Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPensana Regulatory News (PRE)

Share Price Information for Pensana (PRE)

Share Price is delayed by 15 minutes
Get Live Data
90.60    0.00 (0.00%)
Bid:
80.00
Ask:
101.00
Spread: 21.00 (26.25%)
Market Cap: £320.28m
PRE Live PriceLast checked at - London Stock Exchange

Intraday Pensana Share Chart

Trading Update

14 May 2008 07:00

RNS Number : 3614U
Pan Andean Resources PLC
14 May 2008
 

Commencement of 2D Seismic Programme on Antorcha BlockColombia

Highlights:

A 60km seismic programme has commenced on Pan Andean's 100% owned Antorcha block in Colombia

Approaches received to partner the block

Pan Andean (AIM:PRE), the AIM-listed oil & gas producer, is pleased to announce the start of seismic survey in the 100% owned Antorcha Block, located in the prolific Middle Magdalena Basin of Colombia. The block licence was signed in November 2007, after which Pan Andean accelerated an exploration programme to confirm the block's prospectivity, with the objective of drilling by the end of 2008.

Regional studies and surface geological work are complete.  Pan Andean is finalising seismic reprocessing of 7 existing seismic lines. Adjacent well data has also been interpreted.

A new 2D seismic survey campaign started in May 2008 and will cover c.60km and take approximately 2 months to complete. Once completed, Pan Andean expects to identify the optimal locations for drilling by July 2008. 

Antorcha neighbours an existing conventional oil producing area, operated by the state petroleum company Ecopetrol.

The Antorcha block is located up dip of existing oil producing fields, the Velasquez-Palagua field with more than 300 million barrels of oil reserves and the Teca-Cocorna-Nare-Jazmin heavy oil field with more than 1,000 million barrels of oil in place. Preliminary studies suggest significant undiscovered heavy oil potential at shallow depths of less than 2,000 feet.

Between 1 and 2 billion barrels of oil in place could exist on the block with 100 to 300 million barrels of recoverable reserves, using parameters of nearby fields i.e. porosity 20 - 25%, oil saturation 60%, average net oil thickness of 100 - 200 feet, recovery factor of 10 - 15%. Expected crude quality could be in the range of 10° to 20° API.

Subject to confirmation of drillable targets and well rig availability, a drilling programme will be undertaken by end 2008.

David Horgan, Managing Director of Pan Andean Resources, commented: 

"This is a key step in Pan Andean's development.  We are shooting a focused seismic programme to optimise early drilling and the Company has already been approached by major oil players interested in funding an early drilling campaign on this block.

We have long been impressed at the excellent fiscal terms available in Colombia, excellent security in the Antorcha region and no community or environmental issues in what is a long established hydrocarbon producing area. Higher oil prices have transformed the economics of unconventional oil, yet this sector is only now being developed - though targeted Colombian plays contain much lighter oil than that in Venezuela's Maracaibo Basin. Applying techniques perfected in neighbouring Venezuela, Pan Andean identified Antorcha as an attractive substantial play which can be proven with shallow drilling.

The geological model is simple; targeting a shallow reservoir up-dip of existing fields, with extensive seepages. We look forward to hopefully commencing our drilling programme on this play by the end of 2008."

This announcement has been approved by Ivan Sandrea, Director, Pan Andean. Mr Sandrea has more than 10 years of international E&P experience.

Contacts:

Pan Andean

David Horgan, Managing Director 

+ 353 87 292 3500

John Teeling, Chairman

+ 353 1 833 2833

College Hill

Paddy Blewer

+44 (0)20 7457 2020

Nick Elwes

Blue Oar Securities Plc

John Wakefield

+44 (0)117 933 0020

Simon Moynagh

www.panandeanresources.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
TSTILFLREVIVLIT
Date   Source Headline
28th Apr 20264:59 pmPRNHolding(s) in Company
17th Apr 20267:00 amPRNUS$165 million Strategic Investment to support U.S. Mine to Magnet strategy
9th Mar 202611:20 amPRNAdjournment of General Meeting and Corporate Presentation
4th Mar 20267:28 amPRNIncreased US$165 million Strategic Investment to support U.S. Mine to Magnet strategy - Proposed adjournment of General Meeting
3rd Mar 20267:00 amPRNConstruction on track for 2027 first production
10th Feb 20263:10 pmPRNUS$ 160 million Strategic Equity Investment
4th Feb 20267:00 amPRNUpdate on US$25 million Longonjo mine finance
21st Jan 202612:28 pmPRNIssue of Equity
21st Jan 20267:04 amPRNUpdate on Longonjo infill and resource expansion drill programme
14th Jan 202612:28 pmPRNDirectors Dealings
14th Jan 20267:00 amPRNLongonjo Main Construction well underway
23rd Dec 20252:09 pmRNSHolding(s) in Company
23rd Dec 20252:09 pmPRNHolding(s) in Company
19th Dec 202511:08 amRNSIssue of Equity - Updated Admission Date and number of shares to be issued
19th Dec 202511:08 amPRNIssue of Equity - Updated Admission Date and number of shares to be issued
18th Dec 20251:46 pmRNSIssue of Equity
18th Dec 20251:46 pmPRNIssue of Equity
18th Dec 20251:01 pmRNSIssue of Equity
18th Dec 20251:01 pmPRNIssue of Equity
18th Dec 20257:00 amPRNMajor shareholder support for US Strategy
16th Dec 202510:00 amPRNIssue of Equity
15th Dec 20253:15 pmPRNIssue of Equity/Total Voting Rights
9th Dec 20257:00 amPRNUS$100 million Strategic Equity Investment
3rd Dec 202512:08 pmPRNAnnual General Meeting - Chairman's Presentation
3rd Dec 202511:57 amPRNResult of AGM
27th Nov 20257:00 amPRNLongonjo study lifts HREE production fivefold
17th Nov 20257:00 amPRNMajor drill programme to increase Longonjo resource to over one billion tonnes
10th Nov 20257:00 amPRNNotice of Annual General Meeting and Form of Proxy
31st Oct 20258:43 amPRNNew Corporate Presentation
28th Oct 20257:00 amPRNU.S. EXIM debt funding to accelerate U.S. mine-to-magnet supply chain
22nd Oct 20257:00 amPRNPartnership with Vacuumschmelze GmbH to establish mine-to-magnet supply chain in the US
15th Oct 20259:00 amPRNPublication of Annual Report 2025 and Notice of Annual General Meeting
9th Oct 20251:21 pmPRNIssue of Equity
30th Sep 20257:00 amPRNDate of Annual General Meeting and proposed share consolidation
26th Sep 20254:34 pmPRNHolding(s) in Company
25th Sep 20259:15 amPRNNew Corporate Presentation
9th Sep 20257:00 amPRNAppointment of Chief Operating Officer
5th Sep 202511:04 amPRNIssue of Equity
3rd Sep 20254:57 pmPRNHolding(s) in Company
11th Aug 20257:00 amPRNAppointment of US advisor Stonegate Capital Partners
28th Jul 20257:00 amPRNLongonjo construction budget on track and Coola carbonatite drilling
23rd Jun 20257:00 amPRNMOU with ReElement Technologies to develop a sustainable rare earth supply chain
18th Jun 202511:22 amPRNIssue of Equity
18th Jun 20259:17 amPRNHolding(s) in Company
16th Jun 20257:00 amPRNMOU with Toyota Tsusho Corporation for Rare Earth Offtake
13th Jun 20259:59 amPRNHolding(s) in Company
10th Jun 202512:21 pmPRNGrant of Share Awards
10th Jun 202512:19 pmPRNIssue of Equity/Total Voting Rights
5th Jun 202511:10 amPRNIssue of Equity
30th May 20257:00 amPRNGBP 2 million Placement to major institutional shareholders

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.