The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMetminco Regulatory News (MNC)

  • There is currently no data for MNC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Major Resources Upgrade

1 Jul 2010 07:00

RNS Number : 6077O
Metminco Limited
01 July 2010
 



Metminco Limited (LSE: MNC)

("the Company")

Metminco Shareholders 1 July 2010

 

Major Resources Upgrade at Los Calatos to

926 million tonnes

 

- approximately 350% increase in resources from June 2009

- planning underway for new 50,000m drill program

- drilled mineralization (~ 900m x 500m) open in several directions and at depth

- early stage (~ 21,000m drilling) exploring a world class Cu-Mo porphyry system (~ 10km long) within a major Cu porphyry belt

 

Los Calatos copper / molybdenum (Cu-Mo) project - revised resources estimate

 

The Directors of Metminco are pleased to announce that following phase 2 drilling by Hampton Mining Limited ('Hampton'), resources at Hampton's Los Calatos Project in Peru have increased by approximately 350% to 926 million tonnes, using a cut off grade of 0.2% Cu.

 

Metminco has a 69.4% interest in Hampton.

 

In the phase 2 drilling campaign at Los Calatos Hampton drilled 10 core holes totaling 9,516m from November 2009 to March 2010, supplementing 13 cored holes previously drilled by Hampton (phase 1, totaling 6,387m), and 39 cored and reverse circulation holes drilled previously by Phelps Dodge and Barrick. Total metres drilled on the Los Calatos Project to June 2010 are 21,261m, of which 20,393m was considered in the revised June 2010 resource estimate.

 

Refer Table 1 for a summary of the June 2010 Mineral Resource statement.

 

Table 1. Mineral Resource Statement for the Los Calatos Project Peru, June 2010

Resource Classification

Tonnage ,

000 tonnes

Copper %

Molybdenum %

Indicated

111,264

0.39

0.038

Inferred

814,970

0.37

0.026

Notes: 1. Refer to the Mineral Resource Statement by C. Sinclair (Appendix 1).

2. Cut-off grade of 0.2% Cu

 

Following phase 1 drilling Hampton reported in June 2009 total resources for the Los Calatos Project of 262 million tonnes (at a cutoff grade of 0.2% Cu), subdivided into:

·; Indicated Resources of 69.2 million tonnes at 0.44% Cu and 0.051% Mo, and

·; Inferred Resources of 192.4 million tonnes at 0.42% Cu and 0.038% Mo.

 

Hampton is preparing a more detailed technical report on the Los Calatos Project, to be released in this quarter.

 

 

Background

 

Location

·; Total tenement area is 177 km2

·; The location of Los Calatos is regarded as favourable for possible development: in coastal desert and near existing mines & infrastructure.

·; Los Calatos occurs within a major Cu-Mo porphyry belt, near the coast in far south Peru. Refer Appendix 1 for background on three large existing mines near Los Calatos.

 

Resources / mineralization

·; Following the resources revision total resources at a range of cut-offs are as follows:

 

Cut-off Grade

Indicated Resources

Inferred Resources

(%)

T ('000)

Cu (%)

Mo (%)

T ('000)

Cu (%)

Mo (%)

0.40

36,975

0.59

0.062

296,699

0.55

0.034

0.35

49,036

0.54

0.055

365,562

0.52

0.034

0.30

64,108

0.49

0.049

463,465

0.47

0.032

0.25

86,325

0.43

0.044

594,390

0.43

0.030

0.20

111,264

0.39

0.038

814,970

0.37

0.026

0.15

136,269

0.35

0.034

1,049,445

0.33

0.022

 

·; Total contained copper equivalent metal (CuEq), and average grade (% CuEq), for a range of cut-offs are as follows:

 

Cut-off Grade

Total Tonnes

Contained

CuEq Metal

Average grade CuEq

(%)

('000)

('000) t

(%)

0.40

333,674

2,470

0.74

0.35

414,598

2,920

0.71

0.30

527,573

3,400

0.64

0.25

680.715

4,010

0.59

0.20

926,234

4,720

0.51

0.15

1,185,714

5,330

0.45

Note: 1. Copper equivalence assumes a ratio of Cu/Mo prices of 5.

 

·; At the 0.2% Cu cutoff grade, the drilling to date defines a mineralized porphyry body with a drill tested strike length of 900m (previously 600m), a maximum drill tested width of 500m (previously 300m), and a drill tested vertical depth of 1100m (previously 800m). Hence the considerable increase in the previous resource estimate.

·; The cutoff grade of 0.2% Cu is broadly consistent with a development concept of large scale open pit mining.

·; Mineralization drilled to date occurs within a major NW-SE oriented alteration zone over 10 km long, outlined by a systematic and ongoing surface exploration program.

·; Within this belt surface mapping & sampling has so far delineated seven exploration targets of which only one has been drilled to date.

·; Exploration of the Los Calatos Project is at an early stage.

 

Metallurgy

·; Recent preliminary flotation testing on composite samples from drill core returned favourable results.

 

Planned work program

Hampton is currently planning to commence a 50,000 metre phase 3 drilling program at Los Calatos, seeking to extend current resources, and to drill test other nearby exploration targets.

 

Management & technical team

Metminco and Hampton have an experienced board and senior management team. They have the technical, financial and commercial skills necessary to explore Hampton's properties, and to develop and commission mines.

 

Metminco recently strengthened its team with the appointment to the board of Mr. Tim Read and Mr. Francisco Vergara Irarrazaval. Mr. Read is based in the United Kingdom and was formerly an investment banker and corporate executive and has over forty years experience in the mining and metals sector. Mr. Vergara is senior partner of a law firm in Santiago, Chile and has extensive experience in the resources sector in Chile and in other Latin American countries.

 

 

 

John Fillmore

Chairman

Metminco Limited

 

 

 

 

Contacts

Metminco Limited

Corporate & general Phillip Wing, 0412 254 704, pwing@bigpond.net.au

Technical : Bill Etheridge, 0419 400 919, wse@optusnet.com.au 

 

Buchanan Communications

Tim Thompson, James Strong, Katharine Sutton +44(0) 207 466 5000

 

Cannings Corporate Communications

Nigel Kassulke, 0407 904 874, nkassulke@cannings.net.au

 

Appendix 1 Los Calatos resources statement, June 2010

 

23 JUNE 2010

 

LOS CALATOS MINERAL RESOURCES STATEMENT

 

Hampton Mining Limited ('Hampton') from November 2009 to March 2010, completed the Phase 2 drilling program at Los Calatos, Peru. Phase 2 drilling consisted of 10 diamond cored boreholes totaling 9,516 metres and follows the Phase 1 program of 13 diamond cored boreholes, which resulted in the initial resource of 261,504,000 tonnes reported in June 2009.

 

Prior to Hampton's ownership, previous drilling totaled 5,295 metres of which 26 were reverse circulation and 13 diamond cored boreholes drilled by Phelps Dodge Inc and Barrick Gold Corporation. Of this drilling 5 reverse circulation and 11 diamond drill holes, totaling 4,490 metres, are relevant to the resource estimate. The total number of drill holes, therefore, considered for the estimate was 39, totaling 20,393 metres of which 5 were reverse circulation drillholes.

 

The recent drilling defines, at the 0.20% copper cutoff, a mineralized porphyry body with a drill tested strike length of 900 metres (open), up to 500 metres wide (not fully defined) , and greater than 1,100 metres vertical depth (open). The Phase 2 drilling, drilled from the south to north, extended the strike length of the mineralization from 600 to 900 metres, extended the southern mineralized boundary from 300 metres up to 500 metres, and increased the depth of mineralisation from 800 metres to 1,100 metres, hence, considerably increasing the previous resource estimate.

 

The mineralized body at a 0.20% copper cut off totals 926,234,000 tonnes.

 

The resource can be subdivided into an Indicated Resource of 111,264,000 tonnes at 0.39% Cu, and 0.038% Mo, and an Inferred Resource of 814,970,000 tonnes at 0.37% Cu, and 0.026% Mo.

 

The Inferred Resource is regarded by Hampton as a lower level of confidence, and is inferred from geological and drill evidence with assumed but not verified continuity (JORC Code). Further drilling is required to upgrade the Inferred Resource to the Indicated category.

 

Mineral Resource Statement for the Los Calatos Project Peru, June 2010

Resource Classification Tonnage Copper Molybdenum

(´000) (%) (%)

Indicated 111,264 0.39 0.038

Inferred 814,970 0.37 0.026

 

Block tonnages and grades were estimated by SRK Consulting, Chile, using Ordinary Kriging and considering a strategy of estimation foreach unit based on the results of variography analyses with Gemcom software.

 

 

Los Calatos Resource Estimate June 2010

 

At different cutoff grades

 

 

Indicated

Inferred

 

Total

 

Cutoff

Tonnage

Cu

Mo

Tonnage

Cu

Mo

Tonnage

 

%Cu

(´000)

%

%

(´000)

%

%

 (`000)

 

 

0.40

36,975

0.59

0.062

296,699

0.55

0.034

333,674

 

0.35

49,036

0.54

0.055

365,562

0.52

0.034

414,598

 

0.30

64,108

0.49

0.049

463,465

0.47

0.032

527,573

 

0.25

86,325

0.43

0.044

594,390

0.43

0.030

680,715

 

0.20

111,264

0.39

0.038

814,970

0.37

0.026

926,234

 

0.15

136,269

0.35

0.034

1,049,445

0.33

0.022

1,185,714

 

 

 

Competency Statement

 

The estimate of the Resources for the Los Calatos Project as presented in this statement, has been carried out in accordance with the guidelines of the 'Australian Code for Reporting of Mineral Resources and Ore Reserves' committee of the Australian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Mineral Council of Australia, 2004.

Information was collated and interpreted by C. Sinclair and resource block modeling undertaken by SRK Consulting, Chile. C. Sinclair reviewed and validated the information provided by Hampton and the work undertaken by SRK Consulting, Chile.

 

C. Sinclair is a full time employee of Minera Hampton Chile Limitada, a wholly owned subsidiary of Hampton Mining Limited, and estimated the resources based on the block modeling undertaken by SRK Consulting, Chile.

 

Mr. Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 edition of the Australian Code for Reporting Mineral Resources and Ore Reserves.

 

Mr. Sinclair is a Member of the Aus IMM and has over 40 years experience. Mr. Sinclair is signing off as the competent person for this statement, and consents to the inclusion in a report based on this information in the form and context in which it appears.

 

 

C. Sinclair

23 June 2010

 

 

Appendix 2 Regional setting of the Los Calatos Project

 

Porphyry deposits typically occur in clusters or belts.

 

Hampton's Los Calatos tenement holdings are located in the Moquegua district of Southern Peru, and within a major Paleocene / early Eocene belt of copper-molybdenum porphyry deposits (mineralization approximately 55 million years old):

·; The Cuajone and Toquepala deposits to the south east, both large existing mines, owned by Southern Copper Corporation (SCC, a subsidiary of Grupo Mexico), which also owns smelting and refining operations located at nearby port of Ilo.

·; The Quellaveco deposit, now seeking permitting for development, owned 81.9% by Anglo American) also southeast, and

·; The Cerro Verde deposit to the northwest, near Arequipa, a large existing mine operated and owned (53.6%) by Freeport McMoran.

 

The deposits occur along a major northwest-southeast structural trend associated with the major Incapquio Fault.

 

Cuajone and Toquepala mines

 

Production started at Toquepala in 1960 and at Cuajone in 1976. At end 2007 the Toquepala and Cuajone pits were approximately 700 metres and 800 metres deep, respectively. Under the then mine planning configurations both pits will reach ultimate depths of approximately 1,200 metres (source: SCC 10-K report for 2007).

 

Reserves at SCC's mines at end calendar 2009 (assuming metal prices of US$2.90 per lb for Cu and US$23.4 per lb for Mo) were:

·; Toquepala 3734 million tons at 0.442% Cu and 0.022% Mo, based on a cutoff grade of 0.177% Cu (Strip ratio 4.37 to 1).

·; Cuajone 2765 million tons at 0.517% Cu and 0.017% Mo, based on a cutoff grade of 0.152% Cu (Strip ratio 2.61 to 1).

 

Assuming metal prices of US$1.80 per lb Cu and US$11 per lb Mo then reserves at the respective mines were:

·; Toquepala 2212million tons at 0.48% Cu and 0.018% Mo, based on a cutoff grade of 0.244% Cu (Strip ratio 5.42 to 1).

·; Cuajone 1914 million tons at 0.51% Cu and 0.018% Mo, based on a cutoff grade of 0.203% Cu (Strip ratio 2.38 to 1).

 

Mine production by Southern Copper Corporation (SCC) at Toquepala in calendar 2009 was 127,100 tons of copper in concentrate and 5,300 tons molybdenum in concentrate, and at Cuajone 188,950 tons of copper in concentrate and 3,600 tons molybdenum in concentrate. In addition SCC produced 38,000 tons of cathode copper from combined leach copper feed from both mines.

 

Cerro Verde mine

Production started in 1976 from SX-EW leach operations. In late 2006 Cerro Verde started producing copper in concentrate from treatment of primary copper-molybdenum ores .

 

Proven and Probable Reserves at December 2009 wre 2809m tonnes @ 0.40% Cu, 150ppm Mo (assumed metal prices assumed: copper US$1.60 per lb, and Mo US$8.0 per lb, cutoff grade 0.20% Cu).

 

Mine production at Cerro Verdein calendar 2009 was 662m lb copper (300,000 tonnes) and 2m lb of molybdenum (900 tonnes).

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASXFELDEEEF
Date   Source Headline
12th Oct 20185:20 pmRNSMetminco
9th Oct 20187:00 amRNSChange in Substantial Shareholding
4th Oct 20187:00 amRNSAIM delisting and Share Registry update
3rd Oct 20187:00 amRNSCapital Raising
19th Sep 20187:00 amRNSAcquisition:DSO Nickel Laterite Project-Financing
18th Sep 20188:06 amRNSASX Voluntary Suspension Update
17th Sep 20187:33 amRNSVoluntary Suspension ASX
14th Sep 20187:00 amRNSResults of EGM
13th Sep 20188:58 amRNSHalf-year Report
13th Sep 20187:30 amRNSSuspension - Metminco Limited
13th Sep 20187:13 amRNSTemporary Suspension
30th Aug 20187:00 amRNSTesorito Drilling Results
13th Aug 20187:00 amRNSGM Statement- EGM Notice of Meeting
2nd Aug 20188:25 amRNSAppointment of Exploration Director Colombia
31st Jul 20187:00 amRNSJune 30th 2018 Activity Statement & Appendix 5B
31st Jul 20187:00 amRNSTesorito Drilling Update
18th Jun 20181:55 pmRNSAppointment of Broker
5th Jun 20187:00 amRNSChange of Registered Office
5th Jun 20187:00 amRNSStrategy/Company/Ops Update
29th May 20187:00 amRNSCompany Secretary Change
29th May 20187:00 amRNSLatest Presentation
29th May 20187:00 amRNSResult of AGM
22nd May 20187:00 amRNSIssue of Equity
17th May 20188:19 amRNSLatest Presentation 121 Conference London
17th May 20187:00 amRNSHolding(s) in Company
17th May 20187:00 amRNSLatest Presentation 121 Conference London
9th May 20187:00 amRNSCeasing to be a Significant Shareholder
4th May 20188:45 amRNSChange in Holding(s) in Company
1st May 20188:25 amRNSCorporate Governance Statement
1st May 20188:03 amRNSIssue of Equity
1st May 20187:35 amRNSMarch 2018 Qtr Activities Report & App 5B
1st May 20187:00 amRNSAnnual Financial Report
26th Apr 20189:16 amRNSAGM Statement
26th Apr 20187:00 amRNSAnnouncement re: Rights Issue
20th Apr 20187:00 amRNSAnnouncement re: Rights Issue
4th Apr 201811:37 amRNSHolding(s) in Company
3rd Apr 20187:00 amRNSAnnual Financial Report
28th Mar 20187:00 amRNSIssue of Equity
27th Mar 20188:43 amRNSLatest Presentation
26th Mar 20189:00 amRNSAnnouncement re: Rights Issue
23rd Mar 20187:10 amRNSDirectorate Change
23rd Mar 20187:03 amRNSAnnouncement re: Rights Issue
23rd Mar 20187:00 amRNSAnnouncement re: Rights Issue
21st Mar 20187:00 amRNSAnnouncement re: Rights Issue
19th Mar 20187:00 amRNSDirectorate Change
14th Mar 20189:17 amRNSHolding(s) in Company
12th Mar 20187:00 amRNSAnnouncement re: Rights Issue
5th Mar 20187:00 amRNSAnnouncement re: Rights Issue
27th Feb 201810:41 amRNSStatement re Meeting 2 March 2018
8th Feb 20187:57 amRNSSubstantial Shareholder Dealing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.