Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

10 Oct 2011 07:00

RNS Number : 8397P
Petroceltic International PLC
10 October 2011
 



 

Petroceltic International plc

Algeria Operational Update

AT-8 Produces flow rate of 38.6 mmscf/d

Condensate production of over 1,100 barrels per day

 

Petroceltic International plc ("Petroceltic" or "the Company"),announces that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d. In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

 

Following the pre-fracture stimulation results announced on 3rd October 2011, the upper Ordovician interval of the AT-8 well was successfully fracture stimulated. The well has subsequently produced 38.6 mmscf/d with 1,181 barrels per day of condensate on a 96/64" choke and with a flowing well head pressure of 1,393 PSIG. Pre-fracture gas flow rates at AT-8 were 15.4 mmscf/d.

 

Testing of the upper interval will continue at other choke settings to gather additional reservoir performance and fluid data before down-hole pressure gauges are installed and the well suspended. The gauges will be left in the well for one month to record an extended pressure build-up survey, and will be recovered after the testing of the AT-7 well which is next in the rigless testing programme.

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the Ain Tsila field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

Petroceltic is an upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, The Company operates the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted that fracture stimulation has substantially enhanced the excellent flow results at AT-8. This flow rate has been constrained by testing facilities and we estimate that a potential rate in excess of 50 mmscf/d of gas is possible from this well in the production phase. These results exceed the very high flow rates reached in the 2009 AT-1 well tests and further confirm that high deliverability is achievable in this field. The gas flow rates achieved here will have a significant impact on the Field Development Plan which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with AT-7 well test results and the AT-9 well logging and testing scheduled before year end."

 

Ends

For further information, please contact:

 

Brian O’ Cathain / Tom Hickey, Petroceltic International
Tel: +353 (1) 421 8300
Philip Dennis/Rollo Crichton-Stuart, Pelham Bell Pottinger
Tel: +44 (20) 7861 3919
Joe Murray / Joe Heron, Murray Consultants
Tel: +353 (1) 4980300
Hugh McCutcheon / John Frain, Davy
Tel: +353 (1) 679 6363
 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet of gas per day

PSIG: Pounds per square inch (gauge)

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSIESUFFSELS
Date   Source Headline
2nd Nov 20107:00 amRNSDirectorate Change
28th Oct 20103:45 pmRNSHolding(s) in Company
12th Oct 20108:36 amRNSOperational Update
6th Oct 20105:08 pmRNSHolding(s) in Company
27th Sep 20101:41 pmRNSHolding in Company
14th Sep 20107:00 amRNSInterim Results & Operational Update
3rd Aug 20107:00 amRNSOperational Update - Tunisia
26th Jul 20107:00 amRNSAlgeria Rig Contract
20th Jul 20107:10 amRNSItalian Update
20th Jul 20107:00 amRNSTunisian Well Spud
13th Jul 20104:16 pmRNSHolding(s) in Company
1st Jul 20103:49 pmRNSItalian Update
29th Jun 20105:05 pmRNSHolding(s) in Company
29th Jun 20105:00 pmRNSDocument Availability
21st Jun 20104:40 pmRNSSecond Price Monitoring Extn
21st Jun 20104:35 pmRNSPrice Monitoring Extension
1st Jun 20105:59 pmRNSResult of AGM
1st Jun 201012:00 pmRNSAGM Statement
1st Jun 20107:00 amRNSItalian Farm Out
26th May 20104:40 pmRNSSecond Price Monitoring Extn
26th May 20104:35 pmRNSPrice Monitoring Extension
14th May 20105:14 pmRNSHolding(s) in Company
14th May 20105:14 pmRNSHolding(s) in Company
11th May 20107:00 amRNSESM Notice
5th May 20106:06 pmRNSExercise of Options
5th May 20107:00 amRNSDirectorate Change
30th Apr 20104:45 pmRNSHolding(s) in Company
28th Apr 20104:57 pmRNSHolding(s) in Company
28th Apr 20107:00 amRNSFinal Results
23rd Apr 20107:00 amRNSIEX Notice
21st Apr 20102:04 pmRNSResult of EGM
21st Apr 201010:32 amRNSChange of Registered Address
12th Apr 20105:56 pmRNSHolding(s) in Company
6th Apr 201012:00 pmRNSAlgerian PSC Extension
29th Mar 20105:28 pmRNSDocument Availability
29th Mar 20107:00 amRNS$120m Placing
4th Mar 20107:00 amRNSOperational Update
2nd Feb 20107:00 amRNSAlgerian Drilling Update - INW2
20th Jan 20105:46 pmRNSHolding(s) in Company
19th Jan 20105:13 pmRNSHolding(s) in Company
18th Jan 20105:31 pmRNSHolding(s) in Company
18th Jan 20107:00 amRNSPlacing of Iberdrola Shareholding
12th Jan 20107:00 amRNSOperational Update
5th Jan 20107:00 amRNSBoard Changes
4th Jan 20103:52 pmRNSHolding(s) in Company
30th Dec 20097:00 amRNSIEX Notice
22nd Dec 20099:50 amRNSIssue of Equity
17th Dec 20097:00 amRNSItalian Farm-in Agreement
7th Dec 20097:00 amRNSAlgerian Drilling Update AT-2
17th Nov 20097:00 amRNSAlgerian Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.