Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Results at Peralonso

23 Jan 2013 07:00

RNS Number : 1371W
Ormonde Mining PLC
23 January 2013
 

23 January 2013

Ormonde Mining plc

("Ormonde" or "the Company")

 

Positive Drilling Results at Peralonso, Salamanca

 

The Board of Ormonde is pleased to report further encouraging assay results from a second stage of drilling on the Peralonso Permit in the Salamanca Province of western Spain, which forms part of the joint venture with Aurum Mining plc.

 

A total of eight holes were drilled to test for near-surface extensions to the gold mineralisation identified in the first drilling (three holes) on the permit carried out in 2012. Results have now been received for six of these eight new holes, and indicate extensions at shallow depths of mineralised structures encountered in the original drilling.

 

Highlights

·; Drill hole PERDD005 has returned intervals of 6 metres grading 1.87 grams per tonne ("g/t") gold (from 75m depth) and 9.2 metres grading 2.09 g/t gold (from 99.8m depth)

·; Drill hole PERDD007 has returned 2 metres grading 10.18g/t gold (from 49m depth)

·; Drill hole PERDD009 has returned 18 metres grading 0.70g/t gold (from 40m depth)

·; Zones in holes PERDD005 and 007 show good correlation with that in hole PERDD001 from the first campaign which intersected 10 metres grading 3.39g/t gold.

 

 

A map showing the locations of these holes can be accessed by clicking here.

 

 

Kerr Anderson, Ormonde's Managing Director, said:

 

"The results from this recent drilling programme build on the success of last year's campaign, with further gold mineralisation of good grade and widths being identified. We await the results of the final holes to enable an initial interpretation of the two drilling programmes completed to-date at Peralonso."

 

 

Detail

 

Eight holes were drilled for a total of 991.1 metres, principally to test for near-surface strike and depth extensions to the mineralisation encountered during 2012 in the first ever drilling on the permit, which tested the shallow depth extent of gold mineralisation encountered in previous trenching within the area of an extensive gold-in-soil geochemical anomaly (400 x 400m). Results have been received for six of these eight holes and are reported below. Drilling to-date suggests that gold mineralisation is hosted within steeply-dipping altered zones within granites, characterised by quartz veining and breccias which exhibit multiple phases of brecciation. Interpretation will be carried out upon receipt of the results of the remaining holes.

 

 

Hole

Length (m)

Dip/Azimuth

From (m)

Thickness (m)

Gold (g/t)

PERDD004

100.0

-50o/290o

72.0

1.0

4.51

and

79.0

7.0

2.42

PERDD005

201.3

-50o/290o

32.0

1.0

0.89

and

68.0

1.0

0.88

and

75.0

6.0

1.87

and

99.8

9.2

2.09

and

150.0

1.0

0.82

and

164.0

1.0

2.68

and

171.0

2.0

1.24

PERDD006

125.5

-50o/290o

0.0

6.0

1.38

and

78.0

1.0

0.51

PERDD007

125.5

-50o/290o

49.0

2.0

10.18

PERDD008

89.5

-50o/290o

73.7

1.4

0.59

and

80.0

3.0

1.17

PERDD009

100.3

-50o/290o

40.0

18.0

0.70

and

63.0

1.0

0.52

 

Significant Intercepts using a 0.5g/t cut (1m minimum width of intercept and 4m maximum internal dilution)

 

 

Previous Campaign - Key Intercepts

 

Hole

Length (m)

Dip/Azimuth

From (m)

Thickness (m)

Gold (g/t)

PERDD001

126.1

-50o/288o

0

18.0

1.10

and

46.9

10.1

3.39

incl

46.9

1.1

22.7

and

109.1

14.95

2.33

incl

110.7

1.4

21.5

PERDD002

75.1

-50o/290o

8.9

5.3

1.12

 

 

True thicknesses are currently interpreted to be around 70% of the drilled thickness (interval).

 

 

Notes to table:

 

Sampling, Assaying and Quality Control Measures

 

All drill core has been routinely logged by an experienced geologist. Relevant core intervals were split in half by diamond saw, with half being sent for assay and the other half being retained in the core boxes for reference. Sampling is mainly carried out over one metre intervals.

 

Sample preparation and analyses were performed at ALS Chemex (Spain). Assays are reported using Fire Assay and AAS on a 50g sample.  Reference samples (blanks, duplicates and certified standards) are routinely included in each sample batch as quality control measures. In addition check assays are performed on selected mineralised samples.

 

Kerr Anderson PhD EurGeolPGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

 

 

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/en/investors/technical_glossary.

 

For more information please visit www.ormondemining.com or follow Ormonde on Twitter https://twitter.com/ormondemining or Linkedin http://www.linkedin.com/company/ormondemining-plc

 

 

Enquiries to:

 

Ormonde Mining plc

Kerr Anderson, Managing Director Tel: +353 (0)1 8253570

 

Bankside Consultants

Simon Rothschild Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

 

Murray Consultants

Ed Micheau Tel: +353 (0)1 4980300 Mob: +353 (0)86 803 7155

 

Davy (Nomad / ESM Adviser)

Eugenée Mulhern / Roland French Tel: +353 (0)1 6796363

 

 

ENDS

 

 

About Ormonde

Ormonde Mining Plc is admitted to trading on the AIM market in London & the ESM market in Dublin. Ormonde is a mineral development and exploration company focused on Spain (Ticker: ORM).

 

Ormonde's key activities include:

 

Barruecopardo Tungsten - Ormonde is developing a low cost mining operation at Barruecopardo to become a major, secure European supply of tungsten.

 

La Zarza Copper- polymetallic massive sulphide deposit in the prolific Iberian Pyrite Belt of southern Spain.

 

Gold Explorationin several highly prospective areas of western Spain which includes its joint venture agreement with Aurum Mining plc (AIM: AUR), where Ormonde currently has a 40% interest in the Pino de Oro project in the Zamora Province and a 46% interest in the Peralonso and Cabeza projects in Salamanca Province of western Spain. Ormonde is Manager of the Joint Venture.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGZMNZVGFZM
Date   Source Headline
5th Sep 20237:00 amRNSTrading on Aquis Growth Market
5th Sep 20237:00 amRNSCancellation - ORMONDE MINING PLC
4th Sep 20238:28 amRNSAdmission to Aquis Growth Market
25th Aug 20233:33 pmRNSResult of EGM & AGM
31st Jul 20236:26 pmRNSNotice of EGM & AGM
27th Jul 20236:19 pmRNSProposed Cancellation of Trading on AIM & Euronext
30th Jun 20236:27 pmRNSInvestment in TRU Precious Metals Corp.
27th Jun 20236:20 pmRNSFinal Results
8th Feb 20236:00 pmRNSOrmonde Mining
7th Feb 20237:30 amRNSSuspension - Ormonde Mining plc
7th Feb 20237:00 amRNSInvestment & Suspension of Listing
13th Jan 20234:40 pmRNSSecond Price Monitoring Extn
13th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Oct 202211:11 amRNSCompletion of Sale of La Zarza Assets
28th Sep 20221:15 pmRNSResult of AGM & EGM
28th Sep 20227:00 amRNSHalf-year Report
30th Aug 20223:24 pmRNSPublication of EGM Circular
29th Jul 20227:00 amRNSSale of La Zarza & Notice of EGM
27th Jun 20227:00 amRNSAnnual Report and Notice of Annual General Meeting
21st Jun 20227:00 amRNSFinal Results
24th Dec 20211:19 pmRNSHolding(s) in Company
30th Nov 20217:00 amRNSAppointment of CEO
19th Nov 20217:00 amRNSGrant of Options
4th Oct 20217:00 amRNSBoard Roles and Disclosures for New Directors
30th Sep 20213:29 pmRNSResult of AGM
23rd Sep 20217:00 amRNSHalf-year Report
31st Aug 20217:00 amRNSAGM Update
14th Jul 20217:00 amRNSAdjourned AGM
1st Jul 20214:40 pmRNSSecond Price Monitoring Extn
1st Jul 20214:35 pmRNSPrice Monitoring Extension
1st Jul 20212:05 pmRNSSecond Price Monitoring Extn
1st Jul 20212:00 pmRNSPrice Monitoring Extension
1st Jul 20219:50 amRNSAGM Update
29th Jun 20217:00 amRNSAGM - Director Requisitions
24th Jun 20214:40 pmRNSSecond Price Monitoring Extn
24th Jun 20214:35 pmRNSPrice Monitoring Extension
21st Jun 20217:00 amRNSAnnual Report & Notice of AGM
26th May 20217:00 amRNSHolding(s) in Company
26th May 20217:00 amRNSFinal Results
7th Apr 20219:05 amRNSSecond Price Monitoring Extn
7th Apr 20219:00 amRNSPrice Monitoring Extension
6th Apr 20214:41 pmRNSSecond Price Monitoring Extn
6th Apr 20214:35 pmRNSPrice Monitoring Extension
6th Apr 20212:43 pmRNSUpdate on Acquisition
23rd Mar 20214:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20214:36 pmRNSPrice Monitoring Extension
23rd Mar 20219:05 amRNSSecond Price Monitoring Extn
23rd Mar 20219:00 amRNSPrice Monitoring Extension
12th Mar 20215:00 pmRNSUpdate on Migration
3rd Mar 20214:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.