sep 20147:00 amPRNAppointment of Broker
27th Aug 20147:00 amRNSUpdate re: Paragon Diamonds Ltd
27th Aug 20147:00 amPRNBoard Changes & Transfer of Convertible Loan Agreement
15th Jul 20144:21 pmPRNResponse to Press Speculation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.