We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 32.45
Bid: 32.30
Ask: 32.55
Change: -0.60 (-1.82%)
Spread: 0.25 (0.774%)
Open: 34.00
High: 34.00
Low: 31.50
Prev. Close: 33.05
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational update

30 Dec 2022 07:00

RNS Number : 2623L
Pantheon Resources PLC
30 December 2022
 

30 December, 2022

Pantheon Resources Plc

Operational update

Pantheon Resources plc ("Pantheon" or the "Company" or the "Group"), the AIM-quoted oil company with 100% working interest in approximately 153,000 acres located adjacent to transportation and pipeline infrastructure on State Land on the Alaska North Slope, is pleased to provide the following operational update on the Alkaid #2 well.

Operational update - Alkaid #2

As previously announced, the lateral section of the Alkaid #2 wellbore is partially blocked with approximately 1,000 feet of frac sand which (i) has restricted tested flow rates due to the lack of contribution from the blocked section, and (ii) has necessitated a more conservative testing protocol in order to not exacerbate the blockage, which has resulted in a slower 'cleanup phase'.

Encouragingly, despite the blockage, the well is flowing naturally into Pantheon's recently commissioned permanent production facilities located on the Dalton Highway at a rate of over 500 barrels per day ("bpd") of hydrocarbon liquids which includes oil, condensate and natural gas liquids ("NGL's"), as well as significant natural gas, from an estimated 4,000 ft of lateral. Importantly, it is estimated that the well is still less than 40% of the way through cleanup phase, so potential exists for these rates to further improve. Crude oil is processed on location and oil sales are underway. To date over 7,000 barrels of 38-41 degree API oil has been trucked and sold into the Trans Alaska Pipeline System. This oil is lighter than existing North Slope oil production and hence a welcome addition to the production stream.

A proportion of the gas production is used to generate power across all the facilities that are now electrically powered and operational, reducing flaring and providing cost savings to operations at this location.

Production

At this early clean up stage, Alkaid #2 is delivering hydrocarbon liquid rates near expectations over the 4,000 ft unblocked section, with gas rates well above original prognosis. Sustained daily production over more than the last 30 days has averaged over 500 barrels per day of hydrocarbon liquids, of which circa 200 bpd of crude oil and over 300 bpd being condensate and NGLs, all of which can be sold either by blending into the pipeline or trucking to an Alaskan refinery. Gas rates are above 2.5 mmcfd which is higher than originally anticipated, however this is not believed to be from a gas cap but coming out of solution near the well bore. This is not considered a long term problem as excess gas could be reinjected into the reservoir for pressure maintenance. This combined hydrocarbon deliverability to date confirms the forecasted reservoir properties and highlights the potential deliverability of the Alkaid reservoir. The Company is confident there is upside above these rates as it is apparent that only a portion of the completed wellbore is contributing to the production stream; and it is estimated that the well has produced to date less than 40% of the volume of frac fluid used in the stimulations.

Sand

As previously announced, the flow rate is restricted by the accumulation of sand in the horizontal portion of the well bore also slows down well cleanup. This is not uncommon in long horizontal wells that have been treated with multi stage fracture stimulations. With the correct equipment, removing the sand and cleaning the well is a simple operation which is currently planned for January. The sand blockage in the well bore was identified early in the production test, however no winterized workover rig was available which prohibited the removal of the tubing and a proper clean out at that time. Instead, a coiled tubing unit ("CTU") was used to conduct a through-tubing cleanout, but was unable to reach the full well depth and hence was partially successful with more than 1,000 ft remaining blocked and untouched by the CTU clean out. A rig is available in January to clean out the entire well bore and is expected to open the entirety of the lateral allowing the full potential of the well to be revealed and at the same time accelerating the clean up phase.

In advance of the clean out the Company plans to shut in and perform reservoir diagnostics, a normal oilfield practice, to gather additional data.

Jay Cheatham, CEO, said: "The Alkaid #2 well is delivering a total hydrocarbon liquid mixture exceeding 500 bpd from what we believe is from only c.4,000 feet of lateral. The liquid mixture includes high quality oil with associated condensates and NGL that are saleable through TAPS. The total hydrocarbon production rates confirm we have tapped into a significant hydrocarbon system. To have this level of production at this stage in the "clean up" phase of production testing remains positive. The current reservoir performance is compromised by the sand blockage and we will not have a true indication of reservoir performance until the entire well bore is clean. We are deliberately using a conservative approach in flow testing of not 'pulling on the reservoir' too hard, allowing the natural healing of the fractures to minimise future sand flow. Overall, we're very encouraged with the preliminary results of the production test and the fact that we have permanent facilities for treating and selling our oil as well as utilizing our gas to power our operations on location. Despite this encouragement however, we remind shareholders as we always do, that a definitive assessment of the well cannot be made until flow testing operations have concluded and we are still too early in the process.

"We expect flow rates after the clean out to improve. The location of Alkaid, immediately adjacent to the Dalton Highway, again highlights the significant advantage we have to other operators on the North Slope in expediting our oil developments. These initial positive testing results have increased our confidence in pursuing an Alkaid #3 well, subject to funding, which would be a high impact appraisal well to test the Shelf Margin Deltaic, the reservoir target immediately above the discovered oil at Alkaid #1 and #2. A success at Alkaid #3 would be a commercially impactful well with material resource implications and would also leverage off the established production facilities for important near term cashflow and it could be drilled outside of the traditional winter drilling season."

 

Glossary

Bpd

Barrells per day

Bopd

Barrells of oil per day

Mmcfd

Ft

Millions of cubic feet per day

Feet

 

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Robert Rosenthal, a qualified Petroleum Geologist, who has over 40 years' relevant experience within the sector.

The information contained within this Announcement is deemed by Pantheon Resources PLC to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of UK law by virtue of the European Union (Withdrawal) Act 2018 ("MAR").

Cautionary Statement: Certain statements and estimates contained in this announcement carry an associated risk of accuracy as such statements and estimates are based upon information available at the time of making such statements. Actual results could differ materially from expectations set out in such statements. Among other factors, this could be as a result of changes in economic, market, geological and political factors, the success of future drilling and geological success, the risk of future drilling changes in the regulatory environment and other government actions, fluctuations in the price of oil and exchange rates, and business and operational risk management.

-Ends-

 

 

Further information:

 

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5361

Justin Hondris, Director, Finance and Corporate Development

 

Canaccord Genuity Limited (Nominated Adviser and broker)

Henry Fitzgerald-O'Connor, James Asensio, Gordon Hamilton

+44 20 7523 8000

 

BlytheRay

Tim Blythe, Megan Ray, Matthew Bowld

+44 20 7138 3204

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas company focused on several large projects located on the North Slope of Alaska ("ANS"), onshore USA where it has a 100% working interest in 153,000 highly prospective acres with potential for multi billion barrels of oil recoverable. A major differentiator to other ANS projects is its close proximity to transport and pipeline infrastructure which offers a significant competitive advantage to Pantheon, allowing for materially lower capital costs and much quicker development times. The Group's stated objective is to create material value for its stakeholders through oil exploration, appraisal and development activities in high impact, highly prospective conventional assets, in the USA; a highly established region for energy production with infrastructure, skilled personnel and low sovereign risk. All operations are onshore USA, with drilling costs materially below that of offshore wells.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGGBDDRXXDGDG
Date   Source Headline
1st May 20247:00 amRNSIndependent Expert Report by LKA on Alkaid Horizon
24th Apr 20247:00 amRNSTR-1: Notification of major holdings
10th Apr 20244:53 pmRNSWebinar and update
9th Apr 20247:00 amRNSKodiak resource upgraded to 1.2 billion barrels
2nd Apr 20244:30 pmRNSDirector/PDMR Notification
28th Mar 20247:05 amRNSProgress on Funding and Development Planning
21st Mar 202411:51 amRNSTR-1: Notification of major holdings
18th Mar 20247:00 amRNSUnaudited Interim Results
14th Mar 20247:00 amRNSQuarterly Repayment of Unsecured Convertible Bonds
5th Mar 20245:05 pmRNSResponse to Share Price Volatility
2nd Feb 20247:00 amRNSTR-1: Notification of major holdings
1st Feb 20247:00 amRNSDirector/PDMR notification
24th Jan 20243:15 pmRNSResult of AGM & Investor Presentation Details
23rd Jan 20247:00 amRNSAnnual General Meeting
2nd Jan 20247:00 amRNSTR-1: Notification of major holdings
19th Dec 20237:00 amRNSFinal Results for the Year Ended 30 June 2023
14th Dec 20237:04 amRNSSuccessful Acquisition of Leases
12th Dec 20237:00 amRNSAppointment of Independent Non-Executive Director
21st Nov 20234:36 pmRNSStrategy Update
15th Nov 20231:54 pmRNSInvestor Presentation via Investor Meet Company
14th Nov 202311:56 amRNSBond Payment, Placement & Corporate Update
19th Oct 20237:00 amRNSValidation of frac design and fluid sampling
18th Oct 20237:00 amRNSPantheon Presenting at OTC Oil and Gas Conference
4th Oct 20237:00 amRNSReplacement TR-1: Notification of major holdings
3rd Oct 20234:02 pmRNSTR-1: Notification of major holdings
27th Sep 20237:00 amRNSCommencement of Operations - Re-entry of Alkaid-2
14th Sep 20233:34 pmRNSWebinar and update
8th Sep 20238:20 amRNSInvestor Presentation Webinar
7th Sep 20237:00 amRNSPrivate Placement
30th Aug 20237:00 amRNSDirector/PDMR Notification
29th Aug 20237:00 amRNSExpert Report Confirms Estimate for Kodiak Field
28th Jul 20237:57 amRNSReplacement Operational Update
28th Jul 20237:00 amRNSOperational Update
14th Jul 20239:30 amRNSInvestor Presentation via Investor Meet Company
10th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
3rd Jul 20238:53 amRNSAppointment of Independent Non-Executive Director
28th Jun 20234:58 pmRNSWebinar and Strategy Update
26th Jun 202312:54 pmRNSUpcoming Webinar - Registration Details
15th Jun 20233:50 pmRNSIssue of Equity and Total Voting Rights
8th Jun 20237:00 amRNSAppointment of Executive Chairman
1st Jun 20237:00 amRNSLease Award
23rd May 20234:32 pmRNSUpdate on Fundraise
18th May 20235:40 pmRNSBlock Listing Six Monthly return
17th May 20237:00 amRNSResult of Capital Raise
16th May 20235:07 pmRNSRetail Offer via PrimaryBid
16th May 20234:59 pmRNSProposed Placing and Subscription
21st Apr 20237:00 amRNSOperational and corporate update
31st Mar 20237:00 amRNSUnaudited Interim Results
22nd Mar 20235:09 pmRNSResult of AGM
20th Mar 20234:45 pmRNSAGM update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.