The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Botswana Copper/Silver Project Record High Grade Intersection at T3 Deposit

5 Jan 2018 08:33

Metal Tiger Plc

5 January 2018

Metal Tiger Plc

("Metal Tiger" or the "Company")

Botswana Copper/Silver Project – Record High Grade Intersection at T3 Deposit

Metal Tiger plc (LON:MTR) is pleased to provide an update regarding the Company’s Joint Venture (“JV”) project with partner MOD Resources Limited (ASX:MOD) (“MOD”) in the Kalahari Copper Belt in Botswana (70% MOD Resources/30% Metal Tiger).

Highlights:

Highest grade intersection to date at T3 from latest and final batch of assay results: Hole MO-G-94D 18.0m @ 4.3% Cu and 94g/t Ag from 146m, within 53.9m @ 2.0% Cu and 40g/t Ag from 129m Significant widths of high-grade vein hosted copper and silver continue to be intersected within the wider resource drilling programme. Major Phase 2 drilling programme resumes next week at T3 then expanding over the wider T3 Dome, with 8 drill rigs in operation.

Michael McNeilly Chief Executive Officer of Metal Tiger commented :

“We are pleased to start the New Year with a record high-grade intersection from the final batch of Phase 2 drilling assays at our T3 Project. These wide high-grade copper intercepts bode well for the expected Phase 2 Mineral Resource upgrade expected later this month and the deeper intersections continue to support the prospect of an underground mining target below the planned T3 Open pit.

Diamond drilling will resume next week, with 8 rigs turning, as we continue to test T3 along strike.”

This announcement coincides with an update released today by MOD which can be viewed through the following link:

http://search.asx.com.au/s/search.html?query=mod&collection=asx-meta&profile=web

T3 Drilling Programme Update

Current T3 Phase 2 Infill & Extension drilling programme commended in August 2017 to test the potential for additional resource extensions including high-grade vein mineralisation within and outside the planned 10-year open pit mine (T3 Pit Project). Drilling will resume mid-next week with eight drill rigs on various targets at T3 and the 11km long, shallow plunging conductive Airborne Electromagnetic Geophysics (AEM) anomaly which extends 4-5kms either side of T3 (MOD have called this target ‘T-Rex’). Drilling is also planned to test the many AEM targets along the T3 Dome for deposits similar to the T3 Deposit which will commence in Q1 2018. Latest (and final) batch of assay results include a record intersection for the T3 Resource Infill Drilling Programme: 18m @ 4.3% Cu and 94g/t Ag from 146m downhole depth within a wide zone of 53.9m @ 2.0% Cu and 40g/t Ag from 128.5m downhole intersected in MO-G-94D. MO-G-94D occurs near the middle of the T3 Pit Project and is approximately 100m above an intersection of 72.6m @ 1.5% Cu and 27g/t Ag in MO-G-65D from 250m downhole depth (announced 6 March 2017). Recent results include additional significant intersections outside the planned T3 pit design, supporting the T3 Underground Project (announced 7 December 2017) as follows; MO-G-93D: 20m @ 1.2% Cu and 21g/t Ag from 186m MO-G-95D: 22m @ 1.2% Cu and 9g/t Ag from 188m MO-G-96D: 18m @ 1.9% Cu and 14g/t Ag from 120m downhole depth (including 6.2m @ 3.0% Cu and 24g/t Ag from 129m) These and previous Phase 2 Infill Programme assay results will feed into a Mineral Resource upgrade expected later this month. The Mineral Resource upgrade may require a corresponding revision to the pending Prefeasibility Study, which is currently based on the 24 August 2017 Mineral Resource Estimate. Key down-hole intersections from the latest (final) batch of diamond drill hole assay results, with mineral zone and interpreted vein id , include: Hole MO-G-90D 6.0m @ 1.1% Cu & 25g/t Ag from 324m (Zone 1, V1) Hole MO-G-93D 20.0m @ 1.2% Cu & 21g/t Ag from 186m , including; (Zone 1, V1) 6.5m @ 2.0% Cu & 49g/t Ag from 190m, and (Zone 1, V1) 2.0m @ 2.1% Cu & 46g/t Ag from 227m (Zone 1, V2) Hole MO-G-94D 53.9m @ 2.0% Cu & 40g/t Ag from 129m, including; (within planned T3 pit) 18.0m @ 4.3% Cu & 94g/t Ag from 146m Hole MO-G-95D 1.7m @ 4.8% Cu & 81g/t Ag from 175m (Zone 2, V2) 22.0m @ 1.2% Cu & 9g/t Ag from 188m, including; (Zone 2, V3) 8.0m @ 2.0% Cu & 6g/t Ag from 201m, and (Zone 2, V3) 4.0m @ 2.0% Cu & 12g/t Ag from 226m (Zone 2, V4) Hole MO-G-96D 18.0m @ 1.9 % Cu & 14g/t Ag from 120m, including; (Zone 1, V1) 6.2m @ 3.0% Cu & 24g/t Ag from 129m, and (Zone 1, V1) 5.4m @ 1.2% Cu & 9g/t Ag from 144m (Zone 1, V2) Hole MO-G-97D 4.0m @ 1.0% Cu & 23g/t Ag from 249m (Zone 1, V1) 1.0m @ 1.6% Cu & 30g/t Ag from 341m (Zone2, V4) Hole MO-G-99D 34.1m @ 0.8 % Cu & 6g/t Ag from 136m, including; (within planned T3 pit) 9.0m @ 1.3% Cu & 14g/t Ag from 139m, and 7.1m @ 1.2% Cu & 4g/t Ag from 153m Hole MO-G-100D 9.4m @ 1.0 % Cu & 4g/t Ag from 148m (Zone 1, V2) 8.0m @ 1.2% Cu & 8g/t Ag from 171m (Zone 2, V3) Hole MO-G-104D 8.5m @ 0.7 % Cu & 4g/t Ag from 111m (Zone 1, V2) Hole MO-G-105D 3.0m @ 1.1 % Cu & 8g/t Ag from 108m (Zone 1, V2) 2.8m @ 1.3% Cu & 6g/t Ag from 119m (Zone 2, V3) Hole MO-G-107D 21.5m @ 0.8 % Cu & 16g/t Ag from 221m, including; (Zone 1, V1) 7.0m @ 1.5% Cu & 32g/t Ag from 231m (Zone 1, V1)

Background information on the T3 Project

The T3 Project is located on the Kalahari Copper Belt in northern Botswana and is part of the MOD/MTR joint venture Botswana Copper/Silver Project. T3 is located within the central part of the T3 Dome (approximately 1,000km 2 ), which is the focus of rapidly increasing exploration activity undertaken by the JV. Two significant resources have been discovered to date within the T3 Dome: T1 (Mahumo deposit 100% MOD) and T3 (70% MOD / 30% MTR).

The T3 deposit was discovered in March 2016 when a reverse circulation (“RC”) drill hole intersected 52m @ 2.0% Cu and 32g/t Ag from shallow depth. The maiden T3 JORC (2012) compliant Mineral Resource was announced on 26 September 2016 with the first Resource upgrade announced on 24 August 2017. The results of a Scoping Study for an open pit mine at T3 with a 2Mtpa processing plant, an indicative mine life of 10 years and an average production rate of 21,800tpa of copper and 665,000oz pa of silver was released on 6 December 2016. Work on a Pre-Feasibility Study (PFS) commenced in January 2017 and additional deeper copper mineralisation was discovered below the T3 Resource in February 2017.

The T3 Prospect geological data and exploration results have been reviewed and approved by Jacques Janse van Rensburg, BSc (Hons), Business Development Manager and Competent Person for MOD Resources Ltd. Mineral Resource estimation and classification of the T3 Copper/Silver Project was conducted and approved by Mr A.I. Pretorius, MSc. Pri.Sci.Nat. an independent consultant to MOD Resources Ltd.

The current phase of drilling at the T3 Copper/Silver Deposit commenced on 7 th August 2017, with approval granted for the recommencement of both diamond core (DC) and reverse circulation (RC) drilling at the T3 Project and its vicinity, through to December 2018. This includes up to 70 planned diamond core drill holes designed to infill the current Resource and test for possible extensions. The objective of the infill program is to increase geological confidence and upgrade categorisation of the T3 Resource. The programme also includes grid drilling to investigate the potential for an underground Resource down-dip and along strike from the planned open-pit, and to investigate geophysical targets.

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly has visited the T3 site and reviewed MOD’s drilling and sampling protocols and procedures. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

In addition to its 30% interest in the JV, Metal Tiger holds 104,200,000 MOD shares, equivalent to 5.497% of MOD’s issued share capital and 1,541,667 MOD options each exercisable price of 6 cents (Australian) on or before 15 April 2019.

For further information on the Company, visit: www.metaltigerplc.com :

Michael McNeilly   (Chief Executive Officer)   Tel: +44(0)20 7099 0738
Keith Springall (Finance Director & Company Secretary) Tel: +44 (0)20 7099 0738
Stephen Allen or Bhavesh Patel RFC Ambrian Ltd

(Nominated Adviser)

Tel +44 (0)20 3440 6800
Jonathan Williams RFC Ambrian Ltd

(Joint Broker)

Tel +44 (0)20 3440 6800
Nick Emerson SI Capital

(Joint Broker)

Tel: +44 (0)1483 413 500
Rita Adiani NRG Tel: +44 (0)20 3709 4504
Gordon Poole

James Crothers

Camarco (Financial PR) Tel: +44 (0)20 3757 4980

Notes to Editors:

Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

The Company’s target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

Metal Tiger’s Metal Projects Division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana, Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain, the Company has tungsten and gold interests in the highly-mineralised Extremadura region. In Thailand, Metal Tiger has interests in two potentially near-production stage silver/lead/zinc mines as well as licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially viable may be undertaken by Metal Tiger or by an AIM or NEX Exchange (formerly ISDX) partner with whom the Company is engaged.

View source version on businesswire.com: http://www.businesswire.com/news/home/20180105005251/en/

Copyright Business Wire 2018

Date   Source Headline
11th Oct 20192:40 pmRNSMOD Resources - Share Issuance to Metal Tiger
9th Oct 20199:15 amBUSMOD Resources Update - Scheme of Arrangement Becomes Effective
8th Oct 20197:16 amRNSMOD Resources-Court Approves Scheme of Arrangement
7th Oct 20198:30 amRNSKalahari Metals Limited - Drilling Progress Update
1st Oct 20197:19 amRNSMOD Resources Update - Results of Meetings
25th Sep 20197:00 amBUSUnaudited interim results for the six months ended 30 June 2019
23rd Sep 20197:00 amBUSKalahari Metals Limited Approval of EMP and Identification of Future Drilling Targets
16th Sep 201910:41 amBUSExercise of MOD Options
6th Sep 201910:52 amRNSCEO Interview
2nd Sep 20199:43 amBUSCompletion of Cobre Agreement and Perrinvale Operational Update
27th Aug 20199:34 amBUSMOD Resources T3 mine ESIA progresses to public review
27th Aug 20199:32 amBUSUpdate on Term Sheet with Cobre Pty Ltd
22nd Aug 20197:00 amRNSMOD Resources Update on Proposed Transaction
21st Aug 20197:01 amBUSMOD Resources Progress Update on the Proposed Sandfire Transaction
1st Aug 201912:24 pmBUSKalahari Metals Limited Exploration Update
29th Jul 201912:12 pmBUSPan Asia Metals – Reung Kiet Lithium Project Drilling and Trenching Results
26th Jul 20199:05 amRNSTerm Sheet signed with Cobre and Issue of Equity
25th Jun 20197:00 amRNSMOD Resources - Offer from Sandfire Resources
5th Jun 20194:16 pmBUSPosting of Annual Report and Notice of AGM
31st May 201911:00 amBUSFurther investment of US$1.1m in Kalahari Metals Limited
31st May 20197:00 amBUSAudited results for the year ended 31 December 2018 and Notice of Annual General Meeting
24th May 20197:00 amBUSHolding(s) in Company
23rd May 20197:00 amBUSKalahari Metals Limited Exploration Update
9th May 20199:26 amRNSAppointment of joint broker
7th May 20199:23 amBUSBotswana Copper Silver Project T3 Project & Regional Exploration Programme Plan
29th Apr 20197:00 amBUSBotswana Copper Silver Project T3 Infill Drilling Results
25th Apr 201911:15 amBUSSpain Winter 2018/19 Work Programme Update & Drilling Results
15th Apr 20197:00 amBUSKalahari Metals Limited Environmental Permitting Update
10th Apr 20197:08 amBUSKalahari Metals Limited Acquisition of Kitlanya Ltd
5th Apr 201911:48 amBUSIssue of Equity
4th Apr 20197:00 amBUSPan Asia Metals Commencement of Drilling Programme at Reung Kiet Lithium Project
3rd Apr 201911:13 amRNSKalahari Metals Limited - Environmental Permitting
29th Mar 20192:46 pmRNSStandard form for notification of major holdings
29th Mar 20192:46 pmRNSStandard form for notification of major holdings
28th Mar 20197:40 amBUST3 Feasibility Study Confirms High-Margin, Low-Capital Open Pit Copper Mine
25th Mar 20194:12 pmRNST3 Open Pit Reserve Increased to 34.4Mt
12th Mar 20199:07 amBUSHolding(s) in Company
12th Mar 20197:00 amBUSBotswana Copper Silver Project T3 Infill Drilling Results
11th Mar 20192:12 pmBUSKalahari Metals Limited Investment Update
11th Mar 20197:00 amBUS£2.0 million raised through Sprott Offering
7th Mar 20197:18 amBUSKalahari Metals Limited Exploration Update
15th Feb 20197:00 amBUSDirector Dealing
11th Feb 201911:37 amBUS£1.0 million Placing and Non-binding term sheet signed with Sprott to raise up to an additional £3.0 million
7th Feb 201912:36 pmBUSKalahari Metals Limited – High-Resolution Geophysics Identifies Drill-Ready Targets
31st Jan 20197:07 amBUSOn Market Sale MOD Resources Limited
29th Jan 20197:56 amBUSBotswana Copper Silver Project MOD JV Copper Project Quarterly Update
21st Jan 20199:15 amBUSMOD Resources A$15m Capital Raise and Non-Binding Offer Received by MOD
20th Dec 20187:00 amBUSBotswana Copper Silver Project A4 Dome Drilling Update
14th Dec 201811:31 amBUSBotswana Copper Silver Project – Prospecting Licences Extended & Transferred
10th Dec 20187:00 amBUSBotswana Copper/Silver Project T23 Dome Exploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.