Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: 0.00 (0.00%)
Spread: 0.20 (7.692%)
Open: 2.75
High: 2.75
Low: 2.70
Prev. Close: 2.70
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Report

11 Jul 2007 07:00

Landore Resources Limited11 July 2007 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) 11 July 2007 PROGRESS REPORT JUNIOR LAKE-NICKEL PROJECT HIGHLIGHTS •Drilling on the VW Zone Nickel Project continues to intersect multiple zones of resource grade nickel mineralization, with assay results consistently returning grades in excess of 1% nickel. The zone remains open along strike in both directions and at depth. •Claim staking has significantly increased Landore's property holding at Junior Lake, extending the property almost 5 kilometres to the east and south-east covering the eastern strike extension of the structurally deformed geology hosting the VW zone. The Junior Lake area properties now extend over a strike length of 28 kilometres. Mineralized intersections not previously reported include: Drill-hole From Width Nickel No Metres Metres % 0407-108 55.0 2.4 1.01 61.0 5.0 0.89 includes 64.0 2.0 1.42 0407-110 173.0 1.0 1.41 184.0 17.0 0.43 includes 197.0 1.0 1.32 218.0 18.0 0.65 includes 220.0 1.0 1.30 includes 233.0 2.0 2.36 0407-112 77.0 7.0 0.48 includes 82.0 1.0 1.59 0407-113 243.0 38.0 0.32 296.0 7.0 0.74 includes 302.0 1.0 1.35 318.0 5.5 0.70 0407-117 282.0 11.6 0.73 includes 290.0 2.0 1.48 The Junior Lake properties are located in the province of Ontario, Canada,approximately 235 kilometres north-northeast of Thunder Bay and are situatedwithin the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. TheVW Zone Nickel Project is located at Ketchikan Lake toward the south eastern endof the Junior Lake property. Diamond drilling resumed on the VW Zone in mid-April with 2 drill rigs. Acampaign of 60 holes for approximately 15,000 metres is underway, with one rigdedicated to extending the existing inferred resource along strike in bothdirections and down dip, with the second rig carrying out infill drilling toadvance the resource to 'Indicated' status, a requirement for pre-feasibilitystudies. To date, 35 holes (0407-99 to 0407-134), for 9,876 metres, have been completed.Results are pending for 18 of those holes. At completion of the current campaign, (approximately mid September) thedrilling results will be collated and forwarded to Independent Engineers for aNational Instrument 43-101 Resource upgrade. All drill core was photographed prior to being cut for assaying. Samples wereanalyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder Bay, Ontario, bygeochemical analysis with atomic absorption finish (Ni). All samples reportingresults of 1% nickel or higher were re-analysed by the assay method with atomicabsorption finish. Check assays, standards and laboratory duplicates wereperformed on a systematic basis at Accurassay Laboratories. ALS ChemexLaboratory in Vancouver, BC also completed systematic checks. Core is stored atsite and in Landore's facilities in Thunder Bay, Ontario. Rejects are stored atAccurassay Laboratories and in Landore's facilities in Thunder Bay. Further releases will be made during the summer period as drilling continues. Junior Lake Claim Staking During June and July Landore staked and recorded 17 new claims to the east andsouth-east of the Junior Lake property. The new claims were staked as a direct result of the positive advancement of theVW zone nickel deposit and the good potential for the discovery of additionalbase and precious metal mineralization along strike within this geologicalsetting in the East-Central Caribou Lake greenstone belt. In addition, Landore has staked and recorded 5 new claims to the north and southof the VW Zone for inclusion within the proposed area being advanced to Leasestatus, required for possible mining. The Junior Lake claim area is summarized as follows: Junior Lake Claims Area Landore Unpatented Leased Hectares New claims for proposed Lease 5 528 100%New claims to east 9 1,920 100%New claims to south 8 1,984 100%Claims prior to new staking 36 2 5,413 100% Total 58 2 9,845 100% The new claims extend the Junior Lake property almost 5 kilometres to the eastand south covering eastern strike extension of the structurally deformed geologyhosting the VW zone. The Junior Lake area properties now extend over a strikelength of 28 kilometres. A variety of mineralized showings hosting nickel, gold, molybdenum,copper-zinc-lead, and asbestos, as reported in the assessment files, are coveredby the new claims. Nickel mineralization hosted by peridotite (ultramaficrock) in the Toronto Lake area is reported grading up to 0.96% Ni over 0.3 meterby Pye, 1968. Other occurrences of nickel-copper mineralization associatedwith a gabbro-anorthosite sill (Grassy Pond Sill) on a peninsula on the eastside of Toronto Lake and copper-zinc and lead sulphides intersected by drillholes in felsic metavolcanics near the west shore under Toronto Lake arereported by Berger, 1992, from information in the Assessment Files ResearchOffice (AFRO), Toronto. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. - ENDS - For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jul 201711:00 amRNSAward of Share Options
3rd Jul 201712:14 pmRNSResult of AGM
28th Jun 20177:00 amRNSUpdate on BAM East Gold Project
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.