Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

9 Sep 2021 07:00

RNS Number : 1866L
Landore Resources Limited
09 September 2021
 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

 DRILLING UPDATE

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

 

London, United Kingdom - 9th September 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

Highlights

· Drilling results from below the BAM East defined pit between 2550E and 2750E have continued to report wide zones of ore grade gold mineralisation within the gabbro 'hanging wall' unit, with drill hole 0421-809 intersecting 15.00 metres at 2.48 grams per tonne gold, including 1.00 metre at 22.60 grams per tonne gold. There have been multiple sightings of visible gold in the drill core.

BAM Gold Deposit:

To date a total of 21,933 metres of HQ diamond core drilling, comprising 94 drill holes, (0420-725 to 0421-818) have been completed in this Drilling Programme of which 10,129 metres for 41 drill holes were drilled below the existing BAM Gold Deposit from 1000E to 3000E aimed at deepening and extending the existing resource. Assay results are outstanding for seven drill holes.

 

Results not previously reported include:

Easting

Northing

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

2750E

100S

0421-808

103.65

14.05

0.61

and

193.73

6.17

1.45

2700E

150S

0421-809

154.30

1.00

11.35

and

168.30

15.00

2.48

including

171.30

4.00

7.36

including

174.30

1.00

22.60

and

195.55

3.00

4.07

including

195.55

1.00

10.75

and

252.11

1.09

3.07

2600E

100S

0421-810

180.26

6.05

0.80

and

195.19

8.67

1.02

2550E

60S

0421-811

138.80

1.33

1.92

and

175.63

3.96

2.87

including

178.60

0.99

9.33

and

200.51

2.66

0.96

and

233.95

8.27

0.86

and

280.50

1.06

8.80

 

* The drill holes were drilled north at 45 degrees into a lithological package dipping approximately 60 to 50 degrees to the south. The actual true thickness of mineralisation is estimated to represent 75% to 85% of the intervals shown in the above table

 

2020-2021 Drilling Programme:

The Drilling Programme, consisting of a total of 23,000 metres of HQ diamond core drilling, commenced on October 15th, 2020 and was designed to further infill and extend the defined BAM Gold Deposit resource of 1,015,000 ounces.

 

The Drilling Programme, on the BAM Gold Deposit and immediate exploration to the east and west, concluded on the 1st August with the completion of drill-hole 0421-818 on the West pit extension. Sample preparation has been completed with assay results now expected to be received by late-September after which the data will be collated and forwarded to the Engineers for the Resource Update.

 

Planning:

Drilling will re-commence in mid-October at the highly prospective Felix area along strike and to the west of the BAM Gold Deposit.

 

Landore has engaged Cube Consulting of Perth Western Australia to complete a Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") update on the BAM Gold Deposit now scheduled for completion in Q4 2021.

 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorable greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an

Exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Landore Resources Limited

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

Cenkos Securities (Nominated Advisor and Broker)

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDVLFBFKLEBBF
Date   Source Headline
23rd May 20085:00 pmRNSDirector/PDMR Shareholding
14th May 20083:28 pmRNSResult of AGM
14th May 20087:01 amRNSAGM Statement
14th May 20087:00 amRNSDeposit-Resource Statement
30th Apr 20087:00 amRNSDrilling Report
17th Apr 20087:00 amRNSFinal Results
8th Apr 20087:01 amRNSPlacing
4th Apr 200810:25 amRNSExercise of Warrants
26th Mar 20087:00 amRNSResource Upgrade Statement
25th Mar 20081:00 pmRNSDrilling Update
11th Feb 20088:50 amRNSHolding(s) in Company
23rd Jan 20087:00 amRNSExercise and Grant of Options
10th Jan 200810:22 amRNSDirector/PDMR Shareholding
8th Jan 200812:28 pmRNSDirector/PDMR Shareholding
8th Jan 20087:00 amRNSDrilling Report
12th Dec 20079:16 amRNSHolding(s) in Company
29th Nov 20077:00 amRNSDrilling Results
3rd Oct 20078:06 amRNSProgress Report
7th Sep 20078:55 amRNSGrant of Options
4th Sep 200710:04 amRNSExercise of Options
4th Sep 20077:01 amRNSInterim Results
17th Aug 20074:44 pmRNSAIM Rule 26
31st Jul 20077:00 amRNSProgress Report
11th Jul 20077:00 amRNSProgress Report
25th Jun 20073:29 pmRNSDirector/PDMR Shareholding
5th Jun 20076:14 pmRNSHolding(s) in Company
5th Jun 20077:01 amRNSDrilling Update
1st May 200712:15 pmRNSResult of AGM
1st May 20077:01 amRNSProgress Report
17th Apr 200710:00 amRNSPlacing
3rd Apr 20075:25 pmRNSFinal Results
3rd Apr 20077:01 amRNSDrilling Report
19th Feb 20077:01 amRNSResource Statement
12th Dec 20065:15 pmRNSVoting Rights & Share Capital
16th Nov 200612:54 pmRNSPlacing
13th Nov 20067:01 amRNSProgress Report
25th Oct 200611:36 amRNSDirector/PDMR Shareholding
16th Oct 20067:00 amRNSDrilling Report
20th Sep 20064:13 pmRNSGrant of Options
15th Sep 20067:00 amRNSInterim Results
12th Sep 20067:00 amRNS2nd Interim Drilling Report
22nd Jun 20067:00 amRNSInterim Drilling Report
30th May 200610:36 amRNSDirector/PDMR Shareholding
9th May 20067:00 amRNSProgress Report
10th Apr 20067:01 amRNSFinal Results
7th Mar 20067:00 amRNSDrilling Report
7th Feb 20067:00 amRNSProgress Report
23rd Jan 20063:50 pmRNSHolding(s) in Company
8th Dec 20057:00 amRNSDrilling Update
24th Nov 20057:01 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.