If you would like to ask our webinar guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.60
Ask: 2.80
Change: -0.075 (-2.70%)
Spread: 0.20 (7.692%)
Open: 2.775
High: 3.125
Low: 2.70
Prev. Close: 2.775
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Report - BAM Gold Deposit

30 May 2018 07:00

RNS Number : 5817P
Landore Resources Limited
30 May 2018
 

 

 

LANDORE RESOURCES LIMITED

("Landore Resources" or "the Company")

(AIM Ticker: LND.L)

 

 

PROGRESS REPORT

BAM GOLD DEPOSIT

JUNIOR LAKE PROPERTY

 

 

London, United Kingdom - May 30th 2018 - Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") is pleased to provide this progress report on drilling on the BAM Gold Deposit on its Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

 

Highlights:

· Landore has drilled every 100 metres from 1200E to 1900E in the 900 metre gap between the BAM East Gold Deposit and the original BAM Deposit. The drilling has intersected widespread gold mineralisation within a similar lithological package to the two deposits with multiple instances of visible gold (VG).

 

· Results to date are highly promising, with wide near-surface intersections of up to 41.27 metres at 1.10g/t in drill hole 0417-628, and high grade gold including 24.90 grams per tonne gold (g/t Au) in drill-hole 0418-631.

 

Commenting on this report, Chief Executive Officer of Landore Resources, Bill Humphries, said:

 

"The current infill drill programme shows that the gold mineralisation continues between the two deposits, almost doubling the overall length of the combined deposits to approximately 2,000 metres with excellent potential to add considerable ounces to the resource.

 

The fact that the BAM gold mineralisation delineated to date remains open both to the East and West and down dip/plunge clearly demonstrates this discovery's huge potential."

 

Spring/Summer Drilling Campaign:

The Spring/Summer drill programme of 12,000 metres is progressing on schedule with 20 NQ diamond drill holes (0416-626 to 0416-645), for 3,164 metres, completed to date. Results have been received for five drill holes with results pending for the remainder. Results will be reported when received and collated.

 

Results received include the following.

Easting

Northing

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

1200E

400N

0418-628

22.53

41.27

1.10

including

44.24

7.61

3.10

and

62.80

1.00

11.70

1200E

350N

0418-629

120.21

16.10

1.16

1300E

350N

0418-631

13.12

0.72

24.90

and

74.02

0.70

4.26

and

83.00

15.80

1.01

including

89.45

5.00

2.29

* Holes were drilled north at 45 degrees into a lithological package dipping approximately 80-70 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 70- 80% of the intervals shown in the above table.

 

BAM East Gold Deposit Update:

Previous drilling outlined gold mineralisation at the NI43-101 compliant BAM East Gold Resource and the BAM Gold Deposit, but the area between these two deposits of approximately 900 metres length remained largely untested. The current in-fill drilling has the potential to expand, and connect, these two areas and establish additional mineral resources. The above deposits remain open to the east, west and down dip, providing additional exploration potential to target for future drill programmes on Junior Lake.

 

Planned Works:

Drilling will continue in the above 900 metre area with 50 metre step back holes on each 100 metre line from 1200E to 1900E to test their potential depth extension to 250 metres below surface. Once completed the drilling will concentrate in the highly prospective eastern and western extension areas.

 

About the BAM East Gold Resource:

Discovered in December 2015, the BAM East Gold resource contains 400,000 ounces of gold

 

Category

Tonnes

(000 t)

Grade

(g/t Au)

Contained Au

(000 oz)

Indicated

7,413

1.37

326

Inferred

1,662

1.39

74

 

(January 2018 National Instrument 43-101 Mineral Resource Estimate and Technical Report). 

 

In summer 2017, Landore Resources completed a drilling campaign on the BAM East Gold Deposit. The campaign successfully infilled much of the Inferred portion of the existing Mineral Resource zone and extended its potential strike length from the delineated 700 m to approximately 1,100 m. The BAM East Gold Deposit remained open along strike to the east and west, and down dip.

 

In addition, drilling at the original BAM Zone, located approximately 900 m along strike to the west, successfully intersected additional gold mineralisation with similar lithology and grades to the BAM East Gold Deposit. The limits of the BAM Zone mineralisation remained undefined along strike to the east, west, and down dip.

 

The BAM East Gold Deposit is located in the south central area of the Junior Lake property and is interpreted as an Archean-aged mesothermal gold deposit in which gold mineralisation is hosted by sheared and altered rocks of the Grassy Pond Sill and the BAM Sequence. The host rock units strike in an east-southeast direction (average of azimuth 105°) and dip steeply to moderately to the south at 70° to 75°. The gold mineralisation is interpreted to reside within a series of tabular shaped zones that are oriented in a roughly en-echelon configuration and are generally parallel to the overall strike of the host rock units.

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 26,593 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay.

 

A highly prospective Archean greenstone belt traverses the Junior Lake Property from east to west for approximately 31 kilometres. The greenstone belt ranges from 0.5 to 1.5 kilometres wide and contains all of Landore Resources' stated mineral resources and prospects. However, the greater proportion of this belt remains unexplored.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

 

Bill Humphries, Chief Executive Officer Tel: 07734 681262

Richard Prickett, Finance Director Tel: 07775 651421

Landore Resources Limited www.landore.com

 

Angela Hallett / James Spinney / Jack Botros Tel: 020 7409 3494

Strand Hanson Limited

Nominated Advisor

 

Neil McDonald / Beth McKiernan / Peter Lynch Tel: 01312209771

Cenkos Securities plc

Broker

 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLLFFEESIAFIT
Date   Source Headline
3rd Jul 201712:14 pmRNSResult of AGM
28th Jun 20177:00 amRNSUpdate on BAM East Gold Project
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results
23rd Sep 20147:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.