Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.75
Bid: 24.60
Ask: 24.70
Change: -0.80 (-3.13%)
Spread: 0.10 (0.407%)
Open: 25.65
High: 25.65
Low: 24.30
Prev. Close: 25.55
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Major zone of gold mineralisation defined at Royal Sheba

30 Jun 2010 07:00

30 June 2010 Pan African Resources PLC ("Pan African" or the "Company")

Incorporated and registered in England and Wales under Companies Act 1985 with

registered number 3937466 on 25 February 2000 Share code on AIM: PAF Share code on JSE: PAN ISIN: GB0004300496 Major zone of gold mineralisation defined at the Royal Sheba prospect and resource upgrade reported for Barberton Mines

Pan African Resources PLC (JSE: PAN / AIM: PAF), has defined several zones of mineralisation following a two year drilling and underground development programme at its wholly owned Barberton Mines (Pty) Ltd (`Barberton Mines') in South Africa.

Highlights

Royal Sheba mineralised zone

* Significant ore-body (named Royal Sheba) defined below historical mine workings at the Royal Sheba prospect within current mine lease area. * Royal Sheba ore-body represents a total resource of approximately 506koz. * The ore-body is on average between 5 metres and 25 metres wide at a non-refractory in situ grade of 2.97g/t which could become mineable from a depth of 350m below surface. * Potentially mineable pillars within upper areas between surface and 350 metres below surface have been identified. * Exploration drilling confirms the open-ended nature of the ore-body to a depth of 800 metres below surface. * Feasibility study being undertaken to assess the potential economic extraction of the ore-body.

Total mine mineral resource upgrade

* Total mineral resource increased by 18% to 2.37Moz (11.77Mt at 6.29g/t in situ). * Measured and Indicated (`M&I') mineral resource increased by 30% to 1.81Moz (9.43Mt at 5.99g/t in situ) inclusive of a significant tailings resource representing 116koz (1.34Mt at 2.69g/t in situ). * Mineral reserve increased by 6.8% to 661koz (2.31Mt at 8.87g/t in situ). * At an 85% conversion factor applied to the Measured and Indicated Mineral resource, Life of Mine (`LOM') increased by 50% to in excess of 15 years based on a depletion rate of 100koz per annum.

Jan Nelson, Chief Executive Officer of Pan African, commented: "The team's hard work over the past three years coupled with substantial capital allocated by the Board has shown that Barberton Mines has a future that is sustainable in the long term. The team will continue to investigate additional target areas identified that could have the potential to grow the production profile."

Royal Sheba defined zone of gold mineralisation

The Royal Sheba defined zone of gold mineralisation extends contiguous to historical mine workings at the Royal Sheba prospect from 350 metres below surface. The zone is between 5 metres and 25 metres wide, is non-refractory and represents a total resource of 506koz (5.48Mt at 2.87g/t). The M&I resource represents 400koz (4.24Mt at 2.97g/t). The zone of mineralisation identified has been tested with exploration drilling to a depth of 850 metres below surface and remains open ended. In addition, potentially mineable pillars left in situ in the area between surface and a depth of 350 metres below surface have also been identified.

The Company is completing a feasibility study to determine if this defined zone of mineralisation is economically viable. The focus of this feasibility study will target wider zones of mineralisation at lower grades through mechanised mining, which is expected to result in a reduction in working costs resulting in higher margins.

Total mine resource upgrade

Since the acquisition of Barberton Mines in July 2007, Pan African has increased the geological expertise at the mine as well as establishing a formalised Mineral Resources Management system. A Mineral Resources Manager was appointed in October 2009 to focus on increasing the LOM.

This approach combined with an exploration programme that comprised over 30,000 metres of underground exploration drilling and 3,000 metres of underground development has led to several new zones of mineralisation being defined.

The Company is pleased to report that as a result, assuming an 85% conversion factor applied to the M&I resource, the LOM has been extended to in excess of 15 years based on a depletion rate of 100koz per annum. Compared to the previous period, the LOM has increased by over 50%, which illustrates both the quality of the geological team as well as the potential of the mineral resource of the mine.

The total resource has been increased by 18% to 2.37Moz (11.77Mt at 6.29g/t in situ), and the M&I resource increased by 30% to 1.81Moz (9.43Mt at 5.99g/t). This resource also, for the first time, includes a tailings resource on surface representing 116koz (1.34Mt at 2.69g/t). Management is evaluating the potential to economically mine part of this tailings resource.

The mineral reserve increased by 6.8% to 661koz (2.31Mt at 8.87g/t in situ).

The table below sets out the 2010 SAMREC compliant mineral resource and mineral reserve inventory for Barberton Mines (100% accreditable):

Barberton Mines 2010 Tonnes Grade Gold Gold (`000 t) g/t Kg (`000 oz) Mineral resources 11,770 6.29 74,002 2,379(total) Inferred 2,331 7.50 17,489 562 Indicated 4,159 6.09 25,331 814 Measured 5,280 5.91 31,181 1,003 Tonnes Grade Gold Gold (`000 t) g/t Kg (`000 oz) Mineral reserves 2,319 8.87 20,572 661(total) Probable 900 11.97 10,777 346 Proved 1,418 6.91 9,795 315Enquiries:South Africa UK Pan African RBC Capital Markets Jan Nelson, Chief Executive Officer Martin Eales / Brett Jacobs +27 (0) 11 243 2900 +44 (0) 20 7029 7881 Pan African St James's Corporate Services Limited Nicole Spruijt, Public Relations Phil Dexter +27 (0) 11 243 2900 +44 (0) 20 7499 3916 Macquarie First South Advisers (Pty) Hansard Communications Ltd Justine James Melanie de Nysschen +44 (0) 20 7245 1100 +27 (0) 11 583 2000 +44 (0) 7525 324431 Notes: * For the purpose of this announcement: * + Any single ore body that represents more than 15% of the current resource of 2.37Moz is deemed to be "significant" or "major" + A conversion factor of 85% is based on leaving 15% as mine design pillars when taking the M&I resource to reserve and further assumes that, except for stabilisation pillars, all of the M&I resource is converted to reserve. * Geologix MRC (Pty) Limited is a South African resources and geological consultancy - D. Briggs is SACNASP accredited and was responsible for the Royal Sheba resource estimate. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears. * Martin Bevelander, Group Consulting Geologist for Pan African, is SACNASP accredited and was responsible for validating the geological model and valuation database. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears. * The resource statement is SAMREC compliant. * SACNASP - South African Council for Natural Scientific Professions.

vendor
Date   Source Headline
25th Aug 20178:15 amPRNUpdate on Environmental Permitting for Elikhulu
21st Aug 20174:29 pmPRNCorrection : Trading Statement
18th Aug 201711:18 amPRNTrading Statement
31st Jul 20177:15 amPRNDisposal of Phoenix Platinum Mining Proprietary Limited
20th Jul 201711:00 amPRNOperational Update
26th Jun 20177:00 amPRNFulfilment of conditions precedent Uitkomst Colliery
28th Apr 20174:00 pmPRNHolding(s) in Company
19th Apr 20174:00 pmPRNConfirmation of listing & pricing of ordinary shares
18th Apr 20174:45 pmPRNHolding(s) in Company
12th Apr 20174:07 pmPRNResult of Placing
12th Apr 20177:00 amPRNProposed Financing for Eikhulu Tailings Project
11th Apr 201710:45 amPRNHolding(s) in Company
10th Apr 20178:18 amPRNUpdate on Evander Mines
5th Apr 20177:00 amPRNDisposal of PAR Coal & Uitkomst
10th Mar 20173:50 pmPRNUpdate on Evander & Progress on Elikhulu Financing
22nd Feb 20177:00 amPRNInterim Results for the 6 months ended 31 Dec 2016
20th Feb 20177:00 amPRNEvander Fatality & Shaft Refurbishment Programme
9th Feb 20173:16 pmPRNResult of General Meeting
27th Jan 201710:30 amPRNTrading Statement
16th Jan 20179:00 amPRNNotice of GM
21st Dec 20163:50 pmPRNAdditional Listing
5th Dec 201610:10 amPRNElikhulu Project
25th Nov 20162:30 pmPRNResult of AGM
7th Nov 20167:00 amPRNDirector/PDMR Shareholding
4th Nov 20169:00 amPRNAmendment to Form of Proxy
28th Oct 20168:00 amPRNNotice of AGM & No Change Statement
13th Oct 201610:00 amPRNSalient Dividend Dates
5th Oct 20164:30 pmPRNDirector/PDMR Shareholding
4th Oct 20168:36 amPRNDirector/PDMR Shareholding
4th Oct 20167:00 amPRNHolding(s) in Company
28th Sep 20163:56 pmPRNDirector/PDMR Shareholding
21st Sep 20167:01 amPRN2016 Abridged Mineral Resource & Mineral Reserve Report
21st Sep 20167:00 amPRNProvisional audited results & final div announcement
30th Aug 20162:00 pmPRNHolding(s) in Company
2nd Aug 201610:30 amPRNTrading Statement
19th Jul 201611:00 amPRNUpdate on Phoenix and IFMSA Business Rescue
5th Jul 20164:30 pmPRNHolding(s) in Company
28th Jun 20163:30 pmPRNHolding(s) in Company
22nd Jun 20161:00 pmPRNPAN Appointment of Joint Broker 22 Junio 2016
15th Jun 20163:30 pmPRNDirector/PDMR Shareholding
3rd Jun 201611:00 amPRNHolding(s) in Company
1st Jun 20167:00 amPRNAcceptance of the Jadeite Offer
26th May 20167:09 amPRNAcquisition and Vendor Placing
18th May 20161:00 pmPRNHolding(s) in Company
6th May 20164:00 pmPRNHolding(s) in Company
22nd Apr 20164:00 pmPRNHolding(s) in Company
19th Apr 20163:30 pmPRNDirector/PDMR Shareholding
4th Apr 20163:10 pmPRNReissue : Completion of Uitkomst Colliery Transaction
4th Apr 20162:00 pmPRNStatement re (insert appropriate text)
23rd Mar 20161:00 pmPRNDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.