Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
13.99    0.47 (3.48%)
Bid:
13.89
Ask:
14.25
Spread: 0.36 (2.592%)
Market Cap: £203.96m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

5 Sep 2016 07:00

RNS Number : 8926I
Pantheon Resources PLC
05 September 2016
 

 

5 September 2016

 

Pantheon Resources plc

 

VOBM#2 well results and update on VOS#1 well

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a working interest (of 50%-58%) in several conventional projects in Tyler and Polk Counties, onshore East Texas, announces the cessation of drilling operations at the VOBM#2 well and provides an update on the fracture stimulation remediation process at VOS#1 well.

 

Update on VOBM#2

 

Drilling operations at the VOBM#2 have temporarily concluded, after reaching a measured depth of 16,450 feet in the targeted conventional Eagle Ford sandstone. Although flow testing was not possible, the well has encountered significant hydrocarbons in the objective horizon with natural gas being flared for several days, confirming the presence of a productive reservoir consistent with pre drill expectations.

 

Drilling of the horizontal section of the well was delayed by a series of equipment failures, causing the operator to replace contractors a number of times. The Eagle Ford sandstone when drilled horizontally apparently presents abnormally abrasive characteristics, often reducing the rate of penetration to less than 2 foot per hour, regularly destroying diamond PDC bits after but a few hours of service. After consultation with service providers, the operator and Pantheon have decided on cost benefit grounds to temporarily suspend drilling operations in favour of plugging back and re-entering at a later time and completing the well vertically as soon as the rig has completed VOBM#3 and the subsequent Tyler County centre basin test. Gross costs for the well are estimated to be between $5.6m and $6m.

 

Both the prospectivity and potential of this prospect are undiminished. The company believes that the significant hydrocarbons encountered whilst drilling the target horizon have further de-risked the prospect, and remain confident that the well will be a commercial discovery when drilled vertically.

 

Update on VOS#1

The planned fracture stimulation treatment ("frac") on VOS#1 has been completed. The results of an eight-day flow test are currently being analysed. The frac was designed to penetrate a 25-foot section of the Eagle Ford sandstone formation and 20 feet of the shallower Austin Chalk. The well flowed through a 14/64th inch choke at a sustained rate of c.920 barrels of oil equivalent per day, comprising 5,500 mcf per day natural gas with measurable amounts of condensate. Subsequent pressure buildup readings as the choke sizes were reduced offered convincing evidence that the frac procedure was effective. The well has been shut-in pending the results of the forthcoming basin-centre test to determine optimal pipeline and gas processing options. It will take 3-6 months of production before a more accurate assessment of well flow volumes and ultimate EUR can be determined.

  

Future drilling plans

 

The rig which drilled VOBM#2 is now moving to drill the permitted VOBM#3 development well. The pad for the VOBM#3 has already been constructed and is designed to accommodate gas processing facilities. This well will be drilled vertically at an estimated total gross cost of $3.75m. Once VOBM#3 has been completed, the rig will move to complete the Tyler County centre basin test and then return to re-enter and complete VOBM#2 vertically. With the build out of pipeline and gas processing facilities taking place while the rig is in Tyler County, production from the Polk County development will then begin.

 

 

Jay Cheatham, the CEO of Pantheon, said:

"We have experienced a long list of individual challenges in the drilling of the VOBM#2 well, which has delayed the announcement of results. The decision to try horizontal drilling with our second Polk County well, which we hoped would enhance per-well recovery rates, has not worked out as we expected and that technique will not be repeated. This was the first horizontal well ever drilled into this formation regionally and the abrasiveness of the hard sandstone was unexpected. We know that the wells can be drilled quickly and cost effectively vertically, as evidenced in our VOBM1 success nearby, so it makes obvious sense to learn from experience and revert to vertical drilling.

"The frac on VOS#1 has meanwhile confirmed the well as a solid commercial discovery, despite the variable permeability of the reservoir and the blockage encountered in initial drilling. Whilst maximum flow rates did not increase significantly post frac, analysis of the flow test data to date suggests that those rates should be sustainable and increase ultimate reserve recovery.

"The good news is that both the VOS#1 and VOBM#2 wells have encountered significant hydrocarbons in their objective horizons, exactly where we expected to find them, confirming the experience of all three of our initial wells. In all three cases the results are consistent with our original estimates of the likely recoverable Eagle Ford reserves and I expect all three wells to be commercial producers.

"Our priority now is to press on with the next two wells in our programme as quickly as possible, so that we can complete the delineation of what we have found in both Tyler and Polk County and move towards production at the earliest opportunity, optimising recovery rates on a field-wide basis".

 

 

-Ends-

 

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5359

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

 

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

Shannon Brushe

 

James Styles

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com 

The information contained within this RNS is considered to be inside information prior to its release.

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGGDCXDGBGLU
Date   Source Headline
13th Nov 20079:29 amRNSHolding(s) in Company
2nd Nov 20074:23 pmRNSHolding(s) in Company
2nd Nov 20072:50 pmRNSOption Grant
25th Oct 200712:12 pmRNSHolding(s) in Company
25th Oct 200712:09 pmRNSHolding(s) in Company
25th Oct 200712:08 pmRNSHolding(s) in Company
19th Oct 20072:42 pmRNSHolding(s) in Company
16th Oct 20077:01 amRNSSpudding of Nottoway Prospect
16th Oct 20077:00 amRNSProduction Update
4th Oct 20077:01 amRNSProduction Update - Sept 2007
19th Sep 20077:01 amRNSFirst Production-Dunn Deep #2
17th Sep 20072:38 pmRNSHolding(s) in Company
17th Sep 20072:26 pmRNSProduction Update-August 2007
14th Sep 20075:20 pmRNSHolding(s) in Company
11th Sep 200710:43 amRNSFirst Production from Wilson
7th Sep 20077:01 amRNSDunn Deep Update
3rd Sep 20073:00 pmRNSHolding(s) in Company
3rd Sep 20077:01 amRNSAppointment of Director
15th Aug 20077:00 amRNSDrilling Programme Update
7th Aug 20077:01 amRNSAddition to Portfolio
6th Aug 20077:59 amRNSProduction Update - July 2007
30th Jul 20074:24 pmRNSHolding(s) in Company
25th Jul 20074:08 pmRNSHolding(s) in Company
17th Jul 20077:00 amRNSAddition to portfolio
10th Jul 20074:21 pmRNSHolding(s) in Company
5th Jul 200711:45 amRNSHolding(s) in Company
5th Jul 20077:46 amRNSProduction Update - June 2007
25th Jun 20072:58 pmRNSProduction Update-June 2007
25th Jun 20077:36 amRNSProduction Update - June 2007
19th Jun 200711:45 amRNSHolding(s) in Company
18th Jun 20078:32 amRNSWilson Update
8th Jun 20073:13 pmRNSProduction Update - May 2007
6th Jun 20072:57 pmRNSHolding(s) in Company
4th Jun 20078:12 amRNSWilson Test Result
29th May 20079:40 amRNSWilson Drilling Update
22nd May 20078:33 amRNSWilson Drilling Update
21st May 20077:30 amRNSAddition to portfolio
16th May 20077:49 amRNSDrilling Update on Wilson
14th May 20074:03 pmRNSHolding(s) in Company
10th May 20078:47 amRNSProduction Update- April 2007
3rd May 200710:50 amRNSHolding(s) in Company
2nd May 20078:19 amRNSHolding(s) in Company
27th Apr 20072:03 pmRNSHolding(s) in Company
20th Apr 20077:01 amRNSWilson Drilling Update
11th Apr 20077:01 amRNSProduction Update-March 2007
10th Apr 20077:43 amRNSNatural Gas Encountered
5th Apr 20077:01 amRNSDrilling Report
30th Mar 20076:06 pmRNSInterim Results
29th Mar 200710:55 amRNSProject Wharton Spudded
23rd Mar 20077:45 amRNSPadre Island Leases Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.