Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

26 Nov 2007 07:00

Patagonia Gold PLC26 November 2007 PATAGONIA GOLD PLC (AIM:PGDL) DRILLING UPDATE: EL TRANQUILO PROPERTY AND PROGRESS REPORT: LA PALOMA PROPERTY, SANTA CRUZ, ARGENTINA Highlights •Drilling on the Cap-Oeste Prospect, located on the El Tranquilo Property, has reported very encouraging results in the first 11 of a 32 drill hole programme including 5 metres at 28.70g/t gold and 84.1g/t silver. •Exploration drilling on the adjacent Breccia Valentina Prospect, located on the El Tranquilo Property has also reported very encouraging results in the first 2 of a 12 drill hole programme including 5.2 metres at 3.35g/t gold. •Chlumsky, Armbrust and Meyer ("CAM"), consulting and engineering group headquartered in Lakewood, Colorado, U.S.A., have commenced work on a Canadian National Instrument (NI) 43-101 compliant Scoping Study on the Lomada de Leiva Project located on the La Paloma Property. El Tranquilo Property The El Tranquilo Property, covering over 40 square kilometres, is locatedapproximately 120km south east of La Paloma in the Santa Cruz province ofArgentina. It contains the Cap Oeste Prospect and Breccia Valentina Prospect. PGD's Property 29 'La Bajada' is contiguous with the El Tranquilo Property andcontains a number of gold anomalous and geologically encouraging areas. Cap-Oeste Prospect Drilling has commenced on the highly prospective Cap-Oeste Prospect. Resultsfrom the first 11 holes are now available and significant intersections include: +-------------+---------+----------+--------+--------+ |Drill Hole |From |Interval |Gold |Silver | |No. |metres |metres | | | | | | |g/t |g/t | +-------------+---------+----------+--------+--------+ |COR-001-R | 44.0| 13.0| 11.55| 47.49| +-------------+---------+----------+--------+--------+ |including | 50.0| 5.0| 28.70| 84.10| +-------------+---------+----------+--------+--------+ |and | 65.0| 5.0| 1.40| 28.20| +-------------+---------+----------+--------+--------+ |COR-002-R | 48.0| 6.0| 2.36| 68.20| +-------------+---------+----------+--------+--------+ |COR-007-R | 49.0| 5.0| 5.80| 68.40| +-------------+---------+----------+--------+--------+ |COR-008-R | 40.0| 10.0| 3.61| 32.70| +-------------+---------+----------+--------+--------+ |COR-011-RD | 105.6| 7.9| 3.36| *| +-------------+---------+----------+--------+--------+ To date, 20 drill holes have been completed for a total of 1,690 metres,consisting of 8 Reverse Circulation ("RC") drill holes spaced along 350 metresof the anomaly established by trenching earlier this year, a further 8 step backdrill holes, RC with a diamond tail, with the remaining holes as an explorationfence across the southern extension of the anomaly. Results from the remaining 9holes are pending and will be announced in due course. Drilling has confirmed the presence of a wide (up to 20 metres) gold mineralisedzone of more than 0.5g/t with a high grade core. The zone remains open at depthand along strike in both directions. Further drilling is underway to the southeast and north west along strike in order to extend the zone, together withadditional step back drill holes. Breccia Valentina Prospect Drilling has commenced on the Breccia Valentina Prospect, located approximately5 kilometres along strike from Cap-Oeste. Results from the first 2 holes are nowavailable and significant intersections include: +-------------+---------+----------+--------+--------+ |Drill Hole |From |Interval |Gold |Silver | |No. |Metres |metres | | | | | | |g/t |g/t | +-------------+---------+----------+--------+--------+ |BVA-002-D | 26.0| 12.5| 2.38| *| +-------------+---------+----------+--------+--------+ |Including | 28.0| 5.2| 3.35| *| +-------------+---------+----------+--------+--------+ |And | 129.0| 5.0| 3.11| *| +-------------+---------+----------+--------+--------+*Results are pending The above results confirm that the gold tenor is improving with depth. Breccia Valentina is interpreted as a structurally controlled phreatic brecciapipe characterised at surface by high level silica hosting highly anomalous goldin veins and breccias formed in association with an adjacent dome. Thiscompelling conceptual target, the model for which potentially hosts economicgold grades at depth, is typical of other Pacific Rim phreatic breccias hostingeconomic gold resources. To date, 7 diamond drill holes have been completed for a total of 1,094 metresalong the anomaly established by trenching earlier this year. Results of theremaining 5 holes are pending. The El Tranquilo property block also contains other highly prospective areaswhich require further exploration in order to define the potential for drilltargets. La Paloma Property The La Paloma property block, covering over 44 square kilometres, is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina and contains the Lomada de Leiva Project and the adjacentBreccia Sofia Prospect. Lomada de Leiva Project In October 2007 a NI 43-101 compliant resource was announced at a 0.3g/t goldcut off of Measured and Indicated at 161,346 ounces gold and an additionalInferred Resource of 73,725 ounces of gold. Patagonia Gold Plc was sufficiently encouraged with the results to engage CAM,the consulting and engineering group from Lakewood, Colorado, USA., to prepare aScoping Study for the project. A controlled source audio frequency magnetotellurics ("CSAMT") geophysics surveyis nearing completion on the interpreted southern extension of the Lomada deLeiva mineralised zone as well as on its northerly trend towards Breccia Sofia.The survey has also targeted sub parallel structures to the east, the upperportions of which were identified by previous drilling. Currently drill sections in conjunction with the geophysical survey results arebeing interpreted to form the basis of an infill and expansion drill programmeat Lomada de Leiva. This drilling will also include metallurgical holes as wellas pit design holes anticipated from the Scoping Study A 3,000 metre drilling programme is planned on Lomada de Leiva and Breccia Sofiato commence early in Q1, 2008. Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. www.patagoniagold.com ENDS For more information, please contact: Bill Humphries/Richard Prickett Arabella Hobbs/ Leesa PetersPatagonia Gold Plc Conduit PRTel: + 44 (0)20 7409 7444 Tel: + 44(0)20 7429 6610/ +44 (0) 7833 926 694 Simon Raggett / Angela Peace Alastair Stratton / Tim GrahamStrand Partners Ltd Matrix Corporate Capital LLPTel: +44(0)20 7409 3494 Tel: + 44(0)20 7925 3234/ +44 (0) 7925 7852 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Sep 20117:00 amRNSDrilling Update
7th Sep 20113:38 pmRNSExercise of Options
2nd Aug 20113:15 pmRNSExercise of Options
1st Aug 20113:07 pmRNSExercise of Options
8th Jul 20114:20 pmRNSExercise of Options
9th Jun 20117:00 amRNSResult of AGM
8th Jun 20117:00 amRNSAppointment of Chief Financial Officer
6th Jun 20117:00 amRNSDrilling Report
1st Jun 20117:00 amRNSDrilling Report
18th May 20117:00 amRNSPROGRESS REPORT LOMADA GOLD PROJECT
13th May 20114:58 pmRNSGrant of Options
10th May 20111:46 pmRNSExercise of Options
9th May 20117:00 amRNSFinal Results
28th Apr 20119:32 amRNSPlacing to raise £5.25 million
19th Apr 20111:17 pmRNSPlacing and Subscription to raise £19m
14th Apr 201111:32 amRNSExercise of Options
7th Apr 20117:00 amRNSDRILLING UPDATE - CAP-OESTE
5th Apr 20117:00 amRNSPROGRESS REPORT
29th Mar 20117:00 amRNSCOSE Resource and Preliminary Economic Assessment
23rd Mar 20117:00 amRNSAmendment to Barrick Agreement
8th Mar 20118:00 amRNSExercise of Options
18th Feb 201111:29 amRNSGrant of options
10th Feb 201110:05 amRNSExercise of Options
26th Jan 20117:00 amRNSPROGRESS REPORT
5th Jan 20112:01 pmRNSExercise of Options
7th Dec 20107:00 amRNSExploration Progress
24th Nov 20107:00 amRNSProgress Report - Cap-Oeste South East Project
15th Nov 20106:15 pmRNSExercise of Options
10th Nov 20107:00 amRNSUpdate - Lomada Gold-Heap Leach Project
8th Nov 20104:30 pmRNSExercise of Options
3rd Nov 20107:00 amRNSDrilling Report
29th Oct 201011:00 amRNSExercise of Options
25th Oct 201010:00 amRNSExercise of options
25th Oct 201010:00 amRNSExercise of options
29th Sep 20107:00 amRNSHalf Yearly Report
14th Sep 201012:38 pmRNSExercise of Options
14th Sep 20107:00 amRNSAdvanced Exploration Target
10th Sep 20101:01 pmRNSDirector/PDMR Shareholding
8th Sep 20107:00 amRNSLomada Progress Report
27th Jul 20109:22 amRNSReplacement - PROGRESS REPORT
27th Jul 20107:00 amRNSPROGRESS REPORT
18th Jun 20101:21 pmRNSGrant of options
16th Jun 20105:00 pmRNSResult of AGM
16th Jun 20107:00 amRNSDrilling Report
21st May 20107:00 amRNSFinal Results
4th May 20107:00 amRNSPlacing and Subscription
16th Apr 20109:06 amRNSPermit received for Lomada de Leiva
15th Apr 20104:42 pmRNSHolding(s) in Company
14th Apr 20107:00 amRNSDrilling Report
23rd Mar 20107:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.