The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.05
Bid: 3.00
Ask: 3.10
Change: 0.00 (0.00%)
Spread: 0.10 (3.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.05
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of testing at Heron-1

24 Oct 2019 07:00

RNS Number : 9858Q
Petro Matad Limited
24 October 2019
 

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY PETRO MATAD LIMITED TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

24 October 2019

Petro Matad Limited

('Petro Matad' or the 'Company')

Results of testing at Heron-1

 

Petro Matad Limited, the AIM quoted Mongolian oil explorer, is pleased to announce the results of well testing operations at its Heron-1 oil discovery in the north of Block XX, eastern Mongolia, adjacent to the producing Block XIX, operated by PetroChina.

 

Highlights

 

·; Positive results of well testing operations at Heron-1 oil discovery in the north of Block XX

·; DST2 flowed oil at a peak rate of 821 bopd

·; Produced 46o API oil, without need for artificial lift or stimulation, exceptional for the Tamsag Basin

·; DST1 did not flow naturally but proved at least a 70 metre oil column in the well

·; Company will incorporate all data from the 2019 drilling campaign into rapid reinterpretation of Block XX in order to apply for an Exploitation Licence from the Government of Mongolia

 

Intervals for two separate cased hole drill stem tests ("DST") were chosen based on the petrophysical analysis of log data acquired over the 77 metres of potential oil reservoir in the Lower Tsagaantsav Formation in the Heron-1 well. The first test was performed over a three metre zone at 2,872 metres, near the base of the sands seen in the well. This zone proved to be tight with very limited inflow recorded. Oil was present in the test string when the tools were recovered to surface indicating that the zone is indeed oil-bearing and so proving an oil column height of at least 70 metres in the well. The pressure data from DST1 is now being analysed and will be used by specialist reservoir stimulation experts that the Company has retained to determine if improvements in permeability could be achieved to allow this zone to flow.

 

DST2 was performed over a 12 metre interval from 2,834 metres in the upper portion of the Lower Tsagaantsav Formation. The zone flowed oil and some associated gas to surface without the need for any artificial lift. This is exceptional for the Tamsag Basin where only a few of the hundreds of wells drilled have had the capability to produce oil to surface on natural flow. The peak production recorded during the test was 821 barrels of oil per day ("bopd"). For the main flow period, the well was choked back on an 0.3-inchchoke to optimise the collection of pressure data. Through this period, the well flowed at an average rate of 200 bopd with a well head flowing pressure of 250 psi. The oil recovered is very light, with an API gravity of 46 degrees making it one of the lightest oils recorded in the basin. This may be a function of Heron-1 being one of the deeper discovery wells so far drilled and tested in the area. No formation water was produced during the test. The well has now been shut in for pressure build up and once the test is complete and all samples and pressure data have been gathered the test equipment and the service rig will be demobilised and the Heron-1 well will be suspended.

 

Given the capacity of the well to flow naturally to surface at what is clearly a commercial flow rate, the well will not be subject to any reservoir stimulation operations at this time. The test data will now be analysed to determine the sustainable deliverability of the well on natural flow and what rate the reservoir could be expected to sustain if the well is pumped. The data will also be used to investigate what impact reservoir stimulation could be expected to have on the well's production characteristics in the future including analysis of the additional oil-bearing intervals in the well that have not yet been tested.

 

The Company had assigned a pre-drill resource estimated for the Heron structure of 165 million barrels of in place oil, with 25 million barrels (P50) recoverable resource, based on a recovery factor of 15%. The Heron-1 flowrate is very encouraging and could indicate that the assumed recovery factor is too conservative, however more wells will be required to prove up the total volumes in the structure.

 

The Company will now focus its activities on incorporating all the data it has gathered in its 2019 drilling campaign, and in particular the Heron-1 results, into a rapid reinterpretation of Block XX and will then engage with the Mongolian government to secure an Exploitation Licence in order to be able to put Heron-1 on to production in 2020, to pursue the development of the discovery and to investigate further the resource potential of the now proven continuation of the Tamsag Basin petroleum system into Block XX.

 

Mike Buck, the CEO of Petro Matad said:

"The test results at Heron-1 are even better than we expected given that the well is deep in the basin centre. The data gathered will now be analysed and used to secure tenure of a development area in Block XX with a view to transitioning Petro Matad from explorer to producer with revenue generation.

I am delighted that the Petro Matad team has been able to achieve this result having put in so much effort. We look forward to progressing to the next phase of the Company's development."

 

Further updates will be provided in due course.

-Ends -

For further information please contact:

Petro Matad Limited

 

Mike Buck, CEO

+976 7014 1099 / +976 7575 1099

Shore Capital (Nominated Adviser and Broker)

Toby Gibbs

Jerry Keen

+44 (0) 20 7408 4090

Stifel Nicolaus Europe Limited (Broker)

 

Callum Stewart

Nicholas Rhodes

Ashton Clanfield

+44 (0) 20 7710 7600

FTI Consulting (Communications Advisory Firm)

Sara Powell

Ben Brewerton

+44 (0) 20 3727 1000

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds 100% working interest and the operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,367 square kilometres in the far eastern part of the country, and Blocks IV and V have an area of 29,062 square kilometres and 21,143 square kilometres, respectively, in the central western part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLIFSEIFLSFIA
Date   Source Headline
5th Nov 20093:30 pmRNSHolding(s) in Company
5th Nov 20098:43 amRNSHolding(s) in Company
2nd Nov 200910:12 amRNSWinter Shutdown
22nd Oct 20099:20 amRNSDrilling Contract
1st Oct 20098:03 amRNSTotal Voting Rights
17th Sep 200911:32 amRNSCompletion of share issue
28th Aug 20092:36 pmRNSIssue of Equity
24th Jul 20098:30 amRNSHalf Yearly Report
14th Jul 200911:39 amRNSResult of AGM
8th Jul 20091:54 pmRNSNew Production Sharing Contracts
1st Jul 200912:49 pmRNSHolding(s) in Company
30th Jun 20091:15 pmRNSTotal Voting Rights
30th Jun 20091:15 pmRNSHolding(s) in Company
24th Jun 200910:30 amRNSIssue of Equity
10th Jun 20098:30 amRNSPreliminary Results
9th Apr 20092:45 pmRNSAward of Options
20th Mar 20098:42 amRNSDirector/PDMR Shareholding
2nd Mar 20097:00 amRNSTotal Voting Rights
20th Feb 20097:00 amRNSIssue of Equity
17th Dec 20087:00 amRNSResults of Davsan Tolgoi 2008 3D Seismic Survey
27th Nov 20089:41 amRNSWarrant Extension
8th Oct 20087:00 amRNSInterpretation of 2D Seismic Survey
30th Sep 20087:06 amRNSInterim Results
18th Jul 200810:00 amRNSResults of Seismic Interpreta
27th Jun 200810:04 amRNSAnnual Report and Accounts
26th Jun 20085:06 pmRNSDirectorate Change
25th Jun 20087:00 amRNSFinal Results
9th Jun 20087:00 amRNSSeismic Exploration Contract
1st May 20087:01 amRNSFirst Day of Dealings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.