Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.70
High: 2.70
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Report

3 Oct 2007 08:06

Landore Resources Limited03 October 2007 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) PROGRESS REPORT JUNIOR LAKE-NICKEL PROJECT HIGHLIGHTS •The programme of extension and infill drilling on the VW nickel deposit has been completed and the drills have moved to the B4-7 nickel-copper-PGE deposit to begin a similar but smaller (+3000m) program of confirmation and infill drilling. •Drilling regularly intersected multiple zones of resource grade nickel mineralization, with assay results frequently returning grades in excess of 1% nickel. •Mineralization on the VW Nickel Deposit remains open along strike in both directions to the east and west as well as at depth. Mineralized intersections not previously reported include: +-----------+---------+----------+----------+|Drill-hole | From| Width| Nickel|+-----------+---------+----------+----------+|No | Metres| Metres| %|+-----------+---------+----------+----------+|0407-115 | 114.0| 15.0| 0.62|+-----------+---------+----------+----------+| | 132.0| 7.5| 0.43|+-----------+---------+----------+----------+| | 186.0| 7.1| 0.53|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-121 | 232.0| 5.0| 0.59|+-----------+---------+----------+----------+|includes | 234.0| 1.0| 1.08|+-----------+---------+----------+----------+| | 313.0| 3.2| 1.12|+-----------+---------+----------+----------+|includes | 314.0| 1.0| 1.82|+-----------+---------+----------+----------+| | 321.0| 8.0| 0.46|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-128 | 180.0| 18.0| 0.52|+-----------+---------+----------+----------+|includes | 193.0| 2.0| 1.17|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-129 | 300.0| 7.0| 0.75|+-----------+---------+----------+----------+|includes | 305.0| 1.0| 1.93|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-133 | 18.0| 8.9| 0.46|+-----------+---------+----------+----------+| | 183.0| 18.0| 0.70|+-----------+---------+----------+----------+|includes | 191.0| 7.0| 1.25|+-----------+---------+----------+----------+|includes | 194.0| 1.0| 2.34|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-138 | 99.0| 1.0| 1.61|+-----------+---------+----------+----------+ The Junior Lake property is located in the province of Ontario, Canada,approximately 235 kilometres north-northeast of Thunder Bay and is situatedwithin the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. TheVW Nickel Deposit located at Ketchikan Lake toward the south eastern end of theJunior Lake property and the B4-7 Deposit is located approximately 3 kilometresto the north west of the VW Deposit. VW NICKEL DEPOSIT In total 63 NQ size holes (0407-99 to 0407-161) have been completed for a totalof 17,130 metres on the VW Nickel Deposit during this campaign. Drilling has nowtested the VW deposit at 25 to 50 metre spacing over a strike length of 500metres and to a vertical depth of 300 metres. Core logging and sampling of the core continues and assays are pending for afurther 23 holes. Final assay results are expected by late October at whichstage they will be collated and forwarded to Scott Wilson Roscoe PostleAssociates Inc. (Scott Wilson RPA), Toronto, to independently prepare a NationalInstrument 43-101 (NI43-101) resource estimate upgrade and report on the VWNickel Project. Positive results received to date from the current drill programme have expandedand better defined the known deposit and thorough core-logging has improvedunderstanding of controls on mineralization Nickel-copper-cobalt bearing sulphide mineralization (2-15%pyrrhotite-pentlandite +/- pyrite and chalcopyrite) in the VW deposit is hostedwithin a sequence of hydrothermally altered and metamorphosed maficvolcaniclastics, volcanics and pelitic sediments with ultramafic rocks, andbanded iron formation within a well-foliated east-west trending shear zone atleast 125 metres wide. Younger, sub-parallel, less deformed gabbro sills anddykes that penetrated this sequence appear to have channeled remobilizedsulphides into the rocks along foliation between the intrusives, creating themultiple lenses previously recognized. Nickel grades are notably higher adjacentto the sills. The relationship of the mineralization to the gabbro suggests a possible geneticlink with the Ni-Cu-PGE mineralization hosted by gabbro in the B4-7 deposit.Historical sampling of the B4-7 deposit focused on the massive sulphide lensesand generally did not test the disseminated style of mineralization similar tothat of the VW deposit, thus providing additional exploration potential withinthe known B4-7 deposit. This relationship to the gabbro also significantly enhances the explorationpotential along the trend between the two deposits, to the west of the B4-7deposit and along strike in similar stratigraphy to the east of the VW deposit. B4-7 NICKEL-COPPER DEPOSIT A 3000 metre drill programme has commenced on the B4-7 Deposit designed toinfill the remaining gaps in the deposit, to test the continuity of the hangingwall mineralization and for additional metallurgical testing. In March 2006 Landore engaged Scott Wilson RPA to independently prepare atonnage grade estimate of the exploration potential for the B4-7 Deposit. Theirestimate was 1.5 to 2.0 million tonnes @ 1.3 to 1.6% nickel equivalent. Scott Wilson RPA reported that the potential quantity and grade of the B4-7 Zonewas conceptual in nature and there had been insufficient exploration, primarilymetallurgical work, to permit defining a mineral resource. They recommended atthe time that additional drilling be carried out to in-fill gaps in the zone andto provide material for modern metallurgical work to improve nickel recovery. A 7 hole diamond drill programme was completed in October 2006 on the B4-7deposit which successfully in-filled several of the gaps and extended thedeposit to the west. Two of those holes were drilled for metallurgical testing. Several of the above holes intersected wide zones of disseminated sulphidemineralization in the hanging wall of the main B4-7 massive sulphide zone,including drill-hole 0406-93 which intersected 12.4 metres @ 0.86% nickel, 0.47%copper, 636ppm cobalt, 253ppb platinum and 967ppb palladium. Two other drilling campaigns on the B4-7 Deposit, completed in 2002 and 2003,also discovered previously unreported hanging wall mineralization. On completion of the current programme, (approximately the end of October) thedrilling results will be collated and forwarded to Independent Engineers for aNational Instrument 43-101 Resource estimate. All drill core was photographed prior to being cut for assaying. Samples wereanalyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder Bay, Ontario, bygeochemical analysis with atomic absorption finish (Ni). All samples reportingresults of 1% nickel or higher were re-analysed by the assay method with atomicabsorption finish. Check assays, standards and laboratory duplicates wereperformed on a systematic basis at Accurassay Laboratories. ALS ChemexLaboratory in Vancouver, BC also completed systematic checks. Core is stored atsite and in Landore's facilities in Thunder Bay, Ontario. Rejects are stored atAccurassay Laboratories and in Landore's facilities in Thunder Bay. Further releases will be made as results become available. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update
22nd Jul 20147:00 amRNSGrant of Options
17th Jul 201412:00 pmRNSHolding(s) in Company
7th Jul 20147:00 amRNSOversubscribed Placing and Subscription
2nd Jul 20143:33 pmRNSResult of AGM
28th May 20143:53 pmRNSChange of Broker
20th May 201412:18 pmRNSPosting of Annual Report
15th May 20147:00 amRNSFinal Results
15th May 20147:00 amRNSAmendment to Loan Agreement with Lamaune Iron Inc.
23rd Apr 20147:00 amRNSJunior Lake Nickel-Copper Project Update
24th Mar 20147:00 amRNSProgress Update
18th Feb 20147:00 amRNS3D Geophysics Survey Complete
4th Feb 20147:00 amRNSCommencement of 3D Survey
13th Jan 20147:00 amRNSJunior Lake Geophysics Survey
25th Nov 20134:30 pmRNSGrant of Options
25th Oct 201311:19 amRNSHolding(s) in Company
15th Oct 20137:00 amRNSSubscription
30th Sep 20137:00 amRNSUpdate - Junior Lake Nickel-Copper Property
19th Sep 20137:00 amRNSHalf Yearly Report
1st Jul 201311:22 amRNSGrant of Options
20th Jun 201311:30 amRNSResult of AGM
14th May 20137:00 amRNSFinal Results
8th May 20137:00 amRNSChange of Adviser
8th Apr 20137:00 amRNSDrilling Update - Junior Lake Nickel Project
11th Mar 20137:00 amRNSSubscription
17th Jan 20137:00 amRNSResource Update - Junior Lake
12th Dec 20127:00 amRNSDrilling and Geophysical Survey Update
16th Oct 20127:00 amRNSDrilling, Geophysics Survey - Junior Lake
26th Sep 20122:45 pmRNSGrant of Options
20th Sep 201211:04 amRNSTotal Voting Rights
19th Sep 201210:14 amRNSAppointment of Broker
12th Sep 20127:00 amRNSSubscription
3rd Sep 20127:00 amRNSDrilling Update - Junior Lake Project
21st Aug 20127:00 amRNSHalf Yearly Report
25th Jul 20127:00 amRNSDrilling Report
12th Jul 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
20th Jun 20123:11 pmRNSResult of AGM
20th Jun 20127:00 amRNSHolding(s) in Company
29th May 201211:26 amRNSFinal Results
22nd May 20127:00 amRNSDrilling Report
18th Apr 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
21st Mar 20124:37 pmRNSGrant of options
13th Mar 201211:15 amRNSHolding(s) in Company
28th Feb 20127:00 amRNSAdditional Listing
21st Feb 201210:42 amRNSSubscription
23rd Jan 20127:01 amRNSDrilling Update - Junior Lake
3rd Nov 201111:36 amRNSDirector Declaration
2nd Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.