Rainbow Rare Earths Phalaborwa project shaping up to be one of the lowest cost producers globally. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOriole Resources Regulatory News (ORR)

Share Price Information for Oriole Resources (ORR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.32
Bid: 0.32
Ask: 0.33
Change: -0.0125 (-3.70%)
Spread: 0.01 (3.125%)
Open: 0.325
High: 0.325
Low: 0.32
Prev. Close: 0.3375
ORR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Muratdere Feasibility Study Update

15 Oct 2014 07:00

RNS Number : 3104U
Stratex International PLC
15 October 2014
 



Stratex International Plc / Index: AIM / Epic: STI / Sector: Mining

 

Stratex International Plc

 

('Stratex' or 'the Company')

 

Muratdere Feasibility Study Update -

High-grade copper concentrates confirmed by metallurgical testing

 

 

Stratex International Plc, the AIM-quoted exploration and development company, is pleased to provide an update on development at its Muratdere copper-molybdenum project in Turkey ('Muratdere' or 'the Project').

 

Located 250 km west of Ankara in Turkey, the Muratdere property comprises three licences covering a substantial copper-molybdenum porphyry system with gold and silver credits. The initial resource extends over a distance of approximately 2 km but is open to the east, west and at depth, suggesting potential to increase the resource.

 

Highlights

 

· Flotation testwork of supergene material averaged 80% recovery of sulphide-copper, with concentrates averaging 33.6% copper;

· 11% of copper within supergene material is non-sulphide copper, which is not possible to recover with flotation;

· Development of flowsheet and equipment selection well-advanced;

· Forest Permit application submitted for technical drilling of the tailings dam area; and

· Final feasibility study expected by end of 2014 - not dependent on Forest Permit approval.

 

Bob Foster, Stratex Chief Executive Officer, said:"Our partner, Lodos, has made good progress with the detailed feasibility study. The metallurgical testwork has demonstrated encouraging recoveries of copper in concentrate, together with significant recoveries of gold, silver, and molybdenum. Major engineering consultancy Jacobs Engineering Group has been appointed as process engineer for the Project and Turkish consultancies are undertaking conceptual mine design and preparing tenders for mining and for the processing plant.

 

"We continue to be delighted with the professional approach taken by Lodos to the evaluation of the Project and look forward to providing further updates as and when key objectives are achieved."

 

 

Further Details

 

Located 250 km west of Ankara in Turkey, the Muratdere property comprises three licences covering a substantial copper-molybdenum porphyry system with gold and silver credits. The porphyry system extends east-west for a distance of approximately 4 km and has a width of between 200 m and 400 m. The initial JORC-compliant inferred resource of 51 million tonnes (186,000 tonnes copper, 204,296 oz gold, 3.9 million oz silver, 6,390 tonnes molybdenum and 17,594 kg rhenium) extends over a distance of approximately 2 km but is open to the east, west and at depth, suggesting potential to increase the resource.

 

Stratex's Turkish partner, Lodos Maden Yatırım Sanayii ve Ticaret A.Ş. ('Lodos'), has acquired 61% of Muratdere through the completion of drilling and cash payments to Stratex totalling US$2.2 million. A feasibility study is nearing completion, which will see Lodos earn a total 70% interest.

 

Following the announcement of a pit design, based on two pits using 0.3% Cu cut-off to yield initial resource of 15 M tonnes averaging 0.54% Cu (80,000 t) and 0.10 g/t Au (48,000 oz) - 66% Indicated, remainder Inferred (Press Release dated 7 March 2014), Lodos continues to make good technical progress at Muratdere and completion of the feasibility study is anticipated before the end of 2014.

 

Lodos has retained an experienced Turkish mine engineering consultant to generate the conceptual mine design, including optimised interim and final open pits, haulage roads, waste disposal area and roads to plant entry. A team from Hacettepe University, who are very experienced in sulphide flotation having worked on First Quantum's Cayeli Mine and Aldridge Minerals' Yenipazar Mine, is currently undertaking detailed technical studies that include equipment selection and sizing, preparation of mining tenders and calculation of power, reagent and consumable usage. International consultancy Jacobs Engineering Group has been appointed as process engineer for the Project.

 

Metallurgical test work has now been completed on seven samples of supergene material comprising two bulk composite samples (MC1 & MC2) and five smaller samples collected to evaluate mineralogical and processing variability (V1-V5). One sample of hypogene material (V6) was also included in the study. Mineralogical studies indicated that the supergene material contained predominantly chalcocite, covellite, and chalcopyrite in varying proportions, the occurrence of chalcopyrite indicating the presence of some hypogene mineralisation that has survived supergene alteration. The supergene material also contains an average of 11% non-sulphide copper in the samples tested.

 

Locked cycle tests (designed to simulate a continuous, stable flotation circuit) yielded sulphide-copper recoveries of between approximately 78% and 90% copper (Cu), averaging 79.76% Cu, together with some recoveries of gold (Au), silver (Ag), and molybdenum (Mo). Copper contents of the recovered concentrates were in the range 31-39% Cu, with one exception at 28% Cu. Initial indications are that these high-grade copper concentrates will be readily saleable.

 

Applications for Forest Permits have been submitted for geotechnical drilling of the site of the tailings facility and their approvals are awaited. Geotechnical drilling of the site will test the ground's suitability to host the facility. Timing of Forest Permit approval is not expected to impact completion date of the feasibility study.

 

On completion of the feasibility study Lodos will vest at 70% of the Project and Stratex will decide whether to contribute to further development of the project or be diluted. Other options may include sale of the Company's 30% shareholding of the Project either to Lodos or to a third party. Should the Company decide to contribute, all subsequent costs will be shared pro rata by Lodos and Stratex Madencilik. In the event that either party does not contribute, its equity interest will be reduced according to a standard contribute-or-dilute formula, as defined by expenditures. In the event that a party's equity interest falls below 10%, its interest shall be converted to a 1.2% Net Smelter Returns royalty.

 

For further information on Muratdere, please visit our website at http://www.stratexinternational.com/project/muratdere.

 

* * ENDS * *

 

For further information please visit www.stratexinternational.com, email info@stratexplc.com, or contact:

 

Stratex International Plc

Tel: +44 (0)20 7830 9650

 

Bob Foster / Christopher Hall / Claire Bay

 

 

Grant Thornton UK LLP

Tel: +44 (0)20 7383 5100

 

Philip Secrett / Melanie Frean / Jen Clarke

 

 

 

Northland Capital Partners Limited

Tel: +44 (0)20 7382 1100

 

Gavin Burnell / Matthew Johnson / Alice Lane /John Howes

 

 

 

SP Angel Corporate Finance LLP

Tel: +44 (0)20 3463 2260

 

Ewan Leggat / Tercel Moore

 

 

 

Yellow Jersey PR Limited

Tel: +44 (0)20 3664 4087

 

Dominic Barretto / Philip Ranger / Anna Legge

 

 

 

Notes to editors:

Stratex International is a well-funded AIM-quoted exploration and development company focussed on gold and high-value base metals in Turkey, East Africa and West Africa. Since listing on AIM in 2006, Stratex has had an impressive track record of successful exploration supported by joint-venture partnerships, both with major international mining companies and local companies to maximise the potential of its discoveries.

 

In December 2012 the Company announced the sale of its 30% interest in the Öksüt gold project for cash of 20 times its original US$1 million investment and retained a royalty of 1% up to a maximum additional value of US$20 million.

To date Stratex has discovered more than 2.2 million ounces of gold and 7.9 million ounces of silver, as well as 186,000 tonnes of copper. The Company has a robust cash balance and is therefore well-placed to advance its existing exploration programmes and is also actively seeking to acquire advanced projects that are at the drill-ready stage or even have identified resources, particularly in East Africa and West Africa.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKELFEXLFFF
Date   Source Headline
7th Oct 20207:01 amRNSNR Private Market Offer
7th Oct 20207:00 amRNSPlacing and Subscription to Raise approx £1.576m
1st Oct 20205:18 pmRNSHolding(s) in Company
1st Oct 20207:00 amRNSDrilling at Hesdaba Gold Project
24th Sep 202010:00 amRNSInvestor Event
24th Sep 20207:00 amRNSMobilisation of Drill Rig to Bibemi Project
22nd Sep 20207:00 amRNSInterim Results for the period ended 30 June 2020
15th Sep 20207:00 amRNSNotice of Interim Results & Investor Presentation
20th Aug 20207:00 amRNSIssue of Share Options and Directors Dealings
19th Aug 20207:00 amRNSUpdate on Turkish Operations
17th Aug 20207:00 amRNSSale of Karaagac Mining Royalty
10th Aug 20203:59 pmRNSUpdate on Sale of Hasançelebi & Dogala Royalties
30th Jul 20207:00 amRNSSale of Hasançelebi & Dogala Mining Royalties
28th Jul 20208:00 amRNSHolding(s) in Company
22nd Jul 20202:30 pmRNSNR Private Markets Investor Lounge
22nd Jul 20202:05 pmRNSSecond Price Monitoring Extn
22nd Jul 20202:00 pmRNSPrice Monitoring Extension
16th Jul 20202:06 pmRNSHolding(s) in Company
16th Jul 20202:05 pmRNSTotal Voting Rights Correction
16th Jul 20207:00 amRNSThani Stratex Djibouti Exploration Update
30th Jun 20207:00 amRNSPlacing and Subscription to Raise £419,500
29th Jun 20207:00 amRNSAir Core Drilling Commences at Senala Gold Project
25th Jun 20207:00 amRNSThani Stratex Djibouti Exploration Update
15th Jun 20207:00 amRNSAPPOINTMENT OF CORPORATE BROKER
3rd Jun 202012:55 pmRNSIssue of Warrants
26th May 20202:23 pmRNSResults of Annual General Meeting
18th May 20204:07 pmRNSPre-AGM Presentation and Q&A
18th May 20207:00 amRNSR&D Rebate from HMRC Delivers £165k
11th May 20207:00 amRNSExpansion of Planned Drill Programme at Bibemi
8th Apr 20207:00 amRNSPosting of Annual Report and Notice of AGM
24th Mar 20207:00 amRNSFinal Results and Notice of AGM
12th Mar 20207:00 amRNSIAMGOLD Initiates Year 3 Earn-in at Senala
9th Mar 20207:00 amRNSThani Stratex Djibouti Exploration Update
2nd Mar 202012:27 pmRNSUpdate on Directors Share Option Remuneration Plan
2nd Mar 20207:00 amRNSPrivate Placement to Raise £245,000
28th Feb 20205:45 pmRNSHolding(s) in Company
25th Feb 20202:44 pmRNSDisposal of Holding in Tembo Gold Corp.
22nd Jan 20207:00 amRNSHigh-grades Continue at Bibemi
21st Jan 20209:54 amRNSHolding(s) in Company
21st Jan 20207:00 amRNSExtension of Licence Tenure in Senegal
21st Nov 20192:37 pmRNSHolding(s) in Company
21st Nov 20197:30 amRNSMuratdere Converts to a 1.2% NSR
20th Nov 201910:00 amRNSUpdated Presentation
20th Nov 20199:56 amRNSWork Restarts in Senegal
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
19th Nov 20197:00 amRNSInvestment Update on Thani Stratex Resources
14th Nov 20197:00 amRNSStrategic Update
13th Nov 20199:39 amRNS121 Mining Investment Conference
11th Nov 20197:00 amRNSR&D Rebates from HMRC Deliver a Further c.£105,000

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.