Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.70
High: 2.70
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Report

3 Oct 2007 08:06

Landore Resources Limited03 October 2007 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) PROGRESS REPORT JUNIOR LAKE-NICKEL PROJECT HIGHLIGHTS •The programme of extension and infill drilling on the VW nickel deposit has been completed and the drills have moved to the B4-7 nickel-copper-PGE deposit to begin a similar but smaller (+3000m) program of confirmation and infill drilling. •Drilling regularly intersected multiple zones of resource grade nickel mineralization, with assay results frequently returning grades in excess of 1% nickel. •Mineralization on the VW Nickel Deposit remains open along strike in both directions to the east and west as well as at depth. Mineralized intersections not previously reported include: +-----------+---------+----------+----------+|Drill-hole | From| Width| Nickel|+-----------+---------+----------+----------+|No | Metres| Metres| %|+-----------+---------+----------+----------+|0407-115 | 114.0| 15.0| 0.62|+-----------+---------+----------+----------+| | 132.0| 7.5| 0.43|+-----------+---------+----------+----------+| | 186.0| 7.1| 0.53|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-121 | 232.0| 5.0| 0.59|+-----------+---------+----------+----------+|includes | 234.0| 1.0| 1.08|+-----------+---------+----------+----------+| | 313.0| 3.2| 1.12|+-----------+---------+----------+----------+|includes | 314.0| 1.0| 1.82|+-----------+---------+----------+----------+| | 321.0| 8.0| 0.46|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-128 | 180.0| 18.0| 0.52|+-----------+---------+----------+----------+|includes | 193.0| 2.0| 1.17|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-129 | 300.0| 7.0| 0.75|+-----------+---------+----------+----------+|includes | 305.0| 1.0| 1.93|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-133 | 18.0| 8.9| 0.46|+-----------+---------+----------+----------+| | 183.0| 18.0| 0.70|+-----------+---------+----------+----------+|includes | 191.0| 7.0| 1.25|+-----------+---------+----------+----------+|includes | 194.0| 1.0| 2.34|+-----------+---------+----------+----------+| | | | |+-----------+---------+----------+----------+|0407-138 | 99.0| 1.0| 1.61|+-----------+---------+----------+----------+ The Junior Lake property is located in the province of Ontario, Canada,approximately 235 kilometres north-northeast of Thunder Bay and is situatedwithin the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. TheVW Nickel Deposit located at Ketchikan Lake toward the south eastern end of theJunior Lake property and the B4-7 Deposit is located approximately 3 kilometresto the north west of the VW Deposit. VW NICKEL DEPOSIT In total 63 NQ size holes (0407-99 to 0407-161) have been completed for a totalof 17,130 metres on the VW Nickel Deposit during this campaign. Drilling has nowtested the VW deposit at 25 to 50 metre spacing over a strike length of 500metres and to a vertical depth of 300 metres. Core logging and sampling of the core continues and assays are pending for afurther 23 holes. Final assay results are expected by late October at whichstage they will be collated and forwarded to Scott Wilson Roscoe PostleAssociates Inc. (Scott Wilson RPA), Toronto, to independently prepare a NationalInstrument 43-101 (NI43-101) resource estimate upgrade and report on the VWNickel Project. Positive results received to date from the current drill programme have expandedand better defined the known deposit and thorough core-logging has improvedunderstanding of controls on mineralization Nickel-copper-cobalt bearing sulphide mineralization (2-15%pyrrhotite-pentlandite +/- pyrite and chalcopyrite) in the VW deposit is hostedwithin a sequence of hydrothermally altered and metamorphosed maficvolcaniclastics, volcanics and pelitic sediments with ultramafic rocks, andbanded iron formation within a well-foliated east-west trending shear zone atleast 125 metres wide. Younger, sub-parallel, less deformed gabbro sills anddykes that penetrated this sequence appear to have channeled remobilizedsulphides into the rocks along foliation between the intrusives, creating themultiple lenses previously recognized. Nickel grades are notably higher adjacentto the sills. The relationship of the mineralization to the gabbro suggests a possible geneticlink with the Ni-Cu-PGE mineralization hosted by gabbro in the B4-7 deposit.Historical sampling of the B4-7 deposit focused on the massive sulphide lensesand generally did not test the disseminated style of mineralization similar tothat of the VW deposit, thus providing additional exploration potential withinthe known B4-7 deposit. This relationship to the gabbro also significantly enhances the explorationpotential along the trend between the two deposits, to the west of the B4-7deposit and along strike in similar stratigraphy to the east of the VW deposit. B4-7 NICKEL-COPPER DEPOSIT A 3000 metre drill programme has commenced on the B4-7 Deposit designed toinfill the remaining gaps in the deposit, to test the continuity of the hangingwall mineralization and for additional metallurgical testing. In March 2006 Landore engaged Scott Wilson RPA to independently prepare atonnage grade estimate of the exploration potential for the B4-7 Deposit. Theirestimate was 1.5 to 2.0 million tonnes @ 1.3 to 1.6% nickel equivalent. Scott Wilson RPA reported that the potential quantity and grade of the B4-7 Zonewas conceptual in nature and there had been insufficient exploration, primarilymetallurgical work, to permit defining a mineral resource. They recommended atthe time that additional drilling be carried out to in-fill gaps in the zone andto provide material for modern metallurgical work to improve nickel recovery. A 7 hole diamond drill programme was completed in October 2006 on the B4-7deposit which successfully in-filled several of the gaps and extended thedeposit to the west. Two of those holes were drilled for metallurgical testing. Several of the above holes intersected wide zones of disseminated sulphidemineralization in the hanging wall of the main B4-7 massive sulphide zone,including drill-hole 0406-93 which intersected 12.4 metres @ 0.86% nickel, 0.47%copper, 636ppm cobalt, 253ppb platinum and 967ppb palladium. Two other drilling campaigns on the B4-7 Deposit, completed in 2002 and 2003,also discovered previously unreported hanging wall mineralization. On completion of the current programme, (approximately the end of October) thedrilling results will be collated and forwarded to Independent Engineers for aNational Instrument 43-101 Resource estimate. All drill core was photographed prior to being cut for assaying. Samples wereanalyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder Bay, Ontario, bygeochemical analysis with atomic absorption finish (Ni). All samples reportingresults of 1% nickel or higher were re-analysed by the assay method with atomicabsorption finish. Check assays, standards and laboratory duplicates wereperformed on a systematic basis at Accurassay Laboratories. ALS ChemexLaboratory in Vancouver, BC also completed systematic checks. Core is stored atsite and in Landore's facilities in Thunder Bay, Ontario. Rejects are stored atAccurassay Laboratories and in Landore's facilities in Thunder Bay. Further releases will be made as results become available. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Apr 20213:09 pmRNSDisposal of 30% Interest in West Graham Property
29th Mar 20217:00 amRNSDrilling Update
3rd Mar 20217:00 amRNSJunior Lake Property BAM Gold & Battery Metals
22nd Feb 20215:24 pmRNSDirectors Subscription
17th Feb 20213:12 pmRNSExercise of Warrants and Issue of Equity
16th Feb 20215:57 pmRNS£3.5 Million Fundraising
15th Feb 20217:00 amRNSCorporate Presentation
12th Feb 20214:49 pmRNSStatement re Press Speculation
12th Feb 20218:24 amRNSExercise of Warrants and Issue of Equity
11th Feb 20217:00 amRNSDrilling Update
28th Jan 20214:28 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20215:31 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20213:16 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20217:00 amRNSExercise of Warrants and Issue of Equity
14th Jan 20217:00 amRNSSoil Sampling Program Results
3rd Dec 20207:00 amRNSDrilling Update
9th Nov 202012:38 pmRNSChange of Admission Date
6th Nov 20207:29 amRNSExercise of Warrants and Issue of Equity
19th Oct 20207:00 amRNSDrilling Commences at BAM Gold Project
28th Sep 20207:00 amRNSInitiation of Research Coverage
21st Sep 20207:00 amRNSAcquisition of Royalty Rights at Lamaune Lake
21st Sep 20207:00 amRNSHalf-year Report
1st Sep 20207:00 amRNSDrilling Programme 2020/21 and Pit Optimisation
20th Aug 202012:46 pmRNSResults of General Meetings
6th Aug 202012:54 pmRNSHolding(s) in Company
24th Jul 20201:57 pmRNSAward of Options
24th Jul 20207:01 amRNSProposed Share Capital Consolidaton
24th Jul 20207:00 amRNSFinal Results & Notice of AGM
21st Jul 202011:26 amRNSHolding(s) in Company
20th Jul 202011:13 amRNSHolding(s) in Company
13th Jul 202011:42 amRNSResult of Extraordinary General Meeting
1st Jul 202011:05 amRNSSecond Price Monitoring Extn
1st Jul 202011:00 amRNSPrice Monitoring Extension
29th Jun 20207:00 amRNS£2.8 million Conditional Placing and Accounts Date
22nd Jun 20209:05 amRNSSecond Price Monitoring Extn
22nd Jun 20209:00 amRNSPrice Monitoring Extension
24th Apr 20207:00 amRNSSubscription to raise £260,000
15th Apr 20207:00 amRNSCorporate Presentation
9th Apr 20207:00 amRNSResource Estimate and Technical Report Publication
6th Apr 20204:11 pmRNSDirector/PDMR Shareholding
7th Feb 20204:26 pmRNSDirectorate Change
17th Jan 20207:00 amRNSAppointment of Non-Executive Director
16th Jan 202010:18 amRNSNew Corporate Presentation
14th Jan 202011:52 amRNSSubscription to raise £225,000
7th Jan 20207:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
9th Dec 20197:00 amRNSSoil Sampling Program Results
13th Nov 20197:00 amRNSGrant of Mining Leases to Lamaune Inc
21st Oct 20197:00 amRNSProgress Update - BAM Gold Project
18th Sep 20199:13 amRNSSubscription to raise £470,000
4th Sep 20197:00 amRNSDrilling Update - BAM Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.