REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 31.35
Bid: 31.25
Ask: 32.45
Change: -1.30 (-3.98%)
Spread: 1.20 (3.84%)
Open: 33.00
High: 33.45
Low: 31.20
Prev. Close: 32.65
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

9 Feb 2018 07:00

RNS Number : 3904E
Pantheon Resources PLC
09 February 2018
 

9 February 2018

 

Pantheon Resources plc

 

Operational update

 

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a working interest in several conventional project areas in Tyler and Polk Counties, onshore East Texas, is pleased to provide the following operational update:

 

 

VOBM#4, Tyler County, 75% working interest

Throughout January 2018 extensive analytical work has been undertaken correlating the Wilcox in VOBM#4 to the analogous Jazz Field in southern Tyler County. In that field, operated by Unit Petroleum Company, wells were initially drilled vertically but over recent times the drilling method has very successfully evolved into a horizontal approach with multiple stage fracture stimulations ("fracs"). The Jazz field is some 2,000 feet deeper and in a higher pressure and temperature setting than in VOBM#4 so correlation and analysis has been an involved process. The operator plans to perforate, test and if warranted, frac the Uppermost Wilcox zone in VOBM#4 which is viewed to be the highest profile target. The VOBM#4 well is scheduled to commence testing operations this coming weekend. If tested results merit a frac, for logistical reasons operations will ideally be synchronised with the contemplated frac of VOBM#1. Pantheon will report results at the conclusion of testing operations.

 

 

VOBM#1, Polk County, 55.1% working interest

As reported in early January 2018, production volumes from our Polk County gas processing facility had unexpectedly declined to c.3,000 mcfpd, which was below our anticipated rates for the VOBM#1 and VOBM#3 wells. An independent expert reservoir consultant was contracted to undertake a comprehensive review in order to diagnose the underlying cause of the production decline and to recommend appropriate remedial action where relevant. This review has included numerous diagnostic wellbore operations, mainly focused on the VOBM#1 well, as well as detailed analysis of relevant wells in the Double A Wells field. During this time, there has been minimal production into the gas plant while diagnostic operations were in progress.

 

During the diagnostic procedures, obstructions were encountered at the top of the perforations in VOBM#1, which is believed to be as a result of the long time period the well was shut in, along with movable formation sand. A xylene/acid treatment was performed and, after further remedial treatment, a wire line bailer was used which recovered considerable amounts of formation sand. The well was again tested into the sales line at rates in excess of 6,800 mcfpd and c.250 bopd on a 22/64th choke; a material improvement. The VOBM#1 well has now been shut in to avoid additional blockage and has scheduled a fracture stimulation procedure similar to those successfully performed in the adjacent Double A Wells Field to bypass reservoir skin damage and preclude further sanding issues.

 

 

Implications of the blockage in VOBM#1

It is clear that the VOBM#1 wellbore has been impacted by blockages/skin damage, most likely compounded by the long period that the well has been shut in. Our limited actions to remove the blockage to date have significantly improved flow rates and experience in the Double A Wells field suggests that fracture stimulation treatment offers the potential for material improvement. In fact, as a result of this analysis, there is a strong case to suggest that all future wells would benefit from proactive fracking. The Company believes that the same issue may have affected the VOBM#2H and VOBM#3 wells, given they were drilled with the same combination of drill bit, oil based drilling mud, and have been shut in for extended periods.

 

 

VOBM#2H, Polk County, 55.1% working interest

The VOBM#2H well was turned to the sales line for only a few hours before line freezing occurred. The rates observed were c.300 mcfpd with modest oil production. A line heater was ordered and will be installed to permit full production into the sales line. Prior to freezeoff, the wells shut-in pressure was anomalously low compared to the VOBM#1 and #3 wells; however, over the past 10 days the shut-in tubing pressure has increased by over 1,200 psi indicating that "skin damage" has also affected this well's tested performance. The increased pressure buildup may suggest a down hole bypass of that condition. This is both significant and welcome news.

 

 

VOBM#5, Polk County, 75% working interest

Operations on VOBM#5 are ongoing and on schedule. Results are expected to be announced by the end of February 2018 or at the conclusion of testing operations should they be warranted.

 

 

Tyler County Gas Processing Update

Pantheon and the operator are in present negotiations with the operators of two regional gas processing plants in Tyler County for the transportation and processing of natural gas from the presently shut-in VOS#1 discovery well, and potentially future Tyler County production wells. There can be no guarantee that an agreement on acceptable terms will be reached.

 

Jay Cheatham, CEO, said:

"It has been a very busy period for Pantheon and the operator Vision. Operations are progressing well on VOBM#5 and preparations to begin testing VOBM#4 are underway and we look forward to announcing the results of these once complete. As well as the in-depth analysis on VOBM#1 and the design for remedial action to get the well back on stream, we have also been busy with ongoing lease renewals and dealing with the operators of two regional gas processing plants in Tyler County. I am also encouraged by the increase in shut-in tubing pressure at our problematic VOBM#2H well. We have always believed the VOBM#2H location to offer tremendous potential even though flow rates will be limited by the compromised wellbore. Nevertheless, this is a positive sign for future production from this well which we believe has the potential to flow at lower rates, but for a very long period of time.

"The decline in production in Polk County in January warranted a concerted scientific approach to analyse, understand and diagnose the appropriate remediation technique. Analysis to date suggests that the cause appears to be wellbore specific factors, most likely as a result of the wells having been shut in for extended periods, and does not suggest a downgrade in the potential of our acreage."

 

 

 

-Ends -

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5361

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

 

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

James Styles

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com 

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

 

The information contained within this RNS is considered to be inside information prior to its release.

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

 

Glossary

mcfpd: thousand cubic feet per day

P50 denotes a best estimate scenario of Prospective Resources

bopd: barrels of oil per day

psi: pounds per square inch

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDDXGDDRBGBGII
Date   Source Headline
20th Mar 20237:00 amRNSAGM webinar & corporate update
16th Mar 20232:08 pmRNSUpcoming Webinar – Registration Details
13th Mar 20233:33 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
9th Mar 202312:17 pmRNSAppointment of Independent Non-Executive Director
6th Mar 20237:00 amRNSOperational and corporate update
21st Feb 20236:06 pmRNSAnnual General Meeting & Webinar
21st Feb 20237:00 amRNSOperational update, PDMR & Issue of Equity
16th Feb 20237:00 amRNSAlkaid #2 update – well cleanout completed
10th Feb 20237:00 amRNSAlkaid #2 update
24th Jan 20231:49 pmRNSAlkaid #2 webinar and update
23rd Jan 20237:00 amRNSUpcoming Webinar - Registration Details
13th Jan 202311:03 amRNSConfirmation of Upcoming Webinar
3rd Jan 20237:00 amRNSInvestor Q&A
30th Dec 20227:00 amRNSOperational update
30th Dec 20227:00 amRNSFinal Results for the Year Ended 30 June 2022
14th Dec 20225:00 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
8th Dec 20227:00 amRNSReservoir modelling report from Schlumberger
18th Nov 20221:22 pmRNSBlock Listing Six Monthly Return
10th Nov 20227:00 amRNSAcquisition of Key Leases & Operational Update
25th Oct 20227:00 amRNSOperational Update, Alkaid #2 Well
3rd Oct 20224:22 pmRNSTotal Voting Rights
26th Sep 20227:00 amRNSOperational Update, Alkaid #2 Well
20th Sep 20227:00 amRNSDirector/PDMR Notification
13th Sep 20221:21 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
7th Sep 20222:30 pmRNSPantheon Graduates to the OTCQX Best Market
6th Sep 20227:00 amRNSOperational and Corporate Update
23rd Aug 20222:36 pmRNSReplacement Theta West #1 – Independent VAS Report
23rd Aug 20227:00 amRNSTheta West #1 Well – Independent Expert VAS Report
18th Aug 20227:00 amRNSOperational Update, Alkaid #2 Well
29th Jul 20227:00 amRNSOperational Update, Alkaid #2 Well
7th Jul 20227:00 amRNSSpudding of Alkaid #2 Well
28th Jun 20227:00 amRNSTR-1: Notification of major holdings
14th Jun 202210:34 amRNSQuarterly Repayment of Unsecured Convertible Bonds
31st May 20221:10 pmRNSTotal Voting Rights
18th May 20229:53 amRNSBlock Listing Application to AIM
16th May 20227:00 amRNSRig Contract Executed & Investor Presentation
4th May 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
25th Apr 20227:00 amRNSResource Upgrade
20th Apr 20227:00 amRNSUpcoming Webinar – Registration Details
6th Apr 202210:01 amRNSConfirmation of Upcoming Webinar
5th Apr 20225:58 pmRNSTR-1: Notification of major holdings
31st Mar 20227:00 amRNSInterim Results for Six Months Ended 31/12/21
24th Mar 20227:00 amRNSTheta West #1 Testing Update
15th Mar 20227:00 amRNSIssue of Equity
9th Mar 20229:35 amRNSQuarterly Repayment of Unsecured Convertible Bonds
4th Mar 20222:14 pmRNSConversion of Shares
4th Mar 20227:00 amRNSOperations Update
21st Feb 20227:00 amRNSOperational Update
18th Feb 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
15th Feb 20227:00 amRNSTheta West #1 Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.