Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 23.85
Bid: 23.85
Ask: 23.95
Change: -0.15 (-0.63%)
Spread: 0.10 (0.419%)
Open: 23.30
High: 24.55
Low: 23.30
Prev. Close: 24.00
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update quarter ended 30/09/18

6 Nov 2018 07:00

Pan African Resources Plc - Operational Update quarter ended 30/09/18

Pan African Resources Plc - Operational Update quarter ended 30/09/18

PR Newswire

London, November 5

Pan African Resources PLC

("Pan African" or “the company" or “the group”)

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

Share code on AIM: PAF

Share code on JSE: PAN

ISIN: GB0004300496

OPERATIONAL UPDATE FOR THE QUARTER ENDED 30 SEPTEMBER 2018

Pan African is pleased to provide an operational update for the first quarter of the 2019 financial year (“this quarter” or “first quarter”), and further information on the performance of the Elikhulu Tailings Retreatment Plant (“Elikhulu”).

Pan African CEO Cobus Loots commented:

“Pan African recorded a commendable safety and production performance for the first quarter of the 2019 financial year. The group produced 37,729oz of gold during the quarter, and with Elikhulu now commissioned and running at design capacity, we are confident of achieving our production guidance of approximately 170,000oz for the 2019 financial year.

Elikhulu ramped-up to its design capacity of 1-million tonnes per month during October 2018, ahead of the original schedule and on budget. Average gold recoveries achieved were consistent with our forecasts, with further optimisation of recoveries expected in the short term. The incorporation of the Evander Tailings Retreatment Plant (“ETRP”) into Elikhulu, which will increase Elikhulu’s capacity to 1.2-million tonnes per month, is progressing on schedule, with full commissioning expected to be completed by January 2019.

Barberton Mines is on track to meet its full-year production guidance of 100,000oz, with the underground operations’ production benefitting from Fairview Mine’s high-grade 272 and 358 platforms, and the newly installed regrind mill at the Barberton Tailings Retreatment Plant (“BTRP”) performing as anticipated.

At Evander Mines, we have commenced mining and vamping of the remnant high-grade stopes as part of the phased closure of the underground mining operations as an initiative to supplement Evander Mines’ production, while commencing with the equipping and preparatory work to advance the mining of the 8 Shaft pillar and high-grade areas in proximity to the pillar. The first phase of the equipping and preparatory work is expected to be completed in the third quarter of the 2019 financial year.

The drilling programme on Barberton Mines’ Royal Sheba prospect has been completed, and we look forward to updating shareholders on the progress of this exciting growth project in the coming months with an updated resource statement to be released by the end of November 2018, and the feasibility study still on schedule for release in February 2019.”

Safety

The group has significantly improved its safety performance in the first quarter, and we remain committed and focussed to ensuring the safety of all our employees, while we continue to strive towards a zero harm environment.

Fairview Mine achieved its one-million fatality-free shift milestone during July 2018; The group had no fatalities in this quarter (2018 Q1: no fatalities); The group’s lost-time injury frequency rate improved significantly to 0.57 (2018 Q1:3.64); The reportable injury frequency rate improved significantly in this quarter to zero (2018 Q1: 0.91); and The group is implementing recommendations from independent safety experts, following reviews of the respective mining operations’ safety systems and controls.

Elikhulu

As previously communicated, Elikhulu was successfully commissioned during September 2018, ahead of the original project schedule and on budget; During October 2018, the plant attained steady-state production with a throughput of 1-million tonnes per month. The average gold recoveries achieved were consistent with our forecasts, with further optimisation of recoveries expected in the next months; and The incorporation of the existing ETRP throughput into Elikhulu’s processing capacity, which will result in an increased processing capacity of 1.2-million tonnes per month, is on track with full commissioning expected to be completed by January 2019. Barberton Mines Proprietary Limited (“Barberton Mines”) Barberton Mines produced 27,201oz for this quarter, with underground mining operations contributing 21,278oz, and the BTRP contributing 5,923oz. Barberton Mines remains on track to deliver its annual production guidance of approximately 100,000oz for the 2019 financial year. Barberton Mines’ underground operations are benefitting from increased underground mining flexibility due to, inter alia, both the high-grade 272 and 358 platforms being available at the Fairview Mine operation. The BTRP is also benefiting from the commissioning of the regrind mill during May 2018, which has improved throughput and recoveries. Barberton Mines has increased development rates to further improve Fairview Mine’s mining flexibility at the 11-block by developing towards an additional high-grade platform (256 platform), below the existing 272 and 358 platforms. This platform is expected to be in production by the end of the 2019 financial year.

Evander Gold Mines Proprietary Limited (“Evander Mines”)

Evander Mines has implemented the following initiatives to maximise Evander Mines’ underground gold production: Mining and vamping of the remnant high-grade stopes as part of the phased closure of the underground mining operations, which contributed 3,815oz during this quarter; and While the above operations are ongoing, the mine has commenced equipping and preparatory work to advance mining of the 8 Shaft pillar and high-grade areas in proximity to the pillar, following a comprehensive review on the technical merits thereof. The first phase of the equipping and development of the 8 Shaft pillar and surrounding areas is estimated to be completed in the third quarter of the 2019 financial year. The ETRP and surface-source operations produced 3,819oz for this quarter, and the operation is investigating new sources of feed for the Kinross plant, once the ETRP operation is integrated into Elikhulu.

The financial information contained in this announcement has neither been reviewed nor audited by the company’s auditors and is the responsibility of the directors of Pan African.

For further information on Pan African, please visit the company’s website at www.panafricanresources.com

6 November 2018

Contact information
Corporate OfficeThe Firs Office Building2nd Floor, Office 201Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth AfricaOffice: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240Registered OfficeSuite 31Second Floor107 CheapsideLondonEC2V 6DNUnited KingdomOffice: + 44 (0) 20 7796 8644Facsimile: + 44 (0) 20 7796 8645
Cobus LootsPan African Resources PLCChief Executive OfficerOffice: + 27 (0) 11 243 2900Deon LouwPan African Resources PLCFinancial DirectorOffice: + 27 (0) 11 243 2900
Phil DexterSt James's Corporate Services LimitedCompany SecretaryOffice: + 44 (0) 20 7796 8644John Prior / Paul GillamNumis Securities LimitedNominated Adviser and Joint BrokerOffice: +44 (0) 20 7260 1000
Sholto SimpsonOne CapitalJSE SponsorOffice: + 27 (0) 11 550 5009Ross Allister/James Bavister/David McKeownPeel Hunt LLPJoint BrokerOffice: +44 (0) 20 7418 8900
Julian GwillimAprio Strategic CommunicationsPublic & Investor Relations SAOffice: +27 (0)11 880 0037Jeffrey Couch/Thomas RiderBMO Capital Markets LimitedJoint BrokerOffice: +44 (0) 20 7236 1010
Bobby MorseBuchananPublic & Investor Relations UKOffice: +44 (0)20 7466 5000Email: PAF@buchanan.uk.com
Website: www.panafricanresources.com
Date   Source Headline
12th Mar 20127:07 amPRNFurther Cautionary Announcement
22nd Feb 20128:00 amPRNStatement re Results Presentation by Pan African
22nd Feb 20127:00 amPRNInterim Results for the 6 months ended 31 December 2011
1st Feb 201211:12 amPRNApproval for Barberton Tailings Project
31st Jan 20127:48 amPRNPresentation re acqusition of Evander on website
30th Jan 20122:04 pmPRNStatement re acquisition of Evander Gold Mine
30th Jan 20122:01 pmPRNAcquisition of Evander Gold Mine
30th Jan 20128:06 amPRNJoint briefing by Pan African and Wits Gold
25th Jan 20127:00 amPRNTrading Statement
30th Dec 201112:40 pmRNSSecond Price Monitoring Extn
30th Dec 201112:35 pmRNSPrice Monitoring Extension
29th Dec 20117:00 amPRNRenewal of Cautionary Announcement
14th Dec 201112:30 pmPRNChanges to the Board of Directors
13th Dec 20111:00 pmPRNHolding(s) in Company
1st Dec 20119:00 amPRNTotal Voting Rights
29th Nov 20117:11 amPRNFirst production at Phoenix
24th Nov 20119:00 amPRNIssue of Equity
17th Nov 201112:00 pmPRNCautionary Announcement
2nd Nov 20113:56 pmPRNDealings by an Associate of an Non-Executive Director
1st Nov 20113:52 pmPRNResult of AGM
1st Nov 20112:46 pmPRNDealings by an Associate of a Non-executive Director
28th Oct 20117:00 amPRNIssue of Equity
17th Oct 20117:00 amPRNCold commissioning commences at Phoenix Platinum
28th Sep 20111:50 pmPRNCorrection to Annual Report and Dividend dates
28th Sep 20118:30 amRNSAnnual Report, AGM & Dividend notification
22nd Sep 20112:09 pmPRNHolding(s) in Company
22nd Sep 20111:48 pmPRNNominated Adviser Change of Registered Name
12th Sep 20117:00 amPRNFinal Results
19th Aug 20117:00 amPRNListing of Manica as a Separate Entity
15th Aug 20117:00 amPRNNotice of Results
27th Jul 20118:51 amPRNWage Negotiations Concluded
20th Jul 20111:00 pmPRNDirectorate Change
1st Jul 201112:32 pmPRNCorrection : Statement re Phoenix Platinum Project
1st Jul 201112:01 pmPRNStatement re Phoenix Platinum Project
22nd Jun 20117:00 amPRNResource Upgrade at Manica and Group Resource Upgrade
9th Jun 20118:00 amPRNResults of Drilling Programme at Bramber Tailings Dam
31st May 20119:20 amPRNStatement re Conference Presentation
31st May 20119:15 amPRNStatement re Barberton Mines Resource Upgrade
3rd May 20118:58 amPRNStatement re Revolving Credit Facility
4th Apr 20117:00 amPRNMozambique Govt Awards Mining Licence on Manica Project
23rd Mar 20117:00 amPRNPan African Commences Bulk Earthworks at Phoenix Plat
22nd Feb 20117:00 amPRNInterim results for the six months ended 31 Dec 2010
10th Feb 20117:00 amPRNStatement re Site Visit to Barberton Mines
3rd Feb 20112:00 pmPRNTrading Update
4th Jan 201112:00 pmPRNTotal Voting Rights
31st Dec 20108:00 amPRNHolding(s) in Company
16th Dec 20104:35 pmRNSPrice Monitoring Extension
15th Dec 20102:00 pmPRNHolding(s) in Company
14th Dec 20102:00 pmPRNHolding(s) in Company
8th Dec 20102:01 pmPRNHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.