Cambay Workover Update

8 Dec 2015 07:00

RNS Number : 2844I
Oilex Ltd
08 December 2015
 



ASX Announcement

 

8 December 2015

 

ASX: OEX

AIM: OEX

 

Cambay Workover Update

 

l Cambay-77H gas is being sold at a peak rate exceeding 110 boepd, via Cambay-73 facilities

l Cambay-19z oil production ~12 bopd plus associated gas

l Cambay-20 Hydraulic Lift Pump (HLP) installed

Oilex Ltd is pleased to provide the following workover update:

Production from the Cambay Field is now ~75 boepd and may increase in line with demand from the local low pressure gas market now that Cambay-77H is online.

Cambay-77H

The Cambay-77H workover is complete and, based upon cumulative production since restarting the well, is now averaging ~51boepd via the flowline connection to Cambay-73 facilities. The well is producing through a 1/64 inch choke and the tubing head pressure is ~2,600 psig and steady. Production from Cambay-77H is meeting the demand from the local low pressure gas market, including a peak demand rate of ~0.500MMscfd for ~1 hour period that occurs twice daily. At peak demand, gas is being sold from Cambay-77H at greater than 110boepd using the average condensate to gas ratio (CGR) of ~55bbls/MMscf since restarting the well.

The well performance is being closely monitored subsequent to recommencing production and a fuller understanding of its deliverability potential will be gained from ongoing production. Although demand for local gas fluctuates according to peak demand times as noted above, it is anticipated that overall gas demand from the local low pressure gas market may gradually increase now that Cambay-77H is online. An increase in the market overall will be dependent on successful marketing efforts in India. This marketing is underway.

As anticipated, the newly installed production tubing has improved the flow performance of the well compared to flowback and testing operations during 2014. The workover rig installed the production tubing without having to kill the well, this is believed to be the first time this activity has been successfully accomplished in a horizontal multi-stage frac'd well in India.

Cambay-19z

Cambay-19z is now producing oil at ~12 bopd plus associated gas from the Eocene (EP IV) formation, and is within expectations. The associated gas is used at site to power the pump. The operation to reposition the downhole pump has been successful. The well has also been fitted with a chemical injection system to improve flow performance. Cambay-19z is located approximately 1.4 km to the west of Cambay-77H.

Cambay-20

Installation of the HLP unit and downhole pump is complete and pumping out of the brine has commenced. Gas has been detected at surface in a similar manner to Cambay-19z. Cambay-20 has previously been an intermittent oil and gas producer without using a downhole pump. It is located approximately 200 metres from Cambay-77H and associated gas not used to power the pump is transmitted to the Cambay-73 gas treatment facilities.

   

Other potential workover candidates

The future possible workover list has ~ 6 new candidates for consideration. As previously announced, subject to ongoing discussions with our Joint Venture Partner regarding cashcall payments, a decision will be made in relation to further workovers after the Cambay-60 workover is complete.

 

Managing Director of Oilex, Ron Miller, said;

"The Cambay workover campaign continues to deliver positive results with oil production from Cambay-19z meeting expectations and the deliverability of Cambay-77H gas production enhanced with successful installation of the production tubing. Overall, in relation to the Cambay Field, Oilex is now focussing on its objective of achieving a production rate target of ~150 boepd."

 

For and on behalf of Oilex Ltd

Ron Miller

Managing Director

 

For further information, please contact:

 

Investor Enquiries

Oilex Ltd

Ron Miller

Managing Director

Email: oilex@oilex.com.au

Tel: +61 8 9485 3200

Australia

Nominated Adviser

Strand Hanson Limited

Nominated Adviser

Rory Murphy/Ritchie Balmer

Email: oilex@strandhanson.co.uk

Tel: +44 20 7409 3494

UK

 

Media Enquires

Vigo Communications

Public Relations UK

Patrick d'Ancona/Chris McMahon

Email: patrick.dancona@vigocomms.com

chris.mcmahon@vigocomms.com

Tel: +44 20 7016 9570

UK

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUWUARVUAURRA
Date   Source Headline
18th Jan 20138:05 amRNSIssue of Equity
18th Jan 20137:00 amRNSASX Price & Volume Query
7th Jan 20137:32 amRNSAppendix 3B
31st Dec 20127:00 amRNSAppendix 3B
20th Dec 20128:17 amRNSAppendix 3B
10th Dec 20127:00 amRNSLetter to Shareholders
3rd Dec 20127:00 amRNSChange to Board and Executive Management
19th Nov 20128:45 amRNSAppendix 3Z
19th Nov 20128:44 amRNSAppendix 3Y
19th Nov 20127:00 amRNSAppendix 3B
15th Nov 20128:27 amRNSResult of AGM 14 November 2012
14th Nov 20128:58 amRNSOilex Annual General Meeting Presentation
14th Nov 20128:32 amRNSChairman's Review
31st Oct 20127:00 amRNSQuarterly Report to Shareholders 30 September 2012
29th Oct 20127:00 amRNSChange of Name of Joint Broker
29th Oct 20127:00 amRNSChange of Name of AIM Joint Broker
25th Oct 20127:00 amRNSCambay Operations Update
22nd Oct 20127:00 amRNSOilex appoints General Manager Operations - India
10th Oct 20127:03 amRNS2012 Annual Report to Shareholders
10th Oct 20127:03 amRNSNotice of AGM - 14 November 2012
21st Sep 20127:22 amRNSAppendix 3B
17th Sep 20127:47 amRNSAppendix 3B
17th Sep 20127:39 amRNSAppendix 3Z
13th Sep 201211:19 amRNSFinancial Report for Year Ended 30 June 2012
10th Sep 20127:00 amRNSBoard & Executive Management Changes
7th Sep 20127:00 amRNSAppendix 3B
7th Sep 20127:00 amRNSAppendix 3Y
7th Sep 20127:00 amRNSResults of General Meeting - 7 September 2012
7th Sep 20127:00 amRNSOilex General Meeting Presentation September 2012
3rd Sep 20127:11 amRNSClosure of Entitlement Offer & Shortfall Notice
16th Aug 20127:55 amRNSDispatch of Prospectus
15th Aug 20127:27 amRNSUpdate on Trading in Entitlements on AIM
9th Aug 20128:05 amRNSNotice of General Meeting - 7 September 2012
6th Aug 201210:28 amRNSProspectus Notification Letters
6th Aug 20129:28 amRNSEntitlement Offer Prospectus
6th Aug 20127:42 amRNSAppendix 3B
2nd Aug 20127:00 amRNSOilex Announces Capital Raising
31st Jul 20127:34 amRNSQuarterly Report to Shareholdes - 30 June 2012
30th Jul 20127:00 amRNSVoluntary Suspension - ASX
26th Jul 20127:00 amRNSTrading on ASX
24th Jul 20127:00 amRNSAppointment - Chief Operating Officer
24th Jul 20127:00 amRNSInvestor Presentation - July 2012
23rd Jul 20127:51 amRNSChange of Office Address
2nd Jul 20127:26 amRNSAppendix 3Y
2nd Jul 20127:25 amRNSAppendix 3B
27th Jun 20127:00 amRNSCambay and Timor Sea Operations Update
30th May 20127:00 amRNSAppointment of Joint UK AIM Broker
25th May 20127:00 amRNSOilex - Status Cambay Field
14th May 20128:08 amRNSAppendix 3B
8th May 20127:00 amRNSCambay-76H Well Operations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.