Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

Share Price is delayed by 15 minutes
Get Live Data
0.305    -0.01 (-3.23%)
Bid:
0.29
Ask:
0.32
Spread: 0.03 (10.345%)
Market Cap: £61.12m
KOD Live PriceLast checked at - London Stock Exchange

Intraday Kodal Minerals Share Chart

Operational Update

1 Apr 2014 07:00

RNS Number : 6557D
Kodal Minerals PLC
01 April 2014
 



1 April 2014

 

Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Operational Update

Tests confirm Kodal project will produce a high-grade phosphate concentrate

 

Kodal Minerals, the mining exploration company owning extraction licences for a phosphate and iron (titanomagnetite) project situated in southern Norway (the "Kodal project"), is pleased to report on progress the Company has made over the first three months of 2014.

 

 

Metallurgical Test Work

 

The Company has completed additional metallurgical test work. The sample material was drawn from drill core but cannot be considered to be representative of the deposit. The intention of the tests was to provide samples of both concentrates for further analysis and to provide a sample of tailings material for preliminary analysis. The processing route was developed in the initial test work, which was completed in 2013 and utilises froth flotation and magnetic separation.

 

The Company is pleased to announce that the concentrate grades were broadly in line with expectations based on the results obtained in 2013, with the phosphate concentrate grade dropping slightly while the iron ore grade improved slightly.

 

Phosphate Concentrate

Iron Concentrate

2013 Results

P2O5 41.8%

Fe 62% Ti 8.7%

2014 Results

P2O5 40.5%

Fe 63.7% Ti 5.19%

 

These tests confirm the Kodal project will produce a high-grade phosphate concentrate with both test programmes yielding a concentrate of over 40% P2O5. The increase in the iron concentrate grade is also very positive, especially in combination with the reduction in titanium.

 

Site progress

 

In March, the Company announced the granting of seven new Exploration Permits ("Permits") by the Norwegian Directorate of Mining. These new Permits cover a total land area of 19.795 Km2 and surround the three Extraction Permits already held by the Company at its Kodal deposit.

 

With regards to developments at the site, basic infrastructure has been put in place to support site activities over the summer, including the purchase of a four wheel drive vehicle and establishment of a site office and secure equipment storage at the project location.

 

Environmental monitoring has also started with the installation of two automatic weather stations, one at either end of the project area. These units will collect local weather data, which will be used to support the Environmental and Social Impact Assessment ("ESIA") studies. The monitoring of stream flows in the project area has also been under way since the spring thaw.

 

The format of the ESIA document has been completed following meetings with national, regional and municipal level authorities in Norway. The expected format and content of an ESIA in Norway is somewhat specific to Norway and the Company has spent some time ensuring the planned format meets the Norwegian requirements while still adhering to the Equator Principles risk management framework.

 

Negotiations are under way with a number of consultants and contractors to undertake the environmental baseline studies. It is hoped to complete these discussions and sign contracts in a matter of weeks.

 

 

Board and Consultants

 

The Company announced in March the appointment of Mr Markus Ekberg as a non-executive Director to the Board of Kodal Minerals. Mr Ekberg is a geologist (MSc, Eurogeologist, Qualified person) with 30 years experience and is currently CEO of Endomines AB, a producing gold miner listed in Helsinki and Stockholm.

 

Kodal Minerals has also engaged the services of various consultants to help with the project.

Citiplan, a Norwegian planning consultant, is a small, specialised, consultancy with considerable experience in transportation and land use. They are located in Larvik, some 25 km from the project. With the assistance of Citiplan the Company intends to submit applications for a change of land use to each of the two municipalities whose boundaries cover the project area.

 

The Company also appointed Knight Piésold to investigate tailings disposal options. Knight Piésold is an engineering and environmental consulting company with over 800 staff internationally. They are experts in tailings disposal solutions and the Company is looking forward to working with them to find the optimal solution to tailings disposal in this sensitive area.

 

Outlook

 

During the summer the Company intends to focus on completing the environmental baseline studies as far as possible and on mapping the new permit areas. It is likely that a ground geophysics programme will be completed over all or part of the new permit areas.

 

 

Commenting on today's update, Luke Bryan, CEO, said: "Since our AIM float, we have been working hard to establish the site and prepare for summer activity. Further, we are pleased to announce additional positive results from analysis of sample material. These results support the previous test work and confirm our view that the Kodal project will produce a high-grade phosphate concentrate. We look forward to updating shareholders."

 

 

 

Contact details:

 

Kodal Minerals plc

Luke Bryan, CEO

 

Tel: 020 3463 2260

 

Allenby Capital Limited, Nominated Adviser

Jeremy Porter/Nick Harriss

 

 

Tel: 020 3328 5656

SP Angel Corporate Finance LLP, Financial Adviser & Broker

John Mackay/Laura Littley

 

 

Tel: 020 3463 2260

Yellow Jersey PR Ltd, Financial PR

Dominic Barretto/Kelsey Traynor

Tel: 07768 537 739

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLGDXSSXBGSB
Date   Source Headline
12th Jun 202011:00 amRNSPrice Monitoring Extension
10th Jun 20209:19 amRNSHolding(s) in Company
10th Jun 20209:09 amRNSHolding(s) in Company
8th Jun 20204:40 pmRNSSecond Price Monitoring Extn
8th Jun 20204:36 pmRNSPrice Monitoring Extension
8th Jun 202011:02 amRNSResponse to Share Price Movement
8th Jun 20209:05 amRNSSecond Price Monitoring Extn
8th Jun 20209:00 amRNSPrice Monitoring Extension
5th Jun 202011:06 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
4th Jun 20204:40 pmRNSSecond Price Monitoring Extn
4th Jun 20204:35 pmRNSPrice Monitoring Extension
29th May 20203:11 pmRNSIssue of Shares
28th May 20202:00 pmRNSPrice Monitoring Extension
28th May 202011:06 amRNSSecond Price Monitoring Extn
28th May 202011:00 amRNSPrice Monitoring Extension
28th May 20207:00 amRNSCompany update on Lithium and Gold Projects
19th May 20203:47 pmRNSHolding(s) in Company
19th May 20203:44 pmRNSHolding(s) in Company
15th May 20202:06 pmRNSSecond Price Monitoring Extn
15th May 20202:01 pmRNSPrice Monitoring Extension
15th May 202011:06 amRNSSecond Price Monitoring Extn
15th May 202011:00 amRNSPrice Monitoring Extension
11th May 20207:00 amRNSResults of Bougouni Project Bulk Sample Test Work
30th Apr 20205:00 pmRNSTotal Voting Rights
22nd Apr 20202:05 pmRNSSecond Price Monitoring Extn
22nd Apr 20202:00 pmRNSPrice Monitoring Extension
20th Apr 202011:00 amRNSPrice Monitoring Extension
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Apr 20207:00 amRNSCôte d’Ivoire Gold Exploration Permits Renewed
15th Apr 20209:45 amRNSHolding(s) in Company
15th Apr 20209:41 amRNSHolding(s) in Company
8th Apr 20209:05 amRNSSecond Price Monitoring Extn
8th Apr 20209:00 amRNSPrice Monitoring Extension
7th Apr 20202:44 pmRNSIssue of shares in lieu of fees & TVR
7th Apr 202011:05 amRNSSecond Price Monitoring Extn
7th Apr 202011:00 amRNSPrice Monitoring Extension
7th Apr 20207:00 amRNSTrading update, financing facility and TVR
18th Mar 20202:06 pmRNSSecond Price Monitoring Extn
18th Mar 20202:01 pmRNSPrice Monitoring Extension
24th Feb 20207:00 amRNSUpdate on Mining Licence Application for Bougouni
29th Jan 20207:03 amRNSMOU signed with Mali Lithium Limited
27th Jan 20207:00 amRNSMining Licence Application Lodged at Bougouni
30th Dec 201912:30 pmRNSBougouni Lithium Project Update
6th Dec 20197:00 amRNSInterim Results
25th Nov 20197:00 amRNSESIA Approved for Bougouni Lithium Project
21st Nov 20197:00 amRNSESIA and Bulk Sample Update
21st Nov 20197:00 amRNSNew Replacement Exploration Licences
31st Oct 20195:00 pmRNSTotal Voting Rights
28th Oct 201911:31 amRNS£250,000 Fundraise

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.