Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

10 Oct 2011 07:00

RNS Number : 8397P
Petroceltic International PLC
10 October 2011
 



 

Petroceltic International plc

Algeria Operational Update

AT-8 Produces flow rate of 38.6 mmscf/d

Condensate production of over 1,100 barrels per day

 

Petroceltic International plc ("Petroceltic" or "the Company"),announces that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d. In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

 

Following the pre-fracture stimulation results announced on 3rd October 2011, the upper Ordovician interval of the AT-8 well was successfully fracture stimulated. The well has subsequently produced 38.6 mmscf/d with 1,181 barrels per day of condensate on a 96/64" choke and with a flowing well head pressure of 1,393 PSIG. Pre-fracture gas flow rates at AT-8 were 15.4 mmscf/d.

 

Testing of the upper interval will continue at other choke settings to gather additional reservoir performance and fluid data before down-hole pressure gauges are installed and the well suspended. The gauges will be left in the well for one month to record an extended pressure build-up survey, and will be recovered after the testing of the AT-7 well which is next in the rigless testing programme.

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the Ain Tsila field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

Petroceltic is an upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, The Company operates the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted that fracture stimulation has substantially enhanced the excellent flow results at AT-8. This flow rate has been constrained by testing facilities and we estimate that a potential rate in excess of 50 mmscf/d of gas is possible from this well in the production phase. These results exceed the very high flow rates reached in the 2009 AT-1 well tests and further confirm that high deliverability is achievable in this field. The gas flow rates achieved here will have a significant impact on the Field Development Plan which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with AT-7 well test results and the AT-9 well logging and testing scheduled before year end."

 

Ends

For further information, please contact:

 

Brian O’ Cathain / Tom Hickey, Petroceltic International
Tel: +353 (1) 421 8300
Philip Dennis/Rollo Crichton-Stuart, Pelham Bell Pottinger
Tel: +44 (20) 7861 3919
Joe Murray / Joe Heron, Murray Consultants
Tel: +353 (1) 4980300
Hugh McCutcheon / John Frain, Davy
Tel: +353 (1) 679 6363
 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet of gas per day

PSIG: Pounds per square inch (gauge)

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSIESUFFSELS
Date   Source Headline
23rd Jul 20087:00 amRNSAlgerian Exploration Licencin
7th Jul 20082:28 pmRNSHolding in Company
4th Jul 20087:00 amRNSIEX Notice
2nd Jul 20087:00 amRNSItalian Permit Award
1st Jul 20084:06 pmRNSHolding(s) in Company
30th Jun 20087:00 amRNSFinal Results
30th Jun 20087:00 amRNSPlacing and Strategic Allianc
12th Jun 20089:28 amRNSChange of Registered Address
28th May 20084:41 pmRNSSecond Price Monitoring Extn
28th May 20084:35 pmRNSPrice Monitoring Extension
14th May 20087:00 amRNSOperational Update
18th Mar 20082:19 pmRNSHolding(s) in Company
12th Feb 20082:20 pmRNSHolding(s) in Company
8th Jan 20084:35 pmRNSPrice Monitoring Extension
8th Jan 20087:00 amRNSOperational Update
5th Dec 20079:47 amRNSHolding(s) in Company
3rd Dec 20074:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20074:35 pmRNSPrice Monitoring Extension
12th Nov 200710:22 amRNSHolding(s) in Company
5th Nov 20077:01 amRNSDirector/PDMR Shareholding
15th Oct 20078:28 amRNSItalian Licence Acquisition
2nd Oct 20073:24 pmRNSHolding(s) in Company
26th Sep 20077:02 amRNSInterim Results and Update
6th Sep 20077:01 amRNSItaly Update
20th Aug 20072:22 pmRNSHolding(s) in Company
17th Aug 20078:52 amRNSAIM Rule 26
13th Aug 200712:42 pmRNSHolding(s) in Company
1st Aug 200710:38 amRNSHolding(s) in Company
31st Jul 20072:36 pmRNSResult of AGM
16th Jul 20075:08 pmRNSDocument Availability
26th Jun 20075:00 pmRNSAnnual Report and Accounts
25th Jun 20073:48 pmRNSDirector/PDMR Shareholding
21st Jun 20077:01 amRNSAppt of Non-Exec Director
21st Jun 20077:00 amRNSFinal Results
8th May 200710:00 amRNSFurther re Director's Appt
24th Apr 20077:02 amRNSDirectorate Change
16th Apr 20077:01 amRNSItalian Operations Update
11th Apr 20073:29 pmRNSHolding(s) in Company
21st Mar 20071:40 pmRNSHolding(s) in Company
14th Mar 20072:57 pmRNSHolding(s) in Company
6th Feb 20073:50 pmRNSHolding(s) in Company
30th Jan 20079:20 amRNSHolding(s) in Company
29th Jan 20077:01 amRNSOperational Update
19th Jan 20073:34 pmRNSHolding(s) in Company
18th Jan 20072:09 pmRNSHolding(s) in Company
12th Jan 20072:41 pmRNSHolding in Company
18th Dec 20063:04 pmRNSHolding(s) in Company
18th Dec 20067:02 amRNSDrilling Update
11th Dec 20064:33 pmRNSHolding(s) in Company
6th Dec 20067:01 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.