The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Simiti Formation Fracturing Update

31 Jul 2014 07:00

RNS Number : 8081N
Global Energy Development PLC
31 July 2014
 

Immediate Release 31 July 2014

GLOBAL ENERGY DEVELOPMENT PLC

(the "Company" or "Global")

 

 

SIMITI FORMATION FRACTURING UPDATE - BOLIVAR CONTRACT AREA

 

Global Energy Development PLC, the Latin America focused petroleum exploration, development and production company (AIM: GED) with operations in Colombia, South America, announces an update on the operations of the Catalina #1 Simiti formation in the Company's Bolivar Association Contract located in the northern section of the Magdalena Valley in Colombia, South America.

 

The Catalina 1 well was stimulated using 27,000 barrels of water pumped into the Simiti formation. Upon completion of the process, the stimulation fluids initially began to flow back from the formation into the wellbore at high rates but quickly declined. Currently, approximately 6,750 barrels of the injected fluid has been recovered. The Company has obtained useful information from the testing process, as follows:

 

· The crude oil recovered demonstrated light oil gravity ranging between 28 and 30 API.

 

· Pressure build-up analysis confirmed higher than normal reservoir pressure within the formation with a gradient of .52 psi per foot which is above the normal gradient of .465 psi per foot.

 

· Production tests indicated low productivity of between 75 barrels of fluid per day (bfpd) to 125 bfpd in the Simiti formation.

 

· Both low pressure and high pressure post-stimulation injectivity tests were performed. The low pressure test was three times the injectivity of the high pressure test, indicating favorable permeability in the Simiti formation. This is consistent with actual stimulation data which demonstrated higher permeability and natural fracture frequency than original engineering estimates, completed prior to stimulation operations. The higher formation permeability was further confirmed by the constant rate of injection and pressure throughout the stimulation process. Such high levels of preexisting permeability are believed to have allowed the stimulation water to scour the formation of the existing oil saturation and push it away from the wellbore.

 

All of this information has been used to analyse the cause of the low rate of fluid recovery from the Simiti which the Company has diagnosed as being caused by the presence of an emulsion substantially blocking most reservoir fluids from reaching the wellbore. The use of sand in the stimulation process is likely to have collected at the oil-water interface and acted as the agent to create the emulsion. The Company is currently working to remove this blockage by inducing pressure surges within the formation, in order to form a corridor to allow oil to pass through the emulsion. This process should ultimately cause the emulsion to break to allow fluids, both oil and water, to pass into the well at higher rates. If the surging process is not effective in removing the emulsion blockage, the Company will consider other techniques for dealing with the emulsion, including a work over of the well to chemically remove the emulsion.

 

Steve Voss, Global's Managing Director, commented, "The Company remains very optimistic that oil exists within the Simiti reservoir and can be produced at economic rates. We will continue to apply the two methods discussed to remove the emulsion blockage which is currently preventing higher production rates, and we hope to have an update on our progress on this activity in August We have learned valuable information from this test well that will benefit the remainder of our development project at Bolivar."

 

 

For further information please contact

Global Energy Development PLC

Anna Williams, Finance Director

+001 817 310 0240

awilliams@globalenergyplc.com

www.globalenergyplc.com

Northland Capital Partners Limited

Louis Castro

+44 (0)20 7382 1100

Lauren Kettle

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKKDQKBKBQON
Date   Source Headline
3rd Feb 20127:00 amRNSBOLIVAR PROJ-CATALINA #1 SIMITI FORMATION UPDATE
1st Feb 20127:00 amRNSLong Term Financing Update
30th Jan 20127:00 amRNSChops Technology
17th Jan 20127:00 amRNSTORCAZ 5 PROGRESSING
10th Jan 20127:00 amRNSAssignment Of Peru Block 95 Completed
30th Dec 20117:00 amRNSEXERCISE OF OPTIONS
15th Dec 20117:00 amRNSREDUCTION IN CONVERTIBLE DEBT OBLIGATIONS
7th Nov 20117:00 amRNSDevelopment Plans Update
19th Oct 20117:00 amRNSEarly Redemption Of Debt Obligation
18th Oct 20117:00 amRNSDIRECTOR SHAREHOLDING
17th Oct 20117:00 amRNSChange of Adviser
14th Oct 201110:28 amRNSDIRECTOR SHAREHOLDING
3rd Oct 20117:00 amRNSAnnouncement of Acceptance Levels&Closing of Offer
3rd Oct 20117:00 amRNSDevelopment Plans Update
29th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
26th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
14th Sep 20112:48 pmRNSForm 8.3 - [Global Energy Development Plc]
14th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
13th Sep 20112:47 pmRNSForm 8.3 - [Global Energy Development Plc]
13th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
9th Sep 20114:41 pmRNSInterim Report
9th Sep 20113:31 pmRNSPosting of Offer Document
6th Sep 20117:00 amRNSInterim Results
5th Sep 20117:00 amBUSForm 8.3 - Global Energy Development Plc
31st Aug 20112:44 pmRNSUpdate on Cash Offer
31st Aug 201110:36 amRNSForm 8 (DD) - Global Energy Development PLC
24th Aug 20112:52 pmRNSForm 8.3 - [Global Energy Devlopment Plc]
24th Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
22nd Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
15th Aug 20117:00 amBUSForm 8.3 - Global Energy Development Plc
11th Aug 20112:05 pmRNSForm 8.3 - [Global Energy Development Plc]
29th Jul 20117:00 amRNSPeru Block 95 Update
15th Jul 20117:00 amRNSPostponement of posting of Offer Document
1st Jul 20119:59 amRNSForm 8.3 - Global Energy Development PLC
30th Jun 201112:02 pmRNSPublic Opening Position Disclosure
28th Jun 20113:25 pmRNSResult of AGM
27th Jun 20112:49 pmRNSDIRECTOR SHAREHOLDING
20th Jun 20117:00 amRNSProduction rates increase
17th Jun 20114:15 pmRNSPOSTING OF OFFER ANNOUNCEMENT
17th Jun 20112:19 pmRNSForm 8.3 - [Global Energy Development Plc]
17th Jun 201110:23 amRNSPublic Opening Position Disclosure
16th Jun 20119:07 amRNSCash Offer
8th Jun 20117:00 amRNS100% Increase in Product Uplift
24th May 20117:00 amRNSAcquisition of New 3d Seismic - Bocachico
20th May 20117:00 amRNSPosting of Annual Report and Accounts
20th Apr 20117:00 amRNSAcquisition of New 3d Seismic - Bolivar
18th Apr 20117:00 amRNSAppt of Adviser and Change of Registered Office
12th Apr 20114:05 pmRNSExercise of Options and Director Shareholding
24th Mar 20117:00 amRNSAudited Final Results
14th Mar 20117:00 amRNSPERSONNEL CHANGE AND APPOINTMENTS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.