Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

10 Oct 2011 07:00

RNS Number : 8397P
Petroceltic International PLC
10 October 2011
 



 

Petroceltic International plc

Algeria Operational Update

AT-8 Produces flow rate of 38.6 mmscf/d

Condensate production of over 1,100 barrels per day

 

Petroceltic International plc ("Petroceltic" or "the Company"),announces that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d. In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

 

Following the pre-fracture stimulation results announced on 3rd October 2011, the upper Ordovician interval of the AT-8 well was successfully fracture stimulated. The well has subsequently produced 38.6 mmscf/d with 1,181 barrels per day of condensate on a 96/64" choke and with a flowing well head pressure of 1,393 PSIG. Pre-fracture gas flow rates at AT-8 were 15.4 mmscf/d.

 

Testing of the upper interval will continue at other choke settings to gather additional reservoir performance and fluid data before down-hole pressure gauges are installed and the well suspended. The gauges will be left in the well for one month to record an extended pressure build-up survey, and will be recovered after the testing of the AT-7 well which is next in the rigless testing programme.

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the Ain Tsila field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

Petroceltic is an upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, The Company operates the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted that fracture stimulation has substantially enhanced the excellent flow results at AT-8. This flow rate has been constrained by testing facilities and we estimate that a potential rate in excess of 50 mmscf/d of gas is possible from this well in the production phase. These results exceed the very high flow rates reached in the 2009 AT-1 well tests and further confirm that high deliverability is achievable in this field. The gas flow rates achieved here will have a significant impact on the Field Development Plan which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with AT-7 well test results and the AT-9 well logging and testing scheduled before year end."

 

Ends

For further information, please contact:

 

Brian O’ Cathain / Tom Hickey, Petroceltic International
Tel: +353 (1) 421 8300
Philip Dennis/Rollo Crichton-Stuart, Pelham Bell Pottinger
Tel: +44 (20) 7861 3919
Joe Murray / Joe Heron, Murray Consultants
Tel: +353 (1) 4980300
Hugh McCutcheon / John Frain, Davy
Tel: +353 (1) 679 6363
 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet of gas per day

PSIG: Pounds per square inch (gauge)

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSIESUFFSELS
Date   Source Headline
20th Aug 201211:41 amBUSForm 8.3 - Petroceltic International Plc
20th Aug 201211:40 amRNSForm 8 (DD) Petroceltic International
20th Aug 201210:45 amRNSForm 8.3 - Petroceltic International PLC
17th Aug 20121:21 pmRNSForm 8.3 - Petroceltic International Plc
17th Aug 201212:41 pmRNSForm 8.3 - Melrose Resources Plc
17th Aug 201212:08 pmRNSForm 8.3 - PETROCELTIC INTL
17th Aug 201210:44 amRNSForm 8.3 - Petroceltic International Plc
17th Aug 20127:01 amRNSPETROCELTIC OPENING DISCLOSURE IN MELROSE
17th Aug 20127:01 amRNSPETROCELTIC OPENING DISCLOSURE IN OWN SHARES
17th Aug 20127:00 amRNSRECOMMENDED MERGER OF MELROSE AND PETROCELTIC
15th Aug 20122:22 pmRNSHolding(s) in Company
15th Aug 20127:00 amRNSBoard Changes
9th Aug 20127:00 amRNSAlgeria Declaration of Commerciality
6th Aug 20127:00 amRNSUpdate on Italian Offshore Legislation
25th Jul 20127:00 amRNSAin Tsila - Update on Commerciality Process
23rd Jul 20125:34 pmRNSHolding(s) in Company
17th Jul 20123:19 pmRNSHolding(s) in Company
9th Jul 20123:15 pmRNSHolding(s) in Company
5th Jul 20124:40 pmRNSHolding(s) in Company
5th Jul 20127:00 amRNSAward of two Licences offshore Italy
2nd Jul 20123:10 pmRNSHolding in Company
29th Jun 20127:00 amRNSUpdate on Italian Offshore Legislation
28th Jun 20124:23 pmRNSHolding(s) in Company
12th Jun 20125:27 pmRNSResults of AGM
12th Jun 20124:35 pmRNSPrice Monitoring Extension
18th May 20125:00 pmRNSAnnual Report & Notice of AGM
26th Apr 20127:00 amRNSFinal Results
14th Feb 20127:00 amRNSReceipt of Funds from Enel
10th Feb 201212:43 pmRNSHolding(s) in Company
3rd Feb 20127:00 amRNSAlgeria - Completion of Enel Transaction
20th Jan 20126:08 pmRNSHolding(s) in Company
17th Jan 20125:05 pmRNSHolding(s) in Company
19th Dec 20117:00 amRNSAlgeria - Ratification of Enel Transaction
15th Dec 20115:09 pmRNSHolding(s) in Company
15th Dec 20117:00 amRNSAlgerian Operational Update
14th Dec 20117:00 amRNSBoard Appointment
7th Dec 20117:00 amRNSAlgerian Operational Update
5th Dec 201110:58 amRNSHolding(s) in Company
25th Nov 20114:49 pmRNSDirectorship Update
8th Nov 20117:00 amRNSAlgeria Operational Update
27th Oct 20117:00 amRNSCapital Markets Day
17th Oct 201111:44 amRNSDirector Holdings
10th Oct 20113:05 pmRNSHolding(s) in Company
10th Oct 20117:00 amRNSMacquarie Finance Facility
10th Oct 20117:00 amRNSAlgeria Operational Update
7th Oct 20114:31 pmRNSHolding(s) in Company
4th Oct 20117:00 amRNSSenior Management Appointment
3rd Oct 20117:00 amRNSAlgerian Operational Update
20th Sep 20119:49 amRNSHolding(s) in Company
19th Sep 20113:44 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.