Operational Update

5 Sep 2016 07:00

RNS Number : 8926I
Pantheon Resources PLC
05 September 2016
 

 

5 September 2016

 

Pantheon Resources plc

 

VOBM#2 well results and update on VOS#1 well

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a working interest (of 50%-58%) in several conventional projects in Tyler and Polk Counties, onshore East Texas, announces the cessation of drilling operations at the VOBM#2 well and provides an update on the fracture stimulation remediation process at VOS#1 well.

 

Update on VOBM#2

 

Drilling operations at the VOBM#2 have temporarily concluded, after reaching a measured depth of 16,450 feet in the targeted conventional Eagle Ford sandstone. Although flow testing was not possible, the well has encountered significant hydrocarbons in the objective horizon with natural gas being flared for several days, confirming the presence of a productive reservoir consistent with pre drill expectations.

 

Drilling of the horizontal section of the well was delayed by a series of equipment failures, causing the operator to replace contractors a number of times. The Eagle Ford sandstone when drilled horizontally apparently presents abnormally abrasive characteristics, often reducing the rate of penetration to less than 2 foot per hour, regularly destroying diamond PDC bits after but a few hours of service. After consultation with service providers, the operator and Pantheon have decided on cost benefit grounds to temporarily suspend drilling operations in favour of plugging back and re-entering at a later time and completing the well vertically as soon as the rig has completed VOBM#3 and the subsequent Tyler County centre basin test. Gross costs for the well are estimated to be between $5.6m and $6m.

 

Both the prospectivity and potential of this prospect are undiminished. The company believes that the significant hydrocarbons encountered whilst drilling the target horizon have further de-risked the prospect, and remain confident that the well will be a commercial discovery when drilled vertically.

 

Update on VOS#1

The planned fracture stimulation treatment ("frac") on VOS#1 has been completed. The results of an eight-day flow test are currently being analysed. The frac was designed to penetrate a 25-foot section of the Eagle Ford sandstone formation and 20 feet of the shallower Austin Chalk. The well flowed through a 14/64th inch choke at a sustained rate of c.920 barrels of oil equivalent per day, comprising 5,500 mcf per day natural gas with measurable amounts of condensate. Subsequent pressure buildup readings as the choke sizes were reduced offered convincing evidence that the frac procedure was effective. The well has been shut-in pending the results of the forthcoming basin-centre test to determine optimal pipeline and gas processing options. It will take 3-6 months of production before a more accurate assessment of well flow volumes and ultimate EUR can be determined.

  

Future drilling plans

 

The rig which drilled VOBM#2 is now moving to drill the permitted VOBM#3 development well. The pad for the VOBM#3 has already been constructed and is designed to accommodate gas processing facilities. This well will be drilled vertically at an estimated total gross cost of $3.75m. Once VOBM#3 has been completed, the rig will move to complete the Tyler County centre basin test and then return to re-enter and complete VOBM#2 vertically. With the build out of pipeline and gas processing facilities taking place while the rig is in Tyler County, production from the Polk County development will then begin.

 

 

Jay Cheatham, the CEO of Pantheon, said:

"We have experienced a long list of individual challenges in the drilling of the VOBM#2 well, which has delayed the announcement of results. The decision to try horizontal drilling with our second Polk County well, which we hoped would enhance per-well recovery rates, has not worked out as we expected and that technique will not be repeated. This was the first horizontal well ever drilled into this formation regionally and the abrasiveness of the hard sandstone was unexpected. We know that the wells can be drilled quickly and cost effectively vertically, as evidenced in our VOBM1 success nearby, so it makes obvious sense to learn from experience and revert to vertical drilling.

"The frac on VOS#1 has meanwhile confirmed the well as a solid commercial discovery, despite the variable permeability of the reservoir and the blockage encountered in initial drilling. Whilst maximum flow rates did not increase significantly post frac, analysis of the flow test data to date suggests that those rates should be sustainable and increase ultimate reserve recovery.

"The good news is that both the VOS#1 and VOBM#2 wells have encountered significant hydrocarbons in their objective horizons, exactly where we expected to find them, confirming the experience of all three of our initial wells. In all three cases the results are consistent with our original estimates of the likely recoverable Eagle Ford reserves and I expect all three wells to be commercial producers.

"Our priority now is to press on with the next two wells in our programme as quickly as possible, so that we can complete the delineation of what we have found in both Tyler and Polk County and move towards production at the earliest opportunity, optimising recovery rates on a field-wide basis".

 

 

-Ends-

 

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5359

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

 

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

Shannon Brushe

 

James Styles

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com 

The information contained within this RNS is considered to be inside information prior to its release.

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGGDCXDGBGLU
Date   Source Headline
8th Oct 20157:00 amRNSCommencement of testing operations
9th Sep 20157:00 amRNSDrilling Update
28th Jul 20157:00 amRNSSpudding of VOBM#1 well
16th Jul 20157:00 amRNSDrill Site and Roadworks Complete
3rd Jun 20151:32 pmRNSHolding(s) in Company
1st Jun 20157:00 amRNSUpdated Corporate Presentation
7th May 20157:00 amRNSDrilling Rig Contracted
30th Mar 20157:00 amRNSHalf Yearly Report
25th Mar 20157:07 amRNSOperational Update
2nd Mar 20158:58 amRNSChange of Nominated Adviser
29th Dec 201412:17 pmRNSResult of AGM
15th Dec 20143:45 pmRNSHolding(s) in Company
15th Dec 20147:00 amRNSDirector/PDMR Shareholding
4th Dec 20143:00 pmRNSNotice of AGM
2nd Dec 20147:30 amRNSFinal Results
19th Nov 20147:00 amRNSCompany Update
3rd Nov 20148:58 amRNSHolding(s) in Company
27th Oct 20145:55 pmRNSHolding(s) in Company
23rd Oct 20144:06 pmRNSHolding(s) in Company
22nd Oct 20145:10 pmRNSHolding(s) in Company
21st Oct 20145:43 pmRNSHolding(s) in Company
21st Oct 20143:15 pmRNSTotal Voting Rights
16th Oct 201411:04 amRNSResult of General Meeting
10th Oct 201412:00 pmRNSSuccessful Acquisition of Key Leases
7th Oct 201412:45 pmRNSHolding(s) in Company
7th Oct 201412:30 pmRNSHolding(s) in Company
7th Oct 201411:15 amRNSHolding(s) in Company
6th Oct 20145:41 pmRNSHolding(s) in Company
2nd Oct 20143:25 pmRNSTotal Voting Rights
1st Oct 20141:21 pmRNSPosting of Circular
30th Sep 20149:45 amRNSIssue of Share Options
30th Sep 20147:03 amRNSPlacing of Shares & Revised Joint Venture
14th Apr 20147:00 amRNSDirector/PDMR Shareholding
31st Mar 20147:00 amRNSHalf Yearly Report
13th Dec 201311:53 amRNSResult of AGM
13th Dec 201310:00 amRNSAGM Statement
19th Nov 20136:11 pmRNSHolding(s) in Company
15th Nov 20137:00 amRNSFinal Results
2nd Sep 20133:07 pmRNSHolding(s) in Company
22nd Jul 20132:22 pmRNSTyler County Update
20th May 20132:53 pmRNSHolding(s) in Company
8th May 201312:41 pmRNSHolding(s) in Company
2nd May 201312:18 pmRNSHolding(s) in Company
27th Mar 20137:00 amRNSHalf Yearly Report
26th Mar 20132:30 pmRNSHolding(s) in Company
20th Feb 20132:26 pmRNSHolding(s) in Company
17th Dec 201211:22 amRNSHolding(s) in Company
14th Dec 20122:18 pmRNSResult of AGM
14th Dec 201210:00 amRNSAGM Statement
20th Nov 201212:09 pmRNSNotice of AGM and Presentation by JV Operator

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.