Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

12 Jan 2009 07:00

RNS Number : 4402L
Ormonde Mining PLC
12 January 2009
 

12th January 2009

Ormonde Mining plc

Drilling Results Facilitate Doubling of Proposed Production Rate at Barruecopardo 

DUBLIN & LONDON: 12 January 2009 - Ormonde Mining plc ("Ormonde" or "the Company") is pleased to report excellent results from the last seven holes of its current infill drilling programme at its Barruecopardo Tungsten Project in Salamanca, Spain ("the Project"). These results indicate that the deposit could sustain a much higher production rate than initially proposed for the Project and have led to the decision to adopt a 400,000 tonnes per year ("tpy") production rate (previously 200,000 tpy) for the completion of technical studies on the Project. These higher throughput levels should lead to greater returns on a future mining investment.

The drilling results have continued to exceed expectations and include hole BAR-54 returning a true thickness (tt) intersection of 27.5 metres at 1.2% WO3 and hole BAR-55 returning 11.8 metres at 0.9% WO3.
The drilling has established continuous bands of tungsten mineralisation in the Filon Principal Zone (FP), as depicted in the accompanying plan and sections  (www.ormondemining.com/doc/press/pr090112.pdf). The FP Zone  mineralisation is  open to the north, partially open to the south and open at depth  along its full one kilometre length.

An analysis of all of the drilling on the FP Zone indicates that the Project has the capacity to produce at much higher production rates than initially proposed. A production rate of 400,000 tpy has now been adopted for the ongoing technical studies (previously  200,000 tpy). There may be scope for further increases in production rate post start-up.

The increased mining rates provided by the latest drilling results have led Ormonde to adopt an overall resource cut-off grade of 0.25% WO3 (previously 0.4% WO3).  At this cut-off grade the June '08 resource estimation prepared by CSA Global is 5.2 million tonnes at 0.48% WO3 (2.5 million metric tonne units (mtu) of WO3). In practice, depending upon the mix of selective versus bulk mining methods employed, the cut-off grade may be varied and there will be significant flexibility to mine at different tungsten grades depending upon prevailing market conditions.
The recent drill infill results indicate that, based on the present resource figures, the down dip extensions of FP Zone alone can now be considered to be an exploration target of some 2 million tonnes per 100m vertically. 

Kerr Anderson, Managing Director, said:

"The infill drilling on the Filon Principal Zone has been extremely successful and has returned impressive tungsten results. The consistency and grades have exceeded our expectations and will enhance the Project in terms of the increased production rate, the applicability of bulk underground mining methods and the flexibility to mine at different tungsten grades." 

Ormonde, through its wholly owned Spanish subsidiary Saloro S.L., holds a 90% interest in the Barruecopardo Tungsten Project. Ormonde aims to benefit from the robust project economics, extensive resource upside potential and the low development capital cost requirements to become a leading low cost Western producer of tungsten in the near term.

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

WO3% (cut)*

Zone

BAR-49

173.0

19.0

13.5

0.45

0.29

FP

including

11.0

7.8

0.68

0.41

BAR-50

158.0

53.0

35.5

0.38

0.38

FP

including

158.0

11.0

7.4

0.46

0.46

including

3.0

2.0

1.26

1.26

and

175.0

12.0

8.0

0.72

0.72

including

4.0

2.7

1.78

1.78

and

197.0

14.0

9.4

0.43

0.43

including

7.0

4.7

0.61

0.61

BAR-51

95.0

1.0

0.7

0.23

0.23

FP

BAR-52

122.0

63.0

53.3

0.18

0.18

FP

including

122.0

12.0

10.1

0.24

0.24

including

5.0

4.2

0.40

0.40

and

144.0

10.0

8.4

0.36

0.36

and

170.0

15.0

12.7

0.28

0.28

including

10.0

8.4

0.34

0.34

BAR-53

53.0

11.0

8.4

0.15

0.15

FP

including

61.0

3.0

2.3

0.52

0.52

BAR-54

93.0

33.0

27.5

1.20

0.70

FP, F1, F2

including

82.0

3.0

2.5

1.52

1.52

FP

and

102.0

9.0

7.5

0.66

0.66

F1

and

119.0

7.0

5.8

4.08

1.73

F2

BAR-55

110.0

36.0

21.2

0.55

0.45

FP

including

126.0

20.0

11.8

0.85

0.68

Notes to table:

FP = Filon Principal Zone

F1, F2 = Footwall Zones as yet unclassified

* = using a top cut of 3.0% 

Notes on assay method:

Assays are reported using the fusion XRF method.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html. 

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSEFWUSUSELF
Date   Source Headline
28th Jun 20137:00 amRNSSalamanca Drilling Update
24th Jun 201310:27 amRNSHolding(s) in Company
6th Jun 201311:50 amRNSResult of AGM
6th Jun 20137:00 amRNSAGM Presentation
4th Jun 201311:50 amRNSNotification of Interest
21st May 20137:00 amRNSAppointment of Second Broker
16th May 20135:50 pmRNSNotification of Interest
16th May 20137:00 amRNSLa Zarza Update
15th May 201312:41 pmRNSNotification of Interest
1st May 20133:15 pmRNSAnnual Financial Report
17th Apr 20137:00 amRNSFinal Results
10th Apr 20137:00 amRNSBarruecopardo Permitting Update
11th Mar 20137:00 amRNSPeralonso Drilling Results
4th Feb 20137:00 amRNSSalamanca Prospect Update
23rd Jan 20137:00 amRNSDrilling Results at Peralonso
17th Dec 20127:00 amRNSCabeza Prospect Update
14th Dec 201212:25 pmRNSNotification of Interest
7th Dec 20127:00 amRNSEnterprise Securities Market Notice
4th Dec 20127:00 amRNSPlacing
22nd Nov 20127:00 amRNSBarruecopardo Progress Update
9th Nov 201211:00 amRNSAntofagasta opt out of La Zarza
23rd Oct 20127:00 amRNSCabeza Trenching Results
16th Oct 20127:00 amRNSFurther Drilling Results at Barruecopardo
15th Oct 20127:00 amRNSUpdate on Zamora Gold Project
27th Sep 20127:00 amRNSInterim Results
17th Sep 201212:08 pmRNSNotification of Interest
27th Jul 201212:42 pmRNSResult of AGM
26th Jul 20127:00 amRNSBarruecopardo Permitting
4th Jul 20127:00 amRNSJV Gold Project Update
26th Jun 20122:00 pmRNSAnnual Financial Report
18th Jun 20127:00 amRNSFurther Encouraging Progress in Gold Joint Venture
6th Jun 20127:00 amRNSFinal Results
28th Mar 20127:00 amRNSFurther Positive Results from Gold Joint Venture
14th Mar 20127:00 amRNSEnterpise Securities Market Notice
12th Mar 20127:00 amRNSPlacing
28th Feb 20127:00 amRNSDFS Results
13th Feb 20127:00 amRNSUpdate on Spanish Operations
8th Dec 20113:36 pmRNSNotification of share dealing by director
8th Dec 20117:00 amRNSLa Zarza Update
6th Dec 20117:00 amRNSExpanded Drilling Campaign Commencing on Gold JV
14th Nov 20114:18 pmRNSHolding(s) in Company
10th Nov 20117:00 amRNSFinal Barruecopardo Drilling Results
25th Oct 20117:00 amRNSInterim Report on Feasibility Study
19th Oct 20117:00 amRNSJV Gold Project Update
29th Sep 20117:00 amRNSInterim Results
15th Aug 20117:00 amRNSAntofagasta-Ormonde La Zarza Joint Venture Update
10th Aug 20117:00 amRNSBarruecopardo Drilling Update
21st Jul 20117:00 amRNSLa Zarza Copper Project Progress Update
15th Jul 20112:00 pmRNSResult of AGM
30th Jun 20117:00 amRNSAppointment of CFO

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.