Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

12 Jan 2009 07:00

RNS Number : 4402L
Ormonde Mining PLC
12 January 2009
 

12th January 2009

Ormonde Mining plc

Drilling Results Facilitate Doubling of Proposed Production Rate at Barruecopardo 

DUBLIN & LONDON12 January 2009 Ormonde Mining plc ("Ormonde" or "the Company") is pleased to report excellent results from the last seven holes of its current infill drilling programme at its Barruecopardo Tungsten Project in SalamancaSpain ("the Project"). These results indicate that the deposit could sustain a much higher production rate than initially proposed for the Project and have led to the decision to adopt a 400,000 tonnes per year ("tpy") production rate (previously 200,000 tpy) for the completion of technical studies on the Project. These higher throughput levels should lead to greater returns on a future mining investment.

The drilling results have continued to exceed expectations and include hole BAR-54 returning a true thickness (tt) intersection of 27.5 metres at 1.2% WO3 and hole BAR-55 returning 11.8 metres at 0.9% WO3.
The drilling has established continuous bands of tungsten mineralisation in the Filon Principal Zone (FP), as depicted in the accompanying plan and sections  (www.ormondemining.com/doc/press/pr090112.pdf). The FP Zone  mineralisation is  open to the north, partially open to the south and open at depth  along its full one kilometre length.

An analysis of all of the drilling on the FP Zone indicates that the Project has the capacity to produce at much higher production rates than initially proposed. production rate of 400,000 tpy has now been adopted for the ongoing technical studies (previously  200,000 tpy). There may be scope for further increases in production rate post start-up.

The increased mining rates provided by the latest drilling results have led Ormonde to adopt an overall resource cut-off grade of 0.25% WO3 (previously 0.4% WO3).  At this cut-off grade the June '08 resource estimation prepared by CSA Global is 5.2 million tonnes at 0.48% WO3 (2.5 million metric tonne units (mtu) of WO3). In practice, depending upon the mix of selective versus bulk mining methods employed, the cut-off grade may be varied and there will be significant flexibility to mine at different tungsten grades depending upon prevailing market conditions.
The recent drill infill results indicate that, based on the present resource figures, the down dip extensions of FP Zone alone can now be considered to be an exploration target of some 2 million tonnes per 100m vertically. 

Kerr Anderson, Managing Director, said:

"The infill drilling on the Filon Principal Zone has been extremely successful and has returned impressive tungsten results. The consistency and grades have exceeded our expectations and will enhance the Project in terms of the increased production rate, the applicability of bulk underground mining methods and the flexibility to mine at different tungsten grades.

Ormonde, through its wholly owned Spanish subsidiary Saloro S.L., holds a 90% interest in the Barruecopardo Tungsten Project. Ormonde aims to benefit from the robust project economics, extensive resource upside potential and the low development capital cost requirements to become a leading low cost Western producer of tungsten in the near term.

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

WO3% (cut)*

Zone

BAR-49

173.0

19.0

13.5

0.45

0.29

FP

including

11.0

7.8

0.68

0.41

BAR-50

158.0

53.0

35.5

0.38

0.38

FP

including

158.0

11.0

7.4

0.46

0.46

including

3.0

2.0

1.26

1.26

and

175.0

12.0

8.0

0.72

0.72

including

4.0

2.7

1.78

1.78

and

197.0

14.0

9.4

0.43

0.43

including

7.0

4.7

0.61

0.61

BAR-51

95.0

1.0

0.7

0.23

0.23

FP

BAR-52

122.0

63.0

53.3

0.18

0.18

FP

including

122.0

12.0

10.1

0.24

0.24

including

5.0

4.2

0.40

0.40

and

144.0

10.0

8.4

0.36

0.36

and

170.0

15.0

12.7

0.28

0.28

including

10.0

8.4

0.34

0.34

BAR-53

53.0

11.0

8.4

0.15

0.15

FP

including

61.0

3.0

2.3

0.52

0.52

BAR-54

93.0

33.0

27.5

1.20

0.70

FP, F1, F2

including

82.0

3.0

2.5

1.52

1.52

FP

and

102.0

9.0

7.5

0.66

0.66

F1

and

119.0

7.0

5.8

4.08

1.73

F2

BAR-55

110.0

36.0

21.2

0.55

0.45

FP

including

126.0

20.0

11.8

0.85

0.68

Notes to table:

FP = Filon Principal Zone

F1, F2 = Footwall Zones as yet unclassified

* = using a top cut of 3.0% 

Notes on assay method:

Assays are reported using the fusion XRF method.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSEFWUSUSELF
Date   Source Headline
20th Aug 20091:01 pmRNSAGM Result
20th Jul 20093:09 pmRNSIssue of Equity
13th Jul 20097:00 amRNSLa Zarza Exploration Deal
30th Jun 200910:33 amRNSAnnual Report and Accounts
26th May 20097:00 amRNSPreliminary Results 2008
6th May 20092:01 pmRNSShareholder Notification
21st Apr 20097:00 amRNSTungsten Testwork
12th Jan 20097:00 amRNSDrilling Report
28th Oct 20087:00 amRNSDrilling Report
6th Oct 20087:00 amRNSDrilling Report
23rd Sep 20085:32 pmRNSShareholder Notification
22nd Sep 20087:00 amRNSInterim Results
22nd Jul 20087:00 amRNSIEX Notice
21st Jul 20085:16 pmRNSShareholder Notification
15th Jul 200811:15 amRNSIssue of Equity
17th Jun 20087:00 amRNSDrilling Report
12th Jun 20081:03 pmRNSResult of AGM
12th Jun 20087:00 amRNSOperational Update
13th May 20086:00 amRNSFinal Results
16th Apr 20087:00 amRNSBoard Appointment
1st Apr 20087:00 amRNSDrilling Report
26th Feb 20087:00 amRNSDrilling Update
6th Feb 20087:01 amRNSLa Zarza Feasibility Study
24th Jan 20087:01 amRNSTungsten Resource Update
10th Jan 20087:00 amRNSIEX Notice
4th Jan 20085:16 pmRNSAdditional Listing
6th Dec 20077:00 amRNSDrilling Report
5th Dec 20074:00 pmRNSDirectorate Change
4th Dec 20074:10 pmRNSHolding in Company
30th Nov 200712:30 pmRNSHolding in Company
30th Nov 20077:00 amRNSIEX Notice
28th Nov 20072:29 pmRNSHolding in Company
27th Nov 20077:00 amRNSEquity Fundraising
13th Nov 20077:01 amRNSTungsten Update
8th Nov 20077:01 amRNSDrilling Update
1st Nov 20077:01 amRNSDrilling Report
28th Sep 20074:27 pmRNSBrochure of Particulars
27th Sep 20077:02 amRNSTungsten Drilling Results
24th Sep 20077:01 amRNSInterim Results
17th Aug 20072:26 pmRNSAIM Rule 26
7th Aug 20077:01 amRNSDrilling Report
30th Jul 200710:20 amRNSHolding in Company
26th Jul 20073:25 pmRNSResults of AGM
17th Jul 200710:28 amRNSPlacing
12th Jul 20077:00 amRNSLa Zarza Update
26th Jun 20073:12 pmRNSDocument Availability
6th Jun 20077:00 amRNSIEX Notice
30th May 20075:38 pmRNSAdditional Listing
16th May 20077:01 amRNSPreliminary Results
15th May 20074:16 pmRNSHolding in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.