The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Simiti Formation Fracturing Update

30 Jun 2014 07:00

RNS Number : 8303K
Global Energy Development PLC
30 June 2014
 

Immediate Release 30 June 2014

GLOBAL ENERGY DEVELOPMENT PLC

(the "Company" or "Global")

 

 

SIMITI FORMATION FRACTURING UPDATE - BOLIVAR CONTRACT AREA

 

Global Energy Development PLC, the Latin America focused petroleum exploration, development and production company (AIM: GED) with operations in Colombia, announces an update on the fracturing of the Catalina #1 Simiti formation in the Company's Bolivar Association Contract ("Bolivar Contract") located in the northern section of the Magdalena Valley in Colombia, South America.

 

Steve Voss, Global's Managing Director, commented, "The Company is pleased with the favorable reservoir information confirmed during the preliminary water flowback stage of our Simiti stimulation project. We are still flowing back the extensive amount of injection water used in the hydraulic fracturing operation. The flowback is anticipated to be affected by the degree of reservoir connectivity which will affect how deeply the stimulation water has penetrated the reservoir. To accelerate the process, we are planning to install a hydraulic jet pump capable of lifting up to 3,000 barrels of fluid per day to remove the stimulation water from the Simiti formation in order to produce the available oil. After a period of testing, the Company estimates that it will have further information available prior to the end of July. We continue to be pleased with the project."

 

The Simiti Hydraulic Stimulation Project has been managed in several segments including Planning, Logistics, Stimulation Operations, Flowback Operations and Production Testing. The Company is providing a detailed update below on the recent stimulation and flowback operations as well as a recap on the earlier planning and logistic phases:

 

§ Stimulation Operations

 

 

- All surface and subsurface equipment was installed and pressure tested

- Seventy three perforations from 4911' to 5530' were made from the casing into the Simiti formation based upon the petrophysical quality and natural fracturing of the selected intervals.

 

 

- Five inch high pressure stimulation tubing was installed in the well; the workover rig was removed from the well site and stimulation equipment assembled.

 

- The initial fluid injected into the Simiti perforated interval was 3,000 gallons of 15% hydrochloric acid.

 

- Approximately 27,000 barrels of water were then pumped through the perforations at a rate of 65 barrels per minute and a pressure of 4,000 psi.

 

- The stimulation operation was completed with 181,000 pounds of sand injected into the Simiti over an eight hour period.

 

- Equipment performed well during the stimulation operation. 

 

§ Flowback Operations

- Flowback operations were commenced shortly after stimulation operations were concluded at an initial rate of approximately 400 barrels of water per hour or 9,800 barrels per day flowing back out of the Simiti perforated interval.

 

- Accumulated flowback is now 4,700 barrels out of 27,000 barrels pumped.

 

- During flowback operations, oil samples have been recovered with a gravity of 29 degrees API.

 

- The initial flowback well performance indicates the Simiti contains at least normal reservoir pressures.

 

- A continuous gas flare has been burning throughout the flowback period.

- To accelerate the flowback of the stimulation fluid, the Company will install an artificial lift system.

 

- Throughout the project, the Company has experienced no security issues and has maintained favorable community relationships involving the employment of local residents and other assistance to residents of the area.

 

· Production Testing

- The Company has repositioned a rig over the Catalina 1 wellbore and is proceeding to withdraw the frac string of tubing. When the tubing is removed, production tubing will be installed together with a hydraulic jet pump capable of lifting up to 3,000 barrels of fluid (water and oil) per day. During the first week of July, the pump will be installed and begin operations to remove the stimulation water from the Simiti formation in order to produce the available oil. After a period of testing, the Company estimates that it will have further information available prior to the end of July.

 

§ Planning

- Global retained the services of Ely and Associates, an experienced stimulation design, engineering and on-site operational management company. Ely will manage approximately 40,000 stimulation stages worldwide in 2014 including the single stage stimulation of the Simiti formation managed in behalf of Global.

 

- Ely prepared a design calling for the injection of sand and water previously recovered from other producing formations and stored in surface pits. The design objective was to achieve a stimulated formation length of 340 feet from the wellbore. John Ely, the founder of Ely and Associates, also committed to personally overseeing the equipment controls during the execution of the stimulation process.

 

- Global also contracted with Halliburton to provide stimulation equipment, high pressure pumps totaling approximately 20,000 hydraulic horsepower plus other chemicals and materials as well as field personnel.

 

§ Logistics

- The stimulation sand required was not available in Colombia and had to be transported from Houston, Texas to Colombia via cargo ship and then was trucked from the north coast of Colombia to Global's Catalina field located in the Bolivar Contract area of the northern Middle Magdalena Valley.

 

- Other surface equipment was required in order to be compatible with the high pressures of the stimulation process which were expected to exceed 5,000 psi. This equipment was manufactured in Houston and transported to Colombia.

 

- Thirty wheeled vehicles, pumps and/or tanks were also brought into the Catalina field area over a seven day period and assembled for stimulation operations.

 

For further information please contact

Global Energy Development PLC

Anna Williams, Finance Director

+001 817 310 0240

awilliams@globalenergyplc.com

www.globalenergyplc.com

Northland Capital Partners Limited

Louis Castro

+44 (0)20 7796 8800

Lauren Kettle

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKFDQOBKKBAB
Date   Source Headline
24th Sep 200712:25 pmRNSRule 8.3- Global Energy
24th Sep 200711:16 amRNSEPT Disclosure
21st Sep 20079:21 amRNSEPT Disclosure
20th Sep 20079:07 amRNSEPT Disclosure
19th Sep 20079:07 amRNSEPT Disclosure
19th Sep 20077:02 amRNSInterim Results
18th Sep 20078:58 amRNSEPT Disclosure
17th Sep 20079:12 amRNSEPT Disclosure
14th Sep 20078:41 amRNSEPT Disclosure
14th Sep 20077:01 amRNSRule 2.10 Announcement
13th Sep 20077:01 amRNSStatement re Potential Offer
12th Sep 20074:45 pmRNSNotifiable Interest
22nd Aug 20073:00 pmRNSNotifiable Interest
17th Aug 200710:30 amRNSAIM Rule 26
17th Aug 20077:00 amRNSBoard Change
13th Aug 20074:04 pmRNSChange of Adviser Names
18th Jul 20077:00 amRNSOperations Update
17th Jul 20073:12 pmRNSDirector Shareholding
2nd Jul 20077:00 amRNSNotifiable Interest
29th Jun 20077:01 amRNSDirector/PDMR Shareholding
27th Jun 20077:01 amRNSNew Contract Signed
26th Jun 200711:46 amRNSShare Option Grant
12th Jun 20077:00 amRNSDirector Shareholding
8th Jun 20077:00 amRNSDirector Shareholding
7th Jun 20074:46 pmRNSResult of AGM
7th Jun 20077:00 amRNSDirector Shareholding
1st Jun 20077:01 amRNSDirector Shareholding
29th May 200710:52 amRNSDirector Shareholding
25th May 20077:01 amRNSDirector Shareholding
24th May 20073:16 pmRNSDirector Shareholding
11th May 200711:15 amRNSAnnual Report and Accounts
11th May 200710:41 amRNSDirector Shareholding
9th May 20077:01 amRNSDirector Shareholdings
3rd May 200711:20 amRNSDirector Shareholding
19th Apr 20077:02 amRNSFinal Results
17th Apr 20077:01 amRNSWell Test Result
12th Apr 20077:00 amRNSReserve Report
28th Mar 20071:36 pmRNSHolding(s) in Company
22nd Mar 20077:00 amRNSWell Test & Update
21st Mar 20077:01 amRNSHolding(s) in Company
16th Mar 200710:29 amRNSHolding(s) in Company
5th Mar 20077:01 amRNSDrilling Update
19th Feb 20077:01 amRNSDrilling Update
9th Feb 20077:00 amRNSHolding(s) in Company
25th Jan 20073:11 pmRNSHolding(s) in Company
23rd Jan 20077:00 amRNSRig Mobilization
3rd Jan 20077:00 amRNSHolding(s) in Company
21st Dec 200610:16 amRNSDirector Shareholding
21st Dec 20067:01 amRNSAcquisition
19th Dec 200610:31 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.