Cambay Workover Update

8 Dec 2015 07:00

RNS Number : 2844I
Oilex Ltd
08 December 2015
 



ASX Announcement

 

8 December 2015

 

ASX: OEX

AIM: OEX

 

Cambay Workover Update

 

l Cambay-77H gas is being sold at a peak rate exceeding 110 boepd, via Cambay-73 facilities

l Cambay-19z oil production ~12 bopd plus associated gas

l Cambay-20 Hydraulic Lift Pump (HLP) installed

Oilex Ltd is pleased to provide the following workover update:

Production from the Cambay Field is now ~75 boepd and may increase in line with demand from the local low pressure gas market now that Cambay-77H is online.

Cambay-77H

The Cambay-77H workover is complete and, based upon cumulative production since restarting the well, is now averaging ~51boepd via the flowline connection to Cambay-73 facilities. The well is producing through a 1/64 inch choke and the tubing head pressure is ~2,600 psig and steady. Production from Cambay-77H is meeting the demand from the local low pressure gas market, including a peak demand rate of ~0.500MMscfd for ~1 hour period that occurs twice daily. At peak demand, gas is being sold from Cambay-77H at greater than 110boepd using the average condensate to gas ratio (CGR) of ~55bbls/MMscf since restarting the well.

The well performance is being closely monitored subsequent to recommencing production and a fuller understanding of its deliverability potential will be gained from ongoing production. Although demand for local gas fluctuates according to peak demand times as noted above, it is anticipated that overall gas demand from the local low pressure gas market may gradually increase now that Cambay-77H is online. An increase in the market overall will be dependent on successful marketing efforts in India. This marketing is underway.

As anticipated, the newly installed production tubing has improved the flow performance of the well compared to flowback and testing operations during 2014. The workover rig installed the production tubing without having to kill the well, this is believed to be the first time this activity has been successfully accomplished in a horizontal multi-stage frac'd well in India.

Cambay-19z

Cambay-19z is now producing oil at ~12 bopd plus associated gas from the Eocene (EP IV) formation, and is within expectations. The associated gas is used at site to power the pump. The operation to reposition the downhole pump has been successful. The well has also been fitted with a chemical injection system to improve flow performance. Cambay-19z is located approximately 1.4 km to the west of Cambay-77H.

Cambay-20

Installation of the HLP unit and downhole pump is complete and pumping out of the brine has commenced. Gas has been detected at surface in a similar manner to Cambay-19z. Cambay-20 has previously been an intermittent oil and gas producer without using a downhole pump. It is located approximately 200 metres from Cambay-77H and associated gas not used to power the pump is transmitted to the Cambay-73 gas treatment facilities.

   

Other potential workover candidates

The future possible workover list has ~ 6 new candidates for consideration. As previously announced, subject to ongoing discussions with our Joint Venture Partner regarding cashcall payments, a decision will be made in relation to further workovers after the Cambay-60 workover is complete.

 

Managing Director of Oilex, Ron Miller, said;

"The Cambay workover campaign continues to deliver positive results with oil production from Cambay-19z meeting expectations and the deliverability of Cambay-77H gas production enhanced with successful installation of the production tubing. Overall, in relation to the Cambay Field, Oilex is now focussing on its objective of achieving a production rate target of ~150 boepd."

 

For and on behalf of Oilex Ltd

Ron Miller

Managing Director

 

For further information, please contact:

 

Investor Enquiries

Oilex Ltd

Ron Miller

Managing Director

Email: oilex@oilex.com.au

Tel: +61 8 9485 3200

Australia

Nominated Adviser

Strand Hanson Limited

Nominated Adviser

Rory Murphy/Ritchie Balmer

Email: oilex@strandhanson.co.uk

Tel: +44 20 7409 3494

UK

 

Media Enquires

Vigo Communications

Public Relations UK

Patrick d'Ancona/Chris McMahon

Email: patrick.dancona@vigocomms.com

chris.mcmahon@vigocomms.com

Tel: +44 20 7016 9570

UK

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUWUARVUAURRA
Date   Source Headline
26th Nov 20097:00 amPRNTimor Sea Drilling Update - Lore-1 Well
23rd Nov 20097:00 amPRNSection 708 Notice
20th Nov 20099:47 amPRNOILEX SPUDS FIRST TIMOR SEA WELL
20th Nov 20097:00 amPRNSection 708 Notice
20th Nov 20097:00 amPRNNotice of Change of Interests of Substantial Holder
19th Nov 20098:34 amPRNAppendix 3B
16th Nov 20097:00 amPRNResults of General Meeting - 16 November 2009
11th Nov 20097:00 amPRNOilex Mobilises Rig for Timor Sea Drilling
4th Nov 20097:14 amPRNExpiration of Unlisted Options
2nd Nov 20097:00 amPRNSection 708 Notice
29th Oct 20097:00 amPRNShare Placement - Allotment of Further Tranche 1 Shares
27th Oct 20097:00 amPRNAppendix 3B
26th Oct 20099:26 amPRNQuarterly Report to Shareholders 30 September 09
23rd Oct 20097:48 amPRNAnnual Report 30 June 2009
23rd Oct 20097:39 amPRNNotice of Annual General Meeting 26 November 2009
16th Oct 20097:47 amPRNNotice of General Meeting 16 November 2009
16th Oct 20097:00 amPRNOilex Operations Update October 2009
16th Oct 20097:00 amPRNOilex Raises $10 Million to Fund Exploration
14th Oct 20097:58 amPRNOilex Ltd Trading Halt
25th Sep 20097:00 amPRNOilex Secures Drilling Rig for Two Wells in Timor Sea
22nd Sep 20097:00 amPRNOilex Annual Report 2009
21st Sep 200910:42 amPRNOilex 2009 Annual Report
1st Sep 20097:00 amPRNAppendix 3B
1st Sep 20097:00 amPRNOilex Presentation - RIU Good Oil Conference 1 Sept 09
28th Aug 20097:00 amPRNOilex Timor Sea Farmout Goes Unconditional
18th Aug 20099:52 amPRNAppendix 3B
10th Aug 20097:00 amPRNKey Condition of Timor Sea Farm Out Satisfied
3rd Aug 20097:01 amPRNOILEX SECURES FARM-OUT OF KEY TIMOR SEA BLOCK
23rd Jul 200910:29 amPRNAppendix 5B
22nd Jul 20099:40 amPRNOperations Report for the Quarter to 30 June 2009
1st Jul 20099:31 amPRNAppendix 3X - 2 and AIM Attachment
1st Jul 20097:00 amPRNOilex Announces New Board Appointments
5th Jun 20097:04 amPRNTermination of Rig Contract for JPDA Wells - Timor Sea
3rd Jun 20099:36 amPRNAppendix 3B
26th May 20097:00 amPRNWest Kampar PSC - Indonesian Press Articles
19th May 20097:00 amPRNBoardroom Radio Broadcast - JPDA, India and Indonesia
8th May 20097:00 amPRNAppendix 3Y
8th May 20097:00 amPRNInvestment Report - Hartleys
7th May 20097:00 amPRNCambay-75 Operations Report - Gujarat India
5th May 20097:00 amPRNCambay-75 Operations Report - Gujarat, India
1st May 20097:00 amPRNOilex Company Secretary
30th Apr 20099:48 amPRNQuarterly Report to Shareholders 31 March 2009
17th Apr 20097:00 amPRNCambay 75 Operations Report - Gujarat India
9th Apr 20097:00 amPRNOperations Update Cambay - Cambay-75 Drilling Update
8th Apr 20097:00 amPRNBoardroomRadio Large Volume Prospects Timor Sea
7th Apr 20097:00 amPRNLarge Volume Prospects in Timor Sea Confirmed
26th Mar 20097:44 amPRNAppendix 3Y
20th Mar 20097:30 amPRNExploration Permit EPP27 Offshore South Australia
11th Mar 20097:00 amPRNAl Jumd Test Result - Block 56 Oman
25th Feb 20097:00 amPRNAl Jumd Test Program - Block 56 Oman

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.