Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Simiti Formation Fracturing Update

31 Jul 2014 07:00

RNS Number : 8081N
Global Energy Development PLC
31 July 2014
 

Immediate Release 31 July 2014

GLOBAL ENERGY DEVELOPMENT PLC

(the "Company" or "Global")

 

 

SIMITI FORMATION FRACTURING UPDATE - BOLIVAR CONTRACT AREA

 

Global Energy Development PLC, the Latin America focused petroleum exploration, development and production company (AIM: GED) with operations in Colombia, South America, announces an update on the operations of the Catalina #1 Simiti formation in the Company's Bolivar Association Contract located in the northern section of the Magdalena Valley in Colombia, South America.

 

The Catalina 1 well was stimulated using 27,000 barrels of water pumped into the Simiti formation. Upon completion of the process, the stimulation fluids initially began to flow back from the formation into the wellbore at high rates but quickly declined. Currently, approximately 6,750 barrels of the injected fluid has been recovered. The Company has obtained useful information from the testing process, as follows:

 

· The crude oil recovered demonstrated light oil gravity ranging between 28 and 30 API.

 

· Pressure build-up analysis confirmed higher than normal reservoir pressure within the formation with a gradient of .52 psi per foot which is above the normal gradient of .465 psi per foot.

 

· Production tests indicated low productivity of between 75 barrels of fluid per day (bfpd) to 125 bfpd in the Simiti formation.

 

· Both low pressure and high pressure post-stimulation injectivity tests were performed. The low pressure test was three times the injectivity of the high pressure test, indicating favorable permeability in the Simiti formation. This is consistent with actual stimulation data which demonstrated higher permeability and natural fracture frequency than original engineering estimates, completed prior to stimulation operations. The higher formation permeability was further confirmed by the constant rate of injection and pressure throughout the stimulation process. Such high levels of preexisting permeability are believed to have allowed the stimulation water to scour the formation of the existing oil saturation and push it away from the wellbore.

 

All of this information has been used to analyse the cause of the low rate of fluid recovery from the Simiti which the Company has diagnosed as being caused by the presence of an emulsion substantially blocking most reservoir fluids from reaching the wellbore. The use of sand in the stimulation process is likely to have collected at the oil-water interface and acted as the agent to create the emulsion. The Company is currently working to remove this blockage by inducing pressure surges within the formation, in order to form a corridor to allow oil to pass through the emulsion. This process should ultimately cause the emulsion to break to allow fluids, both oil and water, to pass into the well at higher rates. If the surging process is not effective in removing the emulsion blockage, the Company will consider other techniques for dealing with the emulsion, including a work over of the well to chemically remove the emulsion.

 

Steve Voss, Global's Managing Director, commented, "The Company remains very optimistic that oil exists within the Simiti reservoir and can be produced at economic rates. We will continue to apply the two methods discussed to remove the emulsion blockage which is currently preventing higher production rates, and we hope to have an update on our progress on this activity in August We have learned valuable information from this test well that will benefit the remainder of our development project at Bolivar."

 

 

For further information please contact

Global Energy Development PLC

Anna Williams, Finance Director

+001 817 310 0240

awilliams@globalenergyplc.com

www.globalenergyplc.com

Northland Capital Partners Limited

Louis Castro

+44 (0)20 7382 1100

Lauren Kettle

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKKDQKBKBQON
Date   Source Headline
4th Mar 20117:00 amRNSReserve Report
4th Feb 20117:00 amRNSExtension Of Loan Agreement
31st Jan 20117:00 amRNSTotal Voting Rights
20th Jan 20117:00 amRNSStrategy Update and Nomination
17th Jan 20117:00 amRNSPurchase and Cancellation of Loan Notes
13th Dec 20107:00 amRNSFarm-Out Agreement
12th Oct 20101:01 pmRNSInterim Report
12th Oct 20107:00 amRNSOperating Update
16th Sep 20107:00 amRNSInterim Results
15th Sep 20107:00 amRNSLoan Agreement
30th Jul 20107:00 amRNSContract Relinquishment
15th Jul 20107:00 amRNSOperations Update
9th Jul 20107:00 amRNSDirector Shareholding
30th Jun 20107:00 amRNSDirector Shareholding
15th Jun 20107:00 amRNSWell Testing Result
28th May 20107:00 amRNSWell Testing Update
14th May 20104:26 pmRNSResult of AGM
19th Apr 201010:00 amRNSAdvisory Board
19th Apr 20109:30 amRNSPosting Of Annual Report And Accounts
6th Apr 20107:00 amRNSAppointment
29th Mar 20107:00 amRNSWell Spudded
11th Mar 20107:00 amRNSThree Year Plan
11th Mar 20107:00 amRNSFinal Results
10th Mar 20107:00 amRNSRig Mobilisation
12th Feb 20107:00 amRNSRig Contract
3rd Feb 20107:00 amRNSNew Reserve Report
24th Sep 20095:23 pmRNSPosting of Interim Report
3rd Sep 20097:00 amRNSInterim Results
27th Jul 20097:00 amRNSAcquisition of Seismic
30th Jun 20093:52 pmRNSUpdate to Total Voting Rights
19th May 200912:06 pmRNSAnnual Report & Accounts
20th Apr 20097:00 amRNSFinal Results
30th Mar 20097:00 amRNSChange of Adviser
17th Feb 20097:00 amRNSOperations Update
30th Jan 20097:00 amRNSDirectorate Change
19th Dec 20082:50 pmRNSShare Option Grant
7th Nov 20083:41 pmRNSDirector Shareholding
7th Nov 20083:38 pmRNSChange of Nomad
9th Oct 20082:10 pmRNSChange of Adviser Name
2nd Oct 20087:00 amRNSEnvironmental Approval
22nd Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSWell Test Result
27th Aug 20087:00 amRNSWell Test Result
8th Aug 20087:00 amRNSWell Test Result
6th Aug 200812:01 pmRNSNotifiable Interest
4th Aug 20087:00 amRNSWell Test Result
16th Jul 20089:44 amRNSShare Option Grant
2nd Jul 20084:35 pmRNSResult of AGM
2nd Jul 20087:00 amRNSAGM Update
1st Jul 200812:03 pmRNSNotifiable Interest

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.