GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPremier African Minerals Regulatory News (PREM)

Share Price Information for Premier African Minerals (PREM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.114
Bid: 0.113
Ask: 0.115
Change: -0.005 (-4.20%)
Spread: 0.002 (1.77%)
Open: 0.119
High: 0.1145
Low: 0.112
Prev. Close: 0.119
PREM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zulu Update

12 Oct 2021 12:00

RNS Number : 8151O
Premier African Minerals Limited
12 October 2021
 

12 October 2021 

Premier African Minerals Limited

Zulu Update

Premier African Minerals Limited ("Premier" or the "Company"), is pleased to provide this update on progress at Premier's Zulu Lithium and Tantalum ("Zulu") project in Zimbabwe and the first preliminary grade estimates using a laser induced breakdown spectroscopy ("LIBS") system.

Highlights:

· Preliminary results from ZDD-52 (RNS 2 September 2021) for 13.39 M continuous mineralized section is 1.37% Li2O average grade across the entire width.

 

· Highest grade between 54.32 M and 55.32 M is 2.16% and lowest grade between 44.13 M and 45.13 M is 1%.

 

· 15 holes now complete with approximately 2,735 M drilled to date.

 

· Two rigs, with a night shift component now operating with one focused on geotechnical requirements for the Feasibility Study ("DFS") currently underway.

 

George Roach, CEO commented,"The preliminary results above are the first obtained from use of our LIBS system at site. The results are preliminary and subject to confirmation by independent certified laboratory analysis using industry accepted analytical methods for Lithium. Use of the LIBS system has only been possible through the fully compliant sample preparation set up at Zulu and is expected to expedite results and provide guidance to our resource development and ongoing drilling program. The LIBS system in use at Zulu has been calibrated using certified reference material and provides a high level of confidence in the results obtained.

It is particularly pleasing that this intersection is from an area not previously included in our existing resource statement but was forecast as an exploration target. More encouraging and most pleasing is the apparent consistent average grade across what is a wide intersection. Our team at Zulu are heavily engaged in core cutting and sample preparation for the many wide intersections encountered in the completed holes and we are hugely excited to see these results and look forward to consistent reporting and early confirmation from independent laboratories, allowing for potential upgrading of the overall resource tonnage.

Exploration activity is ongoing over the extended Exclusive Prospecting Order Area ("EPO") and will now also extend to look at gold potential in the region of the flooded shaft located within the EPO. Historic dumps at site hold potential to be assessed as much as a proper examination of the existing developments when we are able to dewater the mine.

Further updates will follow".

Drilling at Zulu: 

The Company has now completed a 15 drill holes, equivalent to approximately 2,735 M since the start of the DFS programme. The current drilling programme is focussed on expanding as well as upgrading the resources in the Main Zone, and, to delineate further the Lithium mineralisation in the step out zones.

 

Lithium Results: 

The table below sets out the preliminary results from hole ZDD-52. The analysis has been prepared at the Company's sample preparation facilities with the use of a LIBS system at site. The results are subject to confirmation by independent certified laboratory assays using industry accepted analytical methods for Lithium:

 

Table 1. Recent Drill Results.

 

Drill hole

Azimuth

Dip

Total length (M)

From (M)

To (M)

Interval length (M)*

 Li2O (%)

ZDD-52

225

60

190

41.93

55.32

13.39

1.37%

Including

 

 

 

44.13

45.13

1.0

1.0%

 

 

 

 

54.32

55.32

1.0

2.16%

* Drilled widths

Qualified Person:

Chris Male, Geologist with Premier, has reviewed and approved this release to the extent that reference is made to the Zulu. Mr. Male is a SACNASP and GSSA registered geoscientist with 13 years' experience in exploration and project management, in multicommodity projects throughout Africa.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.

The person who arranged the release of this announcement on behalf of the Company was George Roach.

Notes to Editors:

 

Premier African Minerals Limited (AIM: PREM) is a multi-commodity mining and natural resource development company focused on Southern Africa with its RHA Tungsten and Zulu Lithium projects in Zimbabwe.

 

The Company has a diverse portfolio of projects, which include tungsten, rare earth elements, lithium and tantalum in Zimbabwe and lithium and gold in Mozambique, encompassing brownfield projects with near-term production potential to grass-roots exploration. The Company holds 5,010,333 shares in Circum Minerals Limited, the owners of the Danakil Potash Project in Ethiopia, which has the potential to be a world class asset.

 

In addition, the Company holds a 19% interest in MN Holdings Limited, the operator of the Otjozondu Manganese Mining Project in Namibia.

Enquiries:

 

George Roach

Premier African Minerals Limited

Tel: +27 (0) 100 201 281

Michael Cornish / Roland Cornish

Beaumont Cornish Limited

(Nominated Adviser)

Tel: +44 (0) 20 7628 3396

Jerry Keen/Edward Mansfield

Shore Capital Stockbrokers Limited

Tel: +44 (0) 20 7408 4090

Matthew Bonner

EAS Advisors LLC

Tel: +1 646 495 2225

Glossary of Technical Terms:

"Li"

Lithium.

 

"Li2O"

Lithium Oxide and is the standard referenced in our Mineral Resource Estimate.

"LIBS"

Laser Induced Breakdown Spectroscopy

https://sciaps.com/libs-handheld-laser-analyzers/z-300/.

"M"

Meters.

Ends

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUUORRAUURAAA
Date   Source Headline
27th Apr 201610:43 amRNSControlling Interest:Mozambique Limestone Project
25th Apr 20162:03 pmRNSAGM Statement
6th Apr 20167:00 amRNSUpdate on RHA Tungsten Mine
31st Mar 20167:51 amRNSCircum Minerals update
23rd Mar 20164:04 pmRNSNotice of Annual General Meeting
1st Mar 20167:00 amRNSIssue of equity
24th Feb 201610:45 amRNSConversion of last remaining loan notes
23rd Feb 20163:34 pmRNSConversion of loan note and issue of equity
22nd Feb 20162:19 pmRNSRHA Project Update
22nd Feb 20161:37 pmRNSConversion of loan note and issue of equity
18th Feb 20169:57 amRNSConversion of loan note and issue of equity
16th Feb 20167:12 amRNSIssue of Equity
15th Feb 20161:15 pmRNSRHA Direct Finance Update
2nd Feb 20168:10 amRNSConversion of loan
2nd Feb 20167:00 amRNSIssue of equity and Proposed Conversion of loan
27th Jan 20167:00 amRNSOpen Pit Mineral Resource Review
18th Jan 20167:00 amRNSUnderground Implementation Update: RHA Mine
13th Jan 20167:00 amRNSIssue of Equity
21st Dec 201512:35 pmRNSZulu Tantalum and Lithium update
18th Dec 20154:33 pmRNSConversion of loan and issue of equity
11th Dec 201512:59 pmRNSConversion of loan and issue of equity
10th Dec 20157:00 amRNSCircum Minerals Update
10th Dec 20157:00 amRNSIssue of Equity
3rd Dec 201512:41 pmRNSConversion of loan note and issue of equity
24th Nov 20157:00 amRNSCorporate Update
20th Nov 20157:00 amRNSEarly Release of Second Tranche of Darwin Loan
27th Oct 20157:00 amRNSConversion of loan note and RHA Update
9th Oct 201512:13 pmRNSLoan Note Instrument
2nd Oct 20151:53 pmRNSIssue of Equity
30th Sep 201512:07 pmRNSInterim Results
22nd Sep 20157:00 amRNSIssue of Equity
15th Sep 20157:00 amRNSCorporate and RHA Project Update
25th Aug 20157:09 amRNSRHA Project and Corporate Update
7th Aug 20157:00 amRNSCircum Minerals Ltd Update
4th Aug 20159:18 amRNSRHA Project Update
30th Jul 20157:01 amRNSExercise of Share Options and Director's Dealings
14th Jul 20159:20 amRNSAward of new exploration tenements in Benin
10th Jul 201511:45 amRNSExercise of share options and director's dealings
9th Jul 20157:00 amRNSZulu Project update and equity issue
8th Jul 20157:30 amRNSRHA Project Update
24th Jun 20158:00 amRNSExercise of Warrants and Issue of Equity
24th Jun 20157:00 amRNSFinal Results
5th Jun 201512:46 pmRNSFirst Concentrates Produced at RHA
26th May 20157:01 amRNSConstruction Update
11th May 20158:48 amRNSReplacement: Circum Minerals Ltd Update
11th May 20157:00 amRNSCircum Minerals Ltd Update
5th May 20157:01 amRNSProcess Plant Fabrication Complete
1st May 20155:02 pmRNSConversion of loan note and issue of equity
29th Apr 20157:00 amRNSLoan Note Instrument
28th Apr 20157:00 amRNSConstruction on Schedule at RHA Tungsten Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.