Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

Share Price is delayed by 15 minutes
Get Live Data
0.305    -0.01 (-3.23%)
Bid:
0.29
Ask:
0.32
Spread: 0.03 (10.345%)
Market Cap: £61.12m
KOD Live PriceLast checked at - London Stock Exchange

Intraday Kodal Minerals Share Chart

Grimeli project update: High grade copper

3 Nov 2014 07:00

RNS Number : 9091V
Kodal Minerals PLC
03 November 2014
 



Kodal Minerals plc

("Kodal Minerals" or the "Company")

 

Grimeli Project Update

High Grade Copper at Grimeli

 

Kodal Minerals, the mineral development and exploration company owning extraction and exploration licences in Norway, is pleased to announce the results of underground channel sampling completed in the Upper Mine at the Grimeli Project. The Grimeli Project is a copper ("Cu") project located in western Norway approximately 150km north of Bergen.

 

Highlights

 

· The highest grade result from a series of underground channel samples taken from the Grimeli Upper Mine returned a grade of 7.24% Cu over 1.74m;

· Other significant high grade results include 4.93% Cu over 1.02m, 4.89% Cu and 4.19% Cu over 0.5m; and

· The Company is now planning a drill program to test the extent of the mineralised zone to the east, west and below the current sampled area.

 

Luke Bryan, CEO of Kodal Minerals, commented: "These results are particularly interesting as some were taken from the end of an access drive 150 above sea level which we think was constructed around 1917 just as the mine was shut due to a fall in copper prices. As a consequence these represent samples taken from in-situ ore as opposed to the pillars we sampled in the Lower Mine. As well as the samples confirming our high grade expectations we have had access to the full width of the ore body for the first time and the results demonstrate that it extends across the expected 1.5 to 2 metre range. These sample grades further demonstrate the grade potential of the Grimeli Project. We look forward to drill testing this area along with the untested 3,200 metre magnetic anomaly previously reported."

 

Contact details:

 

Kodal Minerals plcLuke Bryan, Chief Executive Officer Tel: 020 3463 2260

 

Allenby Capital Limited, Nominated Adviser Tel: 020 3328 5656

Jeremy Porter/Nick Harriss

 

SP Angel Corporate Finance LLP, Financial Adviser & Broker Tel: 020 3463 2260

John Mackay/Laura Harrison

 

Yellow Jersey PR Ltd, Financial PR Tel: 07768 537 739

Dominic Barretto/Kelsey Traynor

 

 

Further information

 

The Grimeli Project

 

The Company holds exploration permits over an area of 30 sq km, referred to as the Grimeli Project, which includes two previously producing copper mines, the Grimeli mine and the Vågendal mine. The two mines are located on opposite sides of a long hill forming a peninsular on the western coast of Norway and are approximately 7km apart. The copper mines were operational at various times between 1759 and 1920.

 

The Company has previously reported the results of channel samples taken from the lower mine at Grimeli as well as a geophysical anomaly extending for 3,200 metres.

 

 

Sampling results

 

The full table of copper mineralised results from the Grimeli Upper Mine channel sampling is as follows:

 

Copper Grade (%)

Sample Width

7.24

1.74

4.93

1.02

4.19

0.5

3.73

0.93

2.45

0.7

1.83

1.4

1.65

0.88

1.43

1.19

1.07

0.74

 

 

Multi element acid digest assays were completed by SGS Mineral Services on the ten reported channel samples. The assays returned relatively low arsenic of less than 3 ppm in all cases. These samples were taken from a mixture of pillars in a sub level connection to the 170 level and from in-situ ore in the vertical connection between the 150 level and the sub-level. The Company now has access to significant exposure of in-situ ore from which a sample will be extracted for mineral processing test work in due course.

 

The samples taken in the Grimeli Upper Mine further support the view that the historic workings were targeting high grade copper mineralisation. The combined old workings at Grimeli have now been sampled over an approximate vertical extent of 225 metres and an approximate horizontal extent of 350 metres. Samples from the extents of the workings have returned copper assays approaching five percent copper with one result returning 7.24% Cu.

 

Exploration Plan

 

Given the grade at the extents of the old Grimeli workings and the strike extent of the geophysical response the Company intends to drill test both the area below the old mine and selected geophysical targets to both the east and west of the previously mined area.

 

The next steps are to plan the drill program while starting the process of gaining vehicle access to the drill positions. The old mine road is partially intact and it is planned to reinstate this approach once permission is received.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAPEFDFDLFFF
Date   Source Headline
12th Jun 202011:00 amRNSPrice Monitoring Extension
10th Jun 20209:19 amRNSHolding(s) in Company
10th Jun 20209:09 amRNSHolding(s) in Company
8th Jun 20204:40 pmRNSSecond Price Monitoring Extn
8th Jun 20204:36 pmRNSPrice Monitoring Extension
8th Jun 202011:02 amRNSResponse to Share Price Movement
8th Jun 20209:05 amRNSSecond Price Monitoring Extn
8th Jun 20209:00 amRNSPrice Monitoring Extension
5th Jun 202011:06 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
4th Jun 20204:40 pmRNSSecond Price Monitoring Extn
4th Jun 20204:35 pmRNSPrice Monitoring Extension
29th May 20203:11 pmRNSIssue of Shares
28th May 20202:00 pmRNSPrice Monitoring Extension
28th May 202011:06 amRNSSecond Price Monitoring Extn
28th May 202011:00 amRNSPrice Monitoring Extension
28th May 20207:00 amRNSCompany update on Lithium and Gold Projects
19th May 20203:47 pmRNSHolding(s) in Company
19th May 20203:44 pmRNSHolding(s) in Company
15th May 20202:06 pmRNSSecond Price Monitoring Extn
15th May 20202:01 pmRNSPrice Monitoring Extension
15th May 202011:06 amRNSSecond Price Monitoring Extn
15th May 202011:00 amRNSPrice Monitoring Extension
11th May 20207:00 amRNSResults of Bougouni Project Bulk Sample Test Work
30th Apr 20205:00 pmRNSTotal Voting Rights
22nd Apr 20202:05 pmRNSSecond Price Monitoring Extn
22nd Apr 20202:00 pmRNSPrice Monitoring Extension
20th Apr 202011:00 amRNSPrice Monitoring Extension
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Apr 20207:00 amRNSCôte d’Ivoire Gold Exploration Permits Renewed
15th Apr 20209:45 amRNSHolding(s) in Company
15th Apr 20209:41 amRNSHolding(s) in Company
8th Apr 20209:05 amRNSSecond Price Monitoring Extn
8th Apr 20209:00 amRNSPrice Monitoring Extension
7th Apr 20202:44 pmRNSIssue of shares in lieu of fees & TVR
7th Apr 202011:05 amRNSSecond Price Monitoring Extn
7th Apr 202011:00 amRNSPrice Monitoring Extension
7th Apr 20207:00 amRNSTrading update, financing facility and TVR
18th Mar 20202:06 pmRNSSecond Price Monitoring Extn
18th Mar 20202:01 pmRNSPrice Monitoring Extension
24th Feb 20207:00 amRNSUpdate on Mining Licence Application for Bougouni
29th Jan 20207:03 amRNSMOU signed with Mali Lithium Limited
27th Jan 20207:00 amRNSMining Licence Application Lodged at Bougouni
30th Dec 201912:30 pmRNSBougouni Lithium Project Update
6th Dec 20197:00 amRNSInterim Results
25th Nov 20197:00 amRNSESIA Approved for Bougouni Lithium Project
21st Nov 20197:00 amRNSNew Replacement Exploration Licences
21st Nov 20197:00 amRNSESIA and Bulk Sample Update
31st Oct 20195:00 pmRNSTotal Voting Rights
28th Oct 201911:31 amRNS£250,000 Fundraise

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.