Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0225
Bid: 0.02
Ask: 0.025
Change: 0.0015 (7.14%)
Spread: 0.005 (25.00%)
Open: 0.021
High: 0.023
Low: 0.021
Prev. Close: 0.021
ORCP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Northern Zone: Improved Gold Recovery up to 94.7%

13 Jun 2022 07:00

RNS Number : 5623O
Oracle Power PLC
13 June 2022
 

13 June 2022

Oracle Power PLC

("Oracle" or the "Company")

 

 

Improved Gold Recovery of up to 94.7% Received from Further Positive Metallurgical Results

Northern Zone Gold Project

 

 

Oracle Power PLC (AIM:ORCP), the international natural resources project developer, is pleased to announce that further positive metallurgical results have been returned from the three samples from its 100% owned Northern Zone Gold Project, located 25km east of Kalgoorlie in Western Australia ("Northern Zone" or the "Project"). The samples were submitted to Nagrom in Perth for cyanidation bottle roll tests. The results indicate that an average gold recovery of 88% over 12 hours and 92.9% on average over 24 hours can be achieved from the three samples. The positive metallurgical results to date form the basis for a drill programme to define a maiden inferred JORC resource.

 

Highlights:

· Metallurgy results from the three samples include:

Drill head grade (average) of 0.79g/t Au

92.9% (average) of gold extraction after 24hr bottle roll from three samples

Very low copper content of 2ppm into solution

· An Exploration Target of 200-250Mt at 0.4-0.6g/t Au for 2.5-4.8Moz gold, has been generated based on results to date.

· Northern Zone is an Intrusion Related Gold System (IRGS) with wide gold mineralised felsic porphyry intrusions. This type of system can host significant ounces of gold, such as Boddington Goldmine (WA), Fort Knox (Alaska), Dublin Gulch (Yukon) and Timbarra (NSW).

· Diamond and reverse circulation drilling programme to define a maiden inferred JORC resource has been designed and is expected to be finalised in the coming weeks.

 

 

The first set of results previously announced (9 June 2022) indicated that good gold recoveries can be achieved within 6 hours of 83.3%, and up to 90.4% gold recovery over 72 hours. The results announced today (Table 1) utilise a set of conditions/parameters (Kinetics) based on the previous result, but changed to improve recoveries, with a maximum individual recovery from sample 2 of 94.7% after 24 hours, with an average recovery of 92.9% after 24 hours. Based on the previously announced Exploration Target of 200-250Mt at 0.4-0.6g/t Au for 2.5 to 4.8Moz Gold, these further positive metallurgical results form the basis for moving forward with drilling to define a maiden inferred JORC resource.

 

Naheed Memon, CEO of Oracle, commented:

 

"Further positive metallurgy and improved recovery results at Northern Zone from refining metallurgical conditions is a great result, with average gold recovery of 88% over 12 hours and 92.9% over 24 hours from the three samples submitted to Nagrom.

 

"As previously stated, we have defined a large exploration target of 2.5 to 4.8Moz gold and, with excellent potential gold recovery, this gives us the confidence to progress to the next step of confirming our belief in the tonnes and grade of the gold deposit. Northern Zone is a priority for the Company and is currently the main focus in Australia."

 

About Northern Zone Project:

The Northern Zone is comprised of one granted prospecting licence (P25/2651) which covers an area of 82 hectares. The Project is in an area highly prospective for gold and is approximately 25km east of Kalgoorlie, the home of the 'Super Pit' mine, the second largest gold mine in Australia.

 

Northern Zone Metallurgy Interpretation:

The first set of results previously announced (9 June 2022) indicated that gold recoveries can be achieved within 6 hours at 83.3%, and up to 90.4% gold recovery over 72 hours. The results announced today (Table 1) utilise a set of conditions/parameters (Kinetics) based on the previous result, but changed to improve recoveries, with a maximum individual recovery from sample 2 of 94.7% after 24 hours.

 

Extraction (%) Cyanidation Bottle Roll

Time

Sample 1 Gold

Sample 2 Gold

Sample 3 Gold

Average Gold Recovery

2 Hours

24.0%

12.8%

20.3%

19.0%

4 Hours

41.3%

30.7%

49.9%

40.6%

6 Hours

62.6%

51.2%

76.4%

63.4%

12 Hours

86.5%

87.0%

90.5%

88.0%

24 Hours

91.8%

94.7%

92.0%

92.9%

Sample Head Grade

0.9 g/t Au

0.54 g/t Au

0.93 g/t Au

Average Head Grade

0.79 g/t Au

Table 1: Metallurgical Cyanide Bottle Roll Test Results based on parameters and conditions selected from the first test results announced on 9 June 2022.

 

Geological Model and Exploration Target

The results of the drilling confirm the presence of gold mineralisation predominately within felsic units. The very low/subdued geochemical character of Northern Zone, with most elements below detection, (apart from gold) is consistent with other Intrusion Related Gold System (IRGS) deposits

 

At Northern Zone, based on drilling data and the multiple porphyry units interpreted over about 350 metres, with true widths up to ~150 metres, and depth extents greater than 250 metres, an Exploration Target* of 200-250Mt at 0.4-0.6g/t Au, with a range in gold ounces of 2.5Moz to 4.8Moz, has been identified.

 

* The potential quantity and grade of the Exploration Target is conceptual in nature and is therefore an approximation. There has been insufficient exploration drilling to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

 

Competent Persons Statement

The Information in this report that relates to exploration results, mineral resources or ore reserves is based on information compiled by Mr Edward Mead, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Mead is a consultant to the company and employed by Doraleda Pty Ltd. Mr Mead has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the `Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves' (the JORC Code). Mr Mead consents to the inclusion of this information in the form and context in which it appears in this report.

  

**ENDS**

 

For further information on Oracle Power PLC, visit the Company's website http://www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO +44 (0) 203 580 4314

 

Strand Hanson Limited (Nominated Adviser & Joint Broker)

Rory Murphy, Rob Patrick +44 (0) 20 7409 3494

 

St Brides Partners Limited (Financial PR)

Susie Geliher, Catherine Leftley +44 (0) 20 7236 1177

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation No. 596/2014, which forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018 (as amended).

 

About Oracle Power PLC:

 

Oracle Power PLC is an international natural resource and power project developer quoted on London's AIM market. The Company currently has two areas of focus: Western Australia and Pakistan. In Australia, its primary focus is the Northern Zone Gold Project, located 25km east of the major gold mining centre of Kalgoorlie, the home of the 'Super Pit' mine, the second largest gold mine in Australia. Northern Zone has a current Exploration Target of 200-250Mt at 0.4-0.6g/t Au for between 2.5 - 4.8Moz gold, with drilling being planned to define a maiden inferred JORC resource.

 

The Company is also active in the power industry in Pakistan and is working to establish a green hydrogen production facility through Oracle Energy Limited, a joint venture with His Highness Shaikh Ahmed Dalmook Al Maktoum. The Company's initial project is the Thar Block VI Project in south-east Pakistan where the Company is advancing plans for a combined lignite coal mine, a 1,320MW mine mouth power plant and a proposed coal gasification to urea project.

 

Glossary of Technical Terms:

 

Au

chemical symbol for gold

Bottle roll test

the industry standard first step in assessing the gold recovery possible by cyanide leaching.

g/t

grams per tonne

JORC

the Australasian Joint Ore Reserves Committee Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012, which sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves

Felsic

Igneous rocks that are relatively rich in elements that include feldspar and quartz

Moz

million ounces

Mt

million tonnes

oz

troy ounce (= 31.103477 grams)

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCBLLLFLQLXBBK
Date   Source Headline
12th Jul 20177:00 amRNSBoard Appointment
23rd Jun 20173:34 pmRNSResult of AGM and Change of Name
21st Jun 20177:00 amRNSPower Plant Environmental/Social Impact Assessment
8th Jun 201711:05 amRNSSecond Price Monitoring Extn
8th Jun 201711:00 amRNSPrice Monitoring Extension
8th Jun 20179:05 amRNSSecond Price Monitoring Extn
8th Jun 20179:00 amRNSPrice Monitoring Extension
8th Jun 20177:00 amRNSMarket Update
24th May 20171:35 pmRNSNotice of Annual General Meeting
10th May 201711:21 amRNSResults for the Year Ended 31 December 2016
9th Jan 20177:00 amRNSChina Pakistan Economic Corridor
5th Jan 20171:00 pmRNSHolding(s) in Company
21st Dec 20169:38 amRNSChange in registered office address
4th Oct 20167:00 amRNSBoard Changes
15th Sep 20169:39 amRNSHoldings in Company
14th Sep 20167:00 amRNSUNAUDITED INTERIM RESULTS FOR 6 MONTHS TO 30 JUNE
17th Jun 20167:00 amRNSDetermination of Feasibility Stage Coal Price
7th Jun 20166:08 pmRNSHolding(s) in Company
3rd Jun 20163:34 pmRNSStatement regarding Share Price Movement
22nd Apr 20162:58 pmRNSAppointment of Interim Chairman
20th Apr 20166:08 pmRNSResult of AGM
24th Mar 20169:26 amRNSHoldings in Company
21st Mar 20167:00 amRNSExtension of IRR arrangement
18th Mar 20167:00 amRNSResults for the Year Ended 31 December 2015
5th Nov 20157:00 amRNSLetter of No Objection on 600 MW Power Plant
16th Oct 20154:40 pmRNSSecond Price Monitoring Extn
16th Oct 20154:35 pmRNSPrice Monitoring Extension
12th Oct 20157:00 amRNSSigning of Consortium Agreement
24th Sep 20157:00 amRNSUnaudited Interim Results
11th Aug 20151:11 pmRNSAdmission of Coal Price Petition
4th Jun 20157:00 amRNSHolding(s) in Company
4th Jun 20157:00 amRNSHolding(s) in Company
20th May 20152:49 pmRNSResult of AGM
14th Apr 20157:00 amRNSFinal Results
17th Mar 20157:00 amRNSEXTENSION TO SEPCO EPC FRAMEWORK AGREEMENT
11th Mar 20157:00 amRNSChina-Pakistan Economic Corridor
25th Feb 20156:27 pmRNSCorrection: Result of General Meeting
25th Feb 201511:27 amRNSResult of General Meeting
23rd Feb 20157:00 amRNSMINING LEASE RESTORATION
9th Feb 20157:00 amRNSEquity Placing and Operational Update
6th Jan 20157:00 amRNSProgress Towards Reinstatement of Mining Lease
23rd Dec 20149:03 amRNSDiscussions with SEPCO continue
22nd Dec 20147:00 amRNSAppointment of Joint Broker
11th Dec 20147:00 amRNSMining Lease
25th Sep 20147:00 amRNSEPC Framework Agreement with SEPCO
23rd Sep 20147:00 amRNSInterim Results
16th Sep 20147:00 amRNSEquity Placing
21st May 20144:29 pmRNSResult of AGM
16th Apr 20147:00 amRNSResults for the Year ended 31 December 2013
17th Jan 201412:43 pmRNSMilestone development of Block VI, Thar Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.