Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

26 Nov 2007 07:00

Patagonia Gold PLC26 November 2007 PATAGONIA GOLD PLC (AIM:PGDL) DRILLING UPDATE: EL TRANQUILO PROPERTY AND PROGRESS REPORT: LA PALOMA PROPERTY, SANTA CRUZ, ARGENTINA Highlights •Drilling on the Cap-Oeste Prospect, located on the El Tranquilo Property, has reported very encouraging results in the first 11 of a 32 drill hole programme including 5 metres at 28.70g/t gold and 84.1g/t silver. •Exploration drilling on the adjacent Breccia Valentina Prospect, located on the El Tranquilo Property has also reported very encouraging results in the first 2 of a 12 drill hole programme including 5.2 metres at 3.35g/t gold. •Chlumsky, Armbrust and Meyer ("CAM"), consulting and engineering group headquartered in Lakewood, Colorado, U.S.A., have commenced work on a Canadian National Instrument (NI) 43-101 compliant Scoping Study on the Lomada de Leiva Project located on the La Paloma Property. El Tranquilo Property The El Tranquilo Property, covering over 40 square kilometres, is locatedapproximately 120km south east of La Paloma in the Santa Cruz province ofArgentina. It contains the Cap Oeste Prospect and Breccia Valentina Prospect. PGD's Property 29 'La Bajada' is contiguous with the El Tranquilo Property andcontains a number of gold anomalous and geologically encouraging areas. Cap-Oeste Prospect Drilling has commenced on the highly prospective Cap-Oeste Prospect. Resultsfrom the first 11 holes are now available and significant intersections include: +-------------+---------+----------+--------+--------+ |Drill Hole |From |Interval |Gold |Silver | |No. |metres |metres | | | | | | |g/t |g/t | +-------------+---------+----------+--------+--------+ |COR-001-R | 44.0| 13.0| 11.55| 47.49| +-------------+---------+----------+--------+--------+ |including | 50.0| 5.0| 28.70| 84.10| +-------------+---------+----------+--------+--------+ |and | 65.0| 5.0| 1.40| 28.20| +-------------+---------+----------+--------+--------+ |COR-002-R | 48.0| 6.0| 2.36| 68.20| +-------------+---------+----------+--------+--------+ |COR-007-R | 49.0| 5.0| 5.80| 68.40| +-------------+---------+----------+--------+--------+ |COR-008-R | 40.0| 10.0| 3.61| 32.70| +-------------+---------+----------+--------+--------+ |COR-011-RD | 105.6| 7.9| 3.36| *| +-------------+---------+----------+--------+--------+ To date, 20 drill holes have been completed for a total of 1,690 metres,consisting of 8 Reverse Circulation ("RC") drill holes spaced along 350 metresof the anomaly established by trenching earlier this year, a further 8 step backdrill holes, RC with a diamond tail, with the remaining holes as an explorationfence across the southern extension of the anomaly. Results from the remaining 9holes are pending and will be announced in due course. Drilling has confirmed the presence of a wide (up to 20 metres) gold mineralisedzone of more than 0.5g/t with a high grade core. The zone remains open at depthand along strike in both directions. Further drilling is underway to the southeast and north west along strike in order to extend the zone, together withadditional step back drill holes. Breccia Valentina Prospect Drilling has commenced on the Breccia Valentina Prospect, located approximately5 kilometres along strike from Cap-Oeste. Results from the first 2 holes are nowavailable and significant intersections include: +-------------+---------+----------+--------+--------+ |Drill Hole |From |Interval |Gold |Silver | |No. |Metres |metres | | | | | | |g/t |g/t | +-------------+---------+----------+--------+--------+ |BVA-002-D | 26.0| 12.5| 2.38| *| +-------------+---------+----------+--------+--------+ |Including | 28.0| 5.2| 3.35| *| +-------------+---------+----------+--------+--------+ |And | 129.0| 5.0| 3.11| *| +-------------+---------+----------+--------+--------+*Results are pending The above results confirm that the gold tenor is improving with depth. Breccia Valentina is interpreted as a structurally controlled phreatic brecciapipe characterised at surface by high level silica hosting highly anomalous goldin veins and breccias formed in association with an adjacent dome. Thiscompelling conceptual target, the model for which potentially hosts economicgold grades at depth, is typical of other Pacific Rim phreatic breccias hostingeconomic gold resources. To date, 7 diamond drill holes have been completed for a total of 1,094 metresalong the anomaly established by trenching earlier this year. Results of theremaining 5 holes are pending. The El Tranquilo property block also contains other highly prospective areaswhich require further exploration in order to define the potential for drilltargets. La Paloma Property The La Paloma property block, covering over 44 square kilometres, is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina and contains the Lomada de Leiva Project and the adjacentBreccia Sofia Prospect. Lomada de Leiva Project In October 2007 a NI 43-101 compliant resource was announced at a 0.3g/t goldcut off of Measured and Indicated at 161,346 ounces gold and an additionalInferred Resource of 73,725 ounces of gold. Patagonia Gold Plc was sufficiently encouraged with the results to engage CAM,the consulting and engineering group from Lakewood, Colorado, USA., to prepare aScoping Study for the project. A controlled source audio frequency magnetotellurics ("CSAMT") geophysics surveyis nearing completion on the interpreted southern extension of the Lomada deLeiva mineralised zone as well as on its northerly trend towards Breccia Sofia.The survey has also targeted sub parallel structures to the east, the upperportions of which were identified by previous drilling. Currently drill sections in conjunction with the geophysical survey results arebeing interpreted to form the basis of an infill and expansion drill programmeat Lomada de Leiva. This drilling will also include metallurgical holes as wellas pit design holes anticipated from the Scoping Study A 3,000 metre drilling programme is planned on Lomada de Leiva and Breccia Sofiato commence early in Q1, 2008. Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. www.patagoniagold.com ENDS For more information, please contact: Bill Humphries/Richard Prickett Arabella Hobbs/ Leesa PetersPatagonia Gold Plc Conduit PRTel: + 44 (0)20 7409 7444 Tel: + 44(0)20 7429 6610/ +44 (0) 7833 926 694 Simon Raggett / Angela Peace Alastair Stratton / Tim GrahamStrand Partners Ltd Matrix Corporate Capital LLPTel: +44(0)20 7409 3494 Tel: + 44(0)20 7925 3234/ +44 (0) 7925 7852 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Nov 20121:00 pmRNSGold Room commissioned and first gold production
22nd Nov 20127:00 amRNSLomada de Leiva Permit
25th Oct 20126:15 pmRNSPlacing and Subscription
17th Oct 201212:31 pmRNSUpdate: Lomada de Leiva
21st Sep 20124:40 pmRNSSecond Price Monitoring Extn
21st Sep 20124:35 pmRNSPrice Monitoring Extension
17th Sep 20127:00 amRNSHalf Yearly Report
10th Sep 20127:00 amRNSCap-Oeste Resource Update
4th Sep 20124:35 pmRNSPrice Monitoring Extension
20th Aug 20124:35 pmRNSPrice Monitoring Extension
31st Jul 20124:35 pmRNSPrice Monitoring Extension
13th Jul 20124:40 pmRNSSecond Price Monitoring Extn
13th Jul 20124:35 pmRNSPrice Monitoring Extension
9th Jul 20124:35 pmRNSPrice Monitoring Extension
5th Jul 20127:00 amRNSDrilling Report
2nd Jul 20124:35 pmRNSPrice Monitoring Extension
28th Jun 20121:00 pmRNSDirector Shareholding
6th Jun 20125:45 pmRNSResult of AGM
6th Jun 20127:00 amRNSPlacing and Subscription
1st Jun 20127:00 amRNSExercise of Options
30th May 201211:44 amRNSReplacement - Operations Update: Lomada de Leiva
30th May 20127:00 amRNSOperations Update - Lomada de Leiva Gold Project
29th May 20127:00 amRNSExercise of Options
25th May 20127:00 amRNSExercise of Options
14th May 20129:38 amRNSPosting of Annual Report and Notice of AGM
25th Apr 20127:00 amRNS2011 Year End Financial Results
28th Mar 20127:00 amRNSDrilling Update - Cap-Oeste
16th Mar 20124:35 pmRNSPrice Monitoring Extension
14th Mar 20127:00 amRNSExercise of Options
7th Mar 20127:00 amRNSDirector Shareholding
6th Mar 20121:30 pmRNSExercise of Options
21st Feb 20127:00 amRNSCap-Oeste Metallurgical Test Update
20th Feb 20127:00 amRNSGrant of Options
18th Jan 201212:30 pmRNSDirector/PDMR Shareholding
12th Jan 20127:00 amRNSCap-Oeste Drilling Update
5th Jan 20127:00 amRNSACQUISITION OF ESTANCIA 'EL TRANQUILO'
20th Dec 20117:00 amRNSExercise of Options
14th Dec 20117:00 amRNSAppointment of Broker
7th Dec 201112:00 pmRNSCommencement of trading on TSX
6th Dec 20117:00 amRNSDual Listing on TSX
2nd Dec 20117:00 amRNSDirectorate Change
30th Nov 20117:00 amRNSCAP-OESTE UPDATED RESOURCE ESTIMATE
14th Nov 20117:00 amRNSChange of Registrar
3rd Nov 201111:38 amRNSDirector Declaration
2nd Nov 20117:00 amRNSDirectorate Change
31st Oct 20117:00 amRNSProgress Update - COSE
26th Oct 20117:00 amRNSFOMICRUZ SHAREHOLDERS AGREEMENT
24th Oct 20117:00 amRNSDrilling Report
3rd Oct 20113:01 pmRNSIssue of Equity
28th Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.