Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

12 Jan 2009 07:00

RNS Number : 4402L
Ormonde Mining PLC
12 January 2009
 

12th January 2009

Ormonde Mining plc

Drilling Results Facilitate Doubling of Proposed Production Rate at Barruecopardo 

DUBLIN & LONDON12 January 2009 Ormonde Mining plc ("Ormonde" or "the Company") is pleased to report excellent results from the last seven holes of its current infill drilling programme at its Barruecopardo Tungsten Project in SalamancaSpain ("the Project"). These results indicate that the deposit could sustain a much higher production rate than initially proposed for the Project and have led to the decision to adopt a 400,000 tonnes per year ("tpy") production rate (previously 200,000 tpy) for the completion of technical studies on the Project. These higher throughput levels should lead to greater returns on a future mining investment.

The drilling results have continued to exceed expectations and include hole BAR-54 returning a true thickness (tt) intersection of 27.5 metres at 1.2% WO3 and hole BAR-55 returning 11.8 metres at 0.9% WO3.
The drilling has established continuous bands of tungsten mineralisation in the Filon Principal Zone (FP), as depicted in the accompanying plan and sections  (www.ormondemining.com/doc/press/pr090112.pdf). The FP Zone  mineralisation is  open to the north, partially open to the south and open at depth  along its full one kilometre length.

An analysis of all of the drilling on the FP Zone indicates that the Project has the capacity to produce at much higher production rates than initially proposed. production rate of 400,000 tpy has now been adopted for the ongoing technical studies (previously  200,000 tpy). There may be scope for further increases in production rate post start-up.

The increased mining rates provided by the latest drilling results have led Ormonde to adopt an overall resource cut-off grade of 0.25% WO3 (previously 0.4% WO3).  At this cut-off grade the June '08 resource estimation prepared by CSA Global is 5.2 million tonnes at 0.48% WO3 (2.5 million metric tonne units (mtu) of WO3). In practice, depending upon the mix of selective versus bulk mining methods employed, the cut-off grade may be varied and there will be significant flexibility to mine at different tungsten grades depending upon prevailing market conditions.
The recent drill infill results indicate that, based on the present resource figures, the down dip extensions of FP Zone alone can now be considered to be an exploration target of some 2 million tonnes per 100m vertically. 

Kerr Anderson, Managing Director, said:

"The infill drilling on the Filon Principal Zone has been extremely successful and has returned impressive tungsten results. The consistency and grades have exceeded our expectations and will enhance the Project in terms of the increased production rate, the applicability of bulk underground mining methods and the flexibility to mine at different tungsten grades.

Ormonde, through its wholly owned Spanish subsidiary Saloro S.L., holds a 90% interest in the Barruecopardo Tungsten Project. Ormonde aims to benefit from the robust project economics, extensive resource upside potential and the low development capital cost requirements to become a leading low cost Western producer of tungsten in the near term.

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

WO3% (cut)*

Zone

BAR-49

173.0

19.0

13.5

0.45

0.29

FP

including

11.0

7.8

0.68

0.41

BAR-50

158.0

53.0

35.5

0.38

0.38

FP

including

158.0

11.0

7.4

0.46

0.46

including

3.0

2.0

1.26

1.26

and

175.0

12.0

8.0

0.72

0.72

including

4.0

2.7

1.78

1.78

and

197.0

14.0

9.4

0.43

0.43

including

7.0

4.7

0.61

0.61

BAR-51

95.0

1.0

0.7

0.23

0.23

FP

BAR-52

122.0

63.0

53.3

0.18

0.18

FP

including

122.0

12.0

10.1

0.24

0.24

including

5.0

4.2

0.40

0.40

and

144.0

10.0

8.4

0.36

0.36

and

170.0

15.0

12.7

0.28

0.28

including

10.0

8.4

0.34

0.34

BAR-53

53.0

11.0

8.4

0.15

0.15

FP

including

61.0

3.0

2.3

0.52

0.52

BAR-54

93.0

33.0

27.5

1.20

0.70

FP, F1, F2

including

82.0

3.0

2.5

1.52

1.52

FP

and

102.0

9.0

7.5

0.66

0.66

F1

and

119.0

7.0

5.8

4.08

1.73

F2

BAR-55

110.0

36.0

21.2

0.55

0.45

FP

including

126.0

20.0

11.8

0.85

0.68

Notes to table:

FP = Filon Principal Zone

F1, F2 = Footwall Zones as yet unclassified

* = using a top cut of 3.0% 

Notes on assay method:

Assays are reported using the fusion XRF method.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSEFWUSUSELF
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.