Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
155.00    7.50 (5.08%)
Bid:
150.00
Ask:
160.00
Spread: 10.00 (6.667%)
Market Cap: £13.58m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Obonga Project: Diamond Drilling Programme Update

Today 07:00

RNS Number : 8498H
Panther Metals PLC
11 June 2026
 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company number 009753V)

11 June 2026

Obonga Project: Diamond Drilling Programme Update

Awkward Conduit Target Hole Complete, Wishbone VMS Prospect Drilling Underway

Panther Metals PLC (LSE: PALM), the exploration company focused on mineral projects in Canada, is pleased to provide an update for the ongoing diamond drilling programme on the Obonga Project, located upon the Obonga Greenstone Belt, Ontario, Canada.

The first drill hole at the Awkward Conduit Target has completed successfully and drilling has now commenced at the Wishbone Prospect, the emerging and highly prospective base metal volcanogenic massive sulphide ("VMS") system.

Awkward Conduit Target

The first drill hole (BR26-AW-P1-1) has successfully completed to plan, attaining a vertical depth of 401m and intersecting the targeted intrusive. The drill core is currently being processed ahead of samples being submitted for laboratory analysis. Further information will be provided in due course.

Wishbone VMS Prospect

Drilling has commenced on the first of a series of planned diamond drill holes at the Wishbone VMS Prospect. Hole BR26-WBP1-1 is a planned 300m deep inclined hole designed to test the VMS mineralisation strike extension approximately 500m to the north of previous wide VMS intersections. At 5pm local time time the hole was at a downhole depth of 68m.

Based on the results of previous studies, Wishbone is interpreted to be a sub-seafloor VMS system. The current drill programme which is informed by the Company's magnetic previous drilling, geophysics survey data and three-dimensional inversion model (Figure 1) is designed to test for the expected temperature related copper and zinc metal depositional zonation.

Further updates will be provided as the work develops.

A video illustrating the results of the Magnetic Survey inversion modelling and the size and morphology of the Wishbone VMS Target and the relationship with highly anomalous copper in lake sediments is available to view on the Panther Metals PLC YouTube channel at https://youtube.com/shorts/POMgfQuSc44?feature=share1

Figure 1: Plan view of modelled Wishbone VMS Target showing magnetic inversion model, geological contacts and location of Panther diamond drillholes (based on magnetic inversion model shells).

Notes: Scale bar and north arrow in bottom left corner of figure. Coordinates stated in UTM Zone 16N NAD 83 datum. Image highlights the size of the modelled magnetic body at depth. Dark blue dots signify permitted drill pad locations. The figure is overlain by a semi-transparent surface rendering of the topographical map, from which the trace of the Wishbone Lake can be discerned (light blue). The green block model below the topography reflects the greenstone volcanic geology, the beige block model to the north is granitoid. The granitoid/volcanic contacts are interpreted to be faulted. A series of three concave fault/contacts are currently interpreted to dissect the magnetic inversion model. The down-hole traces of Panther's 2021 and 2022 drilling are shown in plan view. The working model is dynamic and will be updated as the 2026 drill programme progresses.

 

Wishbone VMS Target Background

The current Wishbone 2026 drill programme follows on from the 2025 drone magnetic survey work and the results of the 2022 drill programme to target multiple high priority electromagnetic ("EM") and magnetic geophysical anomalies prospective for volcanogenic massive sulphide ("VMS") hosted copper / base metal mineralisation. Panther's two hole 600m drilling programme in autumn 2021 had previously confirmed Wishbone as a VMS base metals target and the 2022 drilling sought to follow-up on the massive sulphide and zinc / copper intersections as well as to test further coincident magnetic and electromagnetic conductor geophysical anomalies identified by regional airborne surveys.

Historical drilling in the 1970s intersected massive stringer and disseminated sulphide 800m north of the Wishbone anomaly and drilling by BHP in the 1990s intersected massive stringer and disseminated sulphide 600m south of the anomaly.

BHP ranked the Wishbone anomaly a high priority for follow up in 1992, however no further work was completed prior to 2021. Airborne geophysics datasets compiled since that time have shown that the historical drilling failed to intersect the major anomalies.

Wishbone is situated in a similar geological environment to the nearby Sturgeon Lake VMS mining camp, on the Wabigoon Greenstone Belt, approximately 75km due west. The Sturgeon Lake VMS Camp is host to five historic zinc-copper-lead-silver producing mines, with a combined total production of: 19.8Mt @ 8.50% Zn, 1.06% Cu, 0.91% Pb & 119.7g/t Ag.

In 2021 Panther's two hole, 600m diamond drilling programme, intercepted multiple lenses of sulphide mineralisation including in drill hole BBR21_WB_001 a 27.3m wide intercept of massive sulphide mineralisation and in hole BBR21_WB_002 51m of sulphide-dominated mineralisation.

Wide massive sulphide and semi-massive sulphide mineralisation intersections were made in both drill holes:

WB001: Three wide sulphide intersections:

-  27.3m of massive sulphide from 106.2m ('Upper layer'), with fault at base;

-  2.5m of massive sulphide from 234.8m ('Mid layer'; and

-  1.4m of massive sulphide from 256.6m ('Lower layer')

WB002: Wide zoned sulphide intersection:

-  51m from 174m comprising a wide zone of sulphide dominated mineralisation, including:

-  17m from 180m of massive sulphide ('Upper zone') and

-  7m from 218m of semi-massive sulphide ('Lower zone')

In Panther's 2022 drill programme, a further three diamond drill holes intersected further massive and semi-massive sulphides, and a zone of zinc mineralisation:

Hole BBR22 WB-P1-2: Potentially commercial grades of zinc mineralisation:

-  3.6m @ 3.9% Zn from 120m, including

-  2m @ 6.8% Zn, 4.3 g/t Ag and anomalous 0.19% Cu from 120m, with

-  0.5m @ 11.65% Zn, 4.1 g/t Ag and anomalous 0.14% Cu from 120.2m.

Hole BBR22 WB-P2-1: Further wide zones of massive and semi-massive sulphide mineralisation intersected, interpreted to be related to the high temperature pyrrhotite dominant core of the VMS system:

-  22.4m of massive and semi-massive sulphide from 127m downhole.

Hole BBR22 WB-P3-1 :

-  3.8m of semi-massive sulphide from 163.2m downhole.

The Wishbone discovery was the first significant VMS-style mineralisation to be made on the entire Obonga Greenstone Belt. Given the geological tendency for VMS systems to cluster and repeat and given the presence of highly anomalous copper in lake and stream sediments nearby (see Figure 4).

An important characteristic of VMS deposits is that they typically display a zonation of metals within the massive sulphide body from Fe+Cu at the base to Zn+Fe±Pb±Ba at the top and margins, related to differing temperature and chemical conditions at mineral deposition. The major observed mineral component of the Wishbone massive sulphide mineralisation is pyrrhotite with less common pyrite and minor sphalerite and chalcopyrite in distinct zones.

The Wishbone assay result suite, including rare earth element ("REE") analyses, has yielded important geochemical information allowing the classification of the mineralisation, alteration ratios and the development of exploration vectors towards zones of potential economic interest. Wishbone has been classified as a bimodal type deposit, the same type as Canada's Kidd Creek (Ontario) and Noranda (Quebec) VMS deposits.

 

For further information, please contact:

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer:

+44 (0)1462 429 743

+44 (0)7971 957 685

 

Brokers:

Optiva Securities Limited

Christian Dennis

Mick McNamara

+44 (0)20 3137 1902

Hybridan LLP

Claire Louise Noyce

+44 (0)20 3764 2341

 

SI Capital Limited

Nick Emerson

+44 (0)1438 416 500

Obonga Project - Advancing a High-Impact VMS and Critical Minerals District

Panther Metals' Obonga Project in Ontario continues to demonstrate strong potential as a district-scale exploration opportunity targeting base and critical minerals. Since acquiring the Obonga Greenstone Belt in July 2021, the Company has advanced multiple high-priority targets including Wishbone, Awkward, Survey, Ottertooth, and Silver Rim.

On 9 February 2026 Panther announced plans for an approximately 2,000-metre diamond drilling program at the Wishbone Prospect, following the grant of an Exploration Permit in June 2024 valid through 2027. Previous work confirmed compelling VMS-style mineralisation, including 27.3m of massive sulphide and 51m of sulphide-dominated mineralisation across multiple lenses, supported by high-grade copper anomalies in lake sediments.

In July 2024, Panther secured an Exploration Permit for Awkward West, enabling up to 31 drill holes. Historic drilling returned 27.2m at 2.25% TGC, with zones exceeding 5% TGC, alongside indications of nickel, copper, and platinum group elements, aligning with the Company's critical minerals strategy.

High-resolution magnetic and electromagnetic surveys continue to refine drill targeting across Obonga. Survey and Ottertooth remain highly prospective, hosting multiple untested geophysical anomalies and historic massive sulphide intercepts.

 

Winston Project - Tailings Evaluation and MRE Pathway

Panther Metals' Winston Project represents a near-term, development-focused opportunity centred on the evaluation of historic mine tailings and has been the subject of prior technical and commercial assessment involving Extrakt.

Current work is focused on tailings sampling, metallurgical testing, and data validation to define metal content, recoverability, and support the preparation of a Mineral Resource Estimate (MRE). This approach provides a clear value-creation pathway with lower geological risk than greenfield exploration and aligns with modern reprocessing and critical mineral's themes.

Dotted Lake Project - Hemlo-Adjacent Polymetallic Opportunity

Panther Metals' Dotted Lake Project, acquired in July 2020, is located approximately 16km from Barrick Gold's Hemlo Mine, within a well-established mining region.

Early exploration identified multiple gold and base metal anomalies, with initial drilling confirming gold mineralisation. In early 2025, follow-up drilling materially advanced the project, confirming nickel and magnesium mineralisation within an ultramafic intrusion and identifying a VMS-style system, significantly expanding the project's polymetallic potential.

The program refined structural controls, extended mineralisation, and identified multiple new drill targets, positioning Dotted Lake as a high-upside, multi-commodity exploration asset.

Commercial Strategy - Focused Value Creation

Panther Metals is focused on disciplined, discovery-driven value creation through efficient capital deployment and technical execution. With Obonga delivering high-impact exploration, Winston providing a resource-focused development pathway, and Dotted Lake offering polymetallic upside, the Company maintains a balanced portfolio aligned with favourable commodity market conditions.

The Company's strategy is to advance high-quality assets along the most efficient technical pathway, delivering tangible milestones that underpin long-term shareholder value.

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAMZGMVZGFGVZZ
Date   Source Headline
14th Dec 20208:14 amRNSUpdate
11th Dec 202010:39 amRNSHolding(s) in Company
11th Dec 202010:37 amRNSHolding(s) in Company
4th Dec 20207:00 amRNSIssue of Equity
24th Nov 20207:00 amRNSHolding(s) in Company
16th Nov 202010:44 amRNSAddition to Holdings Around Merolia Gold Project
16th Nov 20207:00 amRNSMerolia Gold Project Acquisition Western Australia
5th Nov 20207:00 amRNSDotted Lake - High Grade Gold Confirmed at Surface
4th Nov 20201:03 pmRNSExercise of warrants – issue of equity
4th Nov 20207:00 amRNSHolding(s) in Company
22nd Oct 20207:00 amRNSHolding(s) in Company
14th Oct 20207:00 amRNSHolding(s) in Company
13th Oct 202010:07 amRNSDotted Lake - Airborne Geophysics Survey
30th Sep 20207:00 amRNSHalf Yearly Report to 30 June 2020
24th Sep 20207:00 amRNSNew Corporate Presentation
23rd Sep 20207:00 amRNSBig Bear Gold Project Exploration Update
16th Sep 20207:00 amRNSBig Bear Gold Project Geophysics Imagery
10th Sep 20208:48 amRNSAcquisition Increases Footprint of Big Bear
7th Sep 20207:00 amRNSPotential Mineralised Structure, Annaburroo Gold
26th Aug 20207:00 amRNSGeophysical Survey shows Potential Mineralisation
12th Aug 202012:59 pmRNSExercise of warrants – issue of equity
11th Aug 20207:00 amRNSBig Bear Gold Project Exploration Update
5th Aug 20204:41 pmRNSSecond Price Monitoring Extn
5th Aug 20204:36 pmRNSPrice Monitoring Extension
27th Jul 20207:00 amRNSDotted Lake Gold Project Area Increased 346%
21st Jul 20204:08 pmRNSHolding(s) in Company
21st Jul 20204:00 pmRNSHolding(s) in Company
16th Jul 20207:00 amRNSAcquisition of the Dotted Lake Property
14th Jul 202012:12 pmRNSTotal Voting Rights Correction
13th Jul 202010:00 amRNSBig Bear, Canada: Acquisition of Additional Claims
13th Jul 20207:00 amRNSPlacing
8th Jul 20207:00 amRNSAnnaburroo Gold Project Update
19th Jun 20208:02 amRNSExercise of warrants – issue of equity
18th Jun 20207:00 amRNSMarrakai Gold Project
17th Jun 20207:02 amRNSHigh-Resolution Airborne Geophysics Survey
10th Jun 20202:06 pmRNSSecond Price Monitoring Extn
10th Jun 20202:00 pmRNSPrice Monitoring Extension
4th Jun 202010:17 amRNSResult of AGM
13th May 20207:25 amRNSNotice of AGM
7th May 20207:00 amRNSBig Bear - Commencement of Field Exploration
1st May 20207:00 amRNSHolding(s) in Company
30th Apr 20207:00 amRNSAudited Results to 31 December 2019
8th Apr 20209:09 amRNSCOVID-19 Update
27th Mar 20207:00 amRNSChange of Auditor
18th Feb 202010:03 amRNSExploration Permit Applications & Work Planning
10th Feb 20207:00 amRNSGrant of Gold Project and Appointment
20th Jan 20207:00 amRNSGold Project Information
15th Jan 20204:58 pmPRNHolding(s) in Company
15th Jan 20202:42 pmPRNChange of Trading Address
9th Jan 20208:05 amPRNAdmission to Listing on the Official List

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.