Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Exploration and Drilling Update

18 Oct 2010 08:20

RNS Number : 5358U
Petro Matad Limited
18 October 2010
 



 

 

Petro Matad Limited ("Petro Matad" or the "Company")

 

Exploration and Drilling Update

 

Petro Matad (AIM:MATD) is pleased to provide an update on its exploration and drilling activities on the Davsan Tolgoi Prospect on Block XX in Eastern Mongolia.

Davsan Tolgoi-3 ("DT-3") spudding

The DT-3 exploration well was spudded at 18:00 Mongolian time on 15 October 2010. The well is intended to be drilled vertically to an estimated target depth of approximately 1,200m.

During the afternoon of 17 October, the well reached the first casing point at 345m depth, where the first string casing will be set and cemented. Following that, the well will continue drilling the second and final string to target depth.

DT-3 is the third exploration well to be spudded as part of Petro Matad's three well drilling programme for 2010 on its Production Sharing Contract on Block XX. It is located approximately 8.6 km southwest of DT-1 and 7.7km southwest of DT-2.

The two previous wells tested a subsidiary closure along the crest of the Davsan Tolgoi anticline and showed a shared hydrocarbon column slightly over 100m in height. DT-3 has been sited at the apex of the Davsan Tolgoi anticline, where the top of the Tsagaantsav formation is approximately 150m higher than at DT-1, and thus will test the full height of the hydrocarbon column. DT-3 will also be well positioned to test for any hydrocarbon accumulations in an anticlinal closure in the Upper Zuunbayan formation as well as in fractured basement.

Analytical Results for Davsan Tolgoi-1 (" DT-1")

The Company has received the laboratory reports for thermal maturity and fluid inclusion studies of well samples from DT-1. No further test results are pending.

 

Fluid inclusion analysis identified two zones of anomalous hydrocarbons. Firstly, a zone in Upper Zuunbayan sandstones from 810m to 850m that was not identified during the drilling operations. Secondly, a zone from 1,080m to 1,180m within Tsagaantsav sandstones and basement metamorphic rocks.

 

The Zuunbayan oil inclusions have dry gas, acetic acid and other volatile constituents indicating that they lie down-dip from an oil/water contact.

 

The fluid inclusion pattern in the Tsagaantsav and underlying basement is indicative of a stratified hydrocarbon column with dry gas characteristics from 1,080m to 1,105m and wet gas to oil constituents from 1,110m to 1,180m. The fluid inclusion study concluded that DT-1 penetrated oil in the Tsagaantsav, a conclusion that is consistent with observed oil shows, mud gas signature, and calculated hydrocarbon saturations.

 

The geochemical data from DT-1 further proves that the Davsan Tolgoi anticline is a regional focus for oil and gas migration, with the observed hydrocarbons coming from deeper and more thermally mature parts of the Tamsag Basin. Vitrinite reflectance values of 0.44 at 580m and 0.53 at 1,070m and a Tmax value of 428oC from 1,070m demonstrate that local source rocks along the crest of Davsan Tolgoi are thermally immature. The presence of hydrocarbons in DT-1, and particularly the dry through wet natural gas inclusion phases, requires migration from the deepest parts of the basin where mature source rocks lie within the gas generative window.

 

Commenting on the spudding of DT-3, CEO Douglas McGay noted "The contractor and our technical team are to be congratulated on the speedy mobilisation and the commencement of drilling of DT-3. They are now experiencing early winter conditions on site, with nighttime temperatures falling below zero. The speed of completion of the first string is an encouraging sign, but we are monitoring the conditions on site for engineering and health and safety issues that the rapidly approaching winter conditions may cause.

 

"The Company has been diligently pursuing both an extra drilling rig and also a workover rig to try to achieve as much as possible prior to the end of the calendar year. At the moment we are hopeful of further work being commissioned to suitable contractors, but are mindful of the difficulties that can occur in a yet-to-be developed oil services sector."

 

Further commenting on the DT-1 analytical results, McGay said "These laboratory results provide quantitative proof of the previously observed well data. That is, that the hydrocarbons in Davsan Tolgoi have migrated over long distances from the source kitchens and have charged the Tsagaantsav Formation of Davsan Tolgoi. They have provided more surety in de-risking this aspect of the prospective resources. The previously undetected indication of hydrocarbons in the Zuunbayan Formation is also a welcome result."

 

 

Technical information in this news release has been reviewed by the Company's Exploration Manager, Dr James Coogan. Dr Coogan is a petroleum geologist with 29 years of experience in North American and international exploration and development.

 

He is a member of the American Association of Petroleum Geologists and the Geological Society of America.

 

Further information about the Company:

 

Petro Matad Limited

Douglas J. McGay- CEO

+976 11 331099

 

Westhouse Securities Limited

Richard Baty/Petre Norton

+44 (0)20 7601 6100

 

Note to Editors:

 

About Petro Matad Limited

 

Petro Matad is the parent company of a group focused on oil exploration, as well as future development and production in Mongolia. The group holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. The principal asset is the PSC for Block XX, a petroleum block of 10,340km² in the far eastern part of the country. The two other blocks, IV and V are located in central Mongolia and jointly cover 71,040km².

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGLBDGRUBBGGI
Date   Source Headline
28th May 202612:00 pmRNSResult of AGM
28th May 20267:00 amRNSOperational Update
15th May 20267:00 amRNSNotice of AGM Logistics
30th Apr 20267:00 amRNSNotice of AGM
18th Feb 20267:00 amRNSPetro Matad Operational Update
13th Jan 20267:00 amRNSBoard Changes
12th Dec 20257:00 amRNSOperational Update
10th Dec 20257:00 amRNS-RInvestor Presentation
5th Nov 20257:00 amRNSOperational Update
9th Oct 20257:00 amRNSOperational Update
29th Sep 20257:05 amRNSInterim results for six months ended 30 June 2025
29th Sep 20257:00 amRNSH1 Production Operations and Well Testing Update
24th Sep 20257:00 amRNSOperational Update
26th Aug 20257:00 amRNSOperational Update
30th Jul 20257:00 amRNSOperational Update
23rd Jul 202512:00 pmRNS-RInvestor Presentation
16th Jul 20257:00 amRNSResult of Retail Offer
11th Jul 20257:05 amRNSRetail Offer
11th Jul 20257:00 amRNSResults of Placing and Subscription
10th Jul 20254:35 pmRNSProposed Capital Raising
26th Jun 20254:58 pmRNSFinal results year ended 31 Dec 2024 - Replacement
26th Jun 20257:00 amRNSFinal results for year ended 31 December 2024
18th Jun 20257:00 amRNSProduction Revenue Received
30th May 20257:00 amRNSOperational Update
28th Apr 20257:00 amRNSSignature of Oil Sales Agreement
13th Mar 202510:40 amRNSResult of AGM
13th Mar 20257:00 amRNSOperational Update
28th Feb 20257:00 amRNSNotice of AGM Logistics
14th Feb 20257:00 amRNSNotice of AGM
5th Feb 20257:00 amRNSCertification of Block XX Exploitation Area
16th Jan 20257:00 amRNSOperational Update
14th Nov 20247:00 amRNSOperational Update
25th Oct 20247:00 amRNSProduction startup at Heron-1
22nd Oct 20247:00 amRNSPlanned production startup at Heron-1
7th Oct 20247:00 amRNSOperational Update
1st Oct 20247:07 amRNSHeron-2 drilling results
23rd Sep 20247:00 amRNSSpud of Gobi Bear-1 exploration well
19th Sep 20247:02 amRNSInterim results for six months ended 30 June 2024
19th Sep 20247:00 amRNSHeron-1 operational update
9th Sep 20247:00 amRNSOperational Update – Spud of Heron-2
22nd Aug 20247:00 amRNSOperational Update
23rd Jul 20247:00 amRNSCommencement of Heron-1 Completion Operations
10th Jul 20247:00 amRNSInvestor Presentation & Forward Work Programme
1st Jul 20247:00 amRNSResult of Retail Offer
28th Jun 20247:00 amRNSIssue of equity
26th Jun 20247:00 amRNSRetail Offer
26th Jun 20247:00 amRNSResults of Capital Raise
25th Jun 20244:40 pmRNSProposed fundraise to raise up to USD$8.5 million
19th Jun 20247:00 amRNSFinal results for year ended 31 December 2023
29th May 202411:32 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.