Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrcadian Engy Regulatory News (ORCA)

Share Price Information for Orcadian Engy (ORCA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 10.875
Bid: 10.50
Ask: 11.25
Change: 0.00 (0.00%)
Spread: 0.75 (7.143%)
Open: 10.875
High: 10.875
Low: 10.875
Prev. Close: 10.875
ORCA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Pilot Technical Resource Upgrade

10 Jan 2023 07:00

RNS Number : 1578M
Orcadian Energy PLC
10 January 2023
 

 

 

 

10 January 2023

Orcadian Energy plc

("Orcadian Energy", "Orcadian" or the "Company")

 

Pilot Technical Resource Upgrade

 

Highlights

· Management has completed an update of their estimate of technically recoverable resources for the Pilot field

· Technically recoverable resources have increased 18% to 97 MMbbl for a P50 case based upon a polymer flood development scheme

· Comprehensive geophysical interpretation and geological and dynamic reservoir modelling work completed with support from Axis and TRACS

· Upside resource estimate for Pilot alone is now 131 MMbbl.

Summary

Orcadian's estimate of Pilot field resources was audited in a CPR by Sproule in 2021 and was included in the Company's Admission Document. Sproule assigned 78.8 MMbbl of 2P reserves to the project, 1P reserves were 58.5 MMbbl and 3P reserves were 110.5 MMbbl.

Since listing Orcadian has licensed and, with support from Axis, interpreted newly reprocessed seismic data over Pilot, which resulted in an uplift to the developed area oil-in-place. TRACS then constructed a range of geological realisations and the Orcadian team ran multiple dynamic reservoir simulations to establish a new range of technically recoverable resources. 

The multiple geological models were designed to incorporate the full range of heterogeneity that we see as possible across the Pilot field, and the new full-field reservoir models were then calibrated to the results of our polymer core flood experimental results. These models have been tested with a range of possibilities for multiple parameters and from that work the team have derived a statistical range of developed area recovery factors which is highly consistent with the range of recovery factors adopted by Sproule in the CPR. This convergence provides great confidence in the latest range of resource estimates as the estimates of recovery factor have been arrived at from two entirely different routes: a stochastic reservoir simulation approach (Orcadian management) and by comparison with analogue fields (Sproule).

 

The table below outlines the Management updated estimate of technically recoverable resources for the Pilot field:

Technically recoverable resources (i.e. before an economic cut-off) MMbbl

Sproule CPRTable 2

Orcadian management estimates

Uplift

Proven or P90

61.5

65.3

6.2%

Proven plus probable or P50

82.0

97.1

18.4%

Proven, probable plus possible or P10

112.8

131.0

16.1%

These new estimates incorporate the impact of optimised polymer dosages and can be directly compared with the technical recoverable resources noted in Table 2 of the Sproule CPR (see page 159 of the Company's Admission Document, available on the Company's website).

For clarity, these are management estimates, represent gross production from the field, and have not been audited by Orcadian's Competent Person. This resource update is SPE PRMS 2018 system compliant. The figures quoted are technically recoverable resources before the application of an economic cut-off which is required for the classification of these resources as reserves.

Steve Brown, Orcadian's CEO, commented:

"We are very pleased with the results of this updated resource estimate. This is the culmination of eighteen months of work, which started with the interpretation of the newly reprocessed seismic from TGS. Since then, working with TRACS, we have constructed multiple geological realisations and tested our development plan taking into account both downside scenarios as well as the exciting upside possibilities.

"A thorough understanding of the reservoir and how it will perform is the foundation of any sound development plan. We are confident that this work has not only given us that understanding, but will also provide an excellent basis for potential farm-in partners to evaluate the Pilot development in the coming months."

 

For further information on the Company please visit the Company's website: https://orcadian.energy

 

Qualified Person's Statement

Pursuant to the requirements of the AIM Rules and in particular, the AIM Note for Mining and Oil and Gas Companies, Maurice Bamford has reviewed and approved the technical information and resource reporting contained in this announcement. Maurice has more than 33 years' experience in the oil & gas industry and 3 years in academia. He holds a BSc in Geology from Queens University Belfast and a PhD in Geology from the National University of Ireland. Maurice is a Fellow of the Geological Society, London, and a member of the Petroleum Exploration Society of Great Britain. He is Exploration and Geoscience Manager at Orcadian Energy.

 

 

Contact:

 

Orcadian Energy plc

+ 44 20 7920 3150

Steve Brown, CEO

Alan Hume, CFO

WH Ireland (Nomad and Joint Broker)

+44 20 7220 1666

Katy Mitchell / Andrew de Andrade (Nomad)

Harry Ansell / Fraser Marshall (Corporate Broking)

 

Tavistock (PR)

+ 44 20 7920 3150

Nick Elwes / Simon Hudson

orcadian@tavistock.co.uk

Charlesbye (PR)

+ 44 7403 050525

Lee Cain / Lucia Hodgson

 

About Orcadian Energy

Orcadian is a North Sea focused, low emissions, oil and gas development company. In planning its Pilot development, Orcadian has selected wind power to transform oil production into a cleaner and greener process. The Pilot project is moving towards approval and will be amongst the lowest carbon emitting oil production facilities in the world, despite being a viscous crude. Orcadian may be a small operator, but it is also nimble, and the Directors believe it has grasped opportunities that have eluded some of the much bigger companies. As we strike a balance between Net Zero and a sustainable energy supply, Orcadian intends to play its part to minimise the cost of Net Zero and to deliver reliable organic energy.

Orcadian Energy (CNS) Ltd ("CNS"), Orcadian's operating subsidiary, was founded in 2014 and is the sole licensee of P2244, which contains 78.8 MMbbl of 2P Reserves in the Pilot discovery, and of P2320 and P2482, which contain a further 77.8 MMbbl of 2C Contingent Resources in the Elke, Narwhal and Blakeney discoveries (as audited by Sproule, see the CPR in the Company's Admission Document for more details). Within these licences there are also 191 MMbbl of unrisked Prospective Resources. These licences are in blocks 21/27, 21/28, 28/2 and 28/3, and lie 150 kms due East of Aberdeen. The Company also has a 50% working interest in P2516, which contains the Fynn discoveries. P2516 is administered by the Parkmead Group and covers blocks 14/20g and 15/16g, which lie midway between the Piper and Claymore fields, 180 kms due East of Wick.

Pilot, which is the largest oilfield in Orcadian's portfolio, was discovered by Fina in 1989 and has been well appraised. In total five wells and two sidetracks were drilled on Pilot, including a relatively short horizontal well which produced over 1,800 bbls/day on test. Orcadian's proposed low emissions, field development plan for Pilot is based upon a Floating Production Storage and Offloading vessel (FPSO), with over thirty wells to be drilled by a Jack-up rig through a pair of well head platforms and provision of power from a floating wind turbine.

Emissions per barrel produced are expected to be about a tenth of the 2021 North Sea average, and less than half of the lowest emitting oil facility currently operating on the UKCS. On a global basis this places the Pilot field emissions at the low end of the lowest 5% of global oil production.

 

 

Glossary

1P

Proven reserves

2P

Proven plus probable reserves

3P

Proven, probable and possible reserves

bbls/day

Barrels per day

2C

Mid case estimate of contingent resources

CPR

Competent Person's Report

FPSO

Floating Production, Storage and Offloading vessel

MMbbl

Million barrels

P10

10% probability of being exceeded, determined using probabilistic methods

P50

50% probability of being exceeded, determined using probabilistic methods

P90

90% probability of being exceeded, determined using probabilistic methods

PRMS

Petroleum Resources Management System

SPE

Society of Petroleum Engineers

UKCS

United Kingdom Continental Shelf

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUKAWROKUARAR
Date   Source Headline
8th Apr 20242:46 pmRNSHolding(s) in Company
8th Apr 20242:44 pmRNSHolding(s) in Company
4th Apr 202411:03 amRNSInvestor Presentation via Investor Meet Company
2nd Apr 20247:00 amRNSCompletion of Pilot Farm-out
18th Mar 20247:00 amRNSChange of Nominated Adviser and Broker
14th Mar 202411:04 amRNSAmendment to Facility Agreement
27th Feb 20247:00 amRNSResults for the half year ended 31 December 2023
1st Feb 20247:00 amRNS33rd Licensing Round Offer of Awards
17th Jan 202412:45 pmRNSResult of General Meeting & Annual General Meeting
15th Jan 20242:56 pmRNSHolding(s) in Company
12th Jan 202410:57 amRNSHolding(s) in Company
20th Dec 20237:00 amRNSCirc re. Disposal & Notice of GM
18th Dec 20237:15 amRNS£500,000 equity financing & TVR
18th Dec 20237:02 amRNS33rd Licensing Round Update
18th Dec 20237:00 amRNSFinal Results
8th Dec 20237:00 amRNSInvestor Presentation via Investor Meet Company
7th Dec 202311:12 amRNSPilot Farm-out Deal and Partnership with Ping
1st Dec 20237:00 amRNSPilot Farm-out Update
7th Nov 20237:28 amRNSAnnual Licensing Rounds
25th Oct 20237:00 amRNSTwo Year Pilot Licence Extension
23rd Oct 20237:00 amRNSLock-in agreement
2nd Oct 20237:00 amRNS£350,000 equity financing & Update of 33rd Round
21st Sep 202312:37 pmRNSPDMR Update
19th Sep 20237:00 amRNSInvestor Presentation via Investor Meet Company
18th Sep 20237:00 amRNSProposed Farm-in to the Pilot Project
13th Sep 20231:32 pmRNSAmendment to Facility Agreement
23rd Aug 20237:00 amRNSAmendment to Facility Agreement
2nd Aug 202312:06 pmRNSShare Price Movement Update
1st Aug 20237:00 amRNSHolding(s) in Company
15th May 20237:00 amRNSDetermination of Licence P2320
30th Mar 20237:00 amRNSResults for the half year ended 31 December 2022
22nd Mar 20239:05 amRNSSecond Price Monitoring Extn
22nd Mar 20239:00 amRNSPrice Monitoring Extension
9th Mar 20234:35 pmRNSPrice Monitoring Extension
2nd Feb 202311:05 amRNSSecond Price Monitoring Extn
2nd Feb 202311:00 amRNSPrice Monitoring Extension
2nd Feb 20239:05 amRNSSecond Price Monitoring Extn
2nd Feb 20239:00 amRNSPrice Monitoring Extension
1st Feb 20234:40 pmRNSSecond Price Monitoring Extn
1st Feb 20234:35 pmRNSPrice Monitoring Extension
1st Feb 20232:05 pmRNSSecond Price Monitoring Extn
1st Feb 20232:00 pmRNSPrice Monitoring Extension
1st Feb 202311:05 amRNSSecond Price Monitoring Extn
1st Feb 202311:00 amRNSPrice Monitoring Extension
1st Feb 202310:01 amRNSResult of Placing
1st Feb 20237:00 amRNSProposed Placing to raise approximately £0.5m
19th Jan 20237:00 amRNS33rd Offshore Licensing Round
17th Jan 20231:05 pmRNSResult of Annual General Meeting
11th Jan 20237:00 amRNSProposed Disposal of Crinan and Dandy discoveries
10th Jan 20237:00 amRNSPilot Technical Resource Upgrade

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.