Operational Update: 2023

1 Feb 2023 07:00

RNS Number : 4685O
Kibo Energy PLC
01 February 2023
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

Dated: 7am 01 February 2023

 

Kibo Energy PLC ('Kibo' or the 'Company')

 

Operational Update: 2023

 

Kibo Energy PLC (AIM: KIBO; AltX: KBO), the renewable-energy-focused development company, is pleased to provide an operational update, following an eventful but productive year of dedicated hard work amidst extraordinary challenges.

In accordance with the Company's existing operational policy, the Kibo Executive Management team conducted an extensive review of the Company's project portfolio at the end of 2022, which included an operations review. The key elements of said operational review are discussed below.

 

Portfolio

The Kibo Group strategy, as previously announced in a Company RNS dated 19 April 2021, is focused on developing, owning and operating sustainable energy solutions that can immediately and progressively address the acute energy challenges in sub-Saharan Africa, the United Kingdom and Ireland. The Company achieves this by acquiring and developing energy assets that can be brought into production within an 18-to-24-month timeline. This strategy is evident from the comprehensive project portfolio set out in the Q4 2022 Corporate Presentation on the Company's website and which should be read in conjunction with this RNS.

The table below indicates the status of Kibo's Project Portfolio to date. This does not include project opportunities that are currently the subject of advanced due diligence and commercial consideration.

 

Kibo Group Project Portfolio

Entity

Kibo Equity

Strategic Domain

Projects

Development Status

High-Level Indicative Milestone

MAST Energy Developments (UK)

57.86%

Reserve Power

Pyebridge (9 MW)

Operational and generating revenue

Bordesley (5 MW)

Advanced project development

Financial close - Q1 2023

 

Installation of gas and grid connection - December 2023

 

Commercial operation - March 2024

Rochdale (4.4 MW)

Advanced project development

Renewed and updated planning consent - Q1 2023

 

Financial close - end Q2 2023

Hindlip Lane (7.5 MW)

Concept stage

Updated EPC and O&M contracts - Q3 2023

 

Financial close - Q4 2023

Stather Road (2.5 MW)

Concept stage

Determine date at which grid connection is available - Q1 2023

 

Rest of milestones TBD once the above has been established

Sustineri (SA)

65%

Waste to Energy

CHP project to supply base-load electricity generation in South Africa with 4 revenue streams: electricity, gate fees and potentially from heat and steam output as well as the production of synthetic oil.

Phase 1 (2.7 MW + study on synthetic oil production)

Advanced project development stage

Feasibility study update on oil production addition - Q1 2023

 

Completion of integration study and finalization of off-take agreement for oil production - Q2 2023

 

Financial close - Q3 2023

Phase 2 (targeted 20 MW)

Pre-concept stage

Milestones TBD once Phase 1 has been executed

National Broadband Solutions (SA)

51%

Long Duration Energy Storage

 

12.3 MW in development

Simultaneous concept and commercial development

Projects to be announced as off-take agreements are finalized with finalization of first agreements expected during Q1 2023

36.32 MW target for development

Under development

Mbeya Power Project ("MPP") (TZ)

100%

Biofuel

300 MW short-term conversion to renewable energy biofuel

Original project.

Fully permitted with Bankable Feasibility Study completed

Completion of concept study for conversion of MCPP project to bio-coal - Q2 2023

 

Completion of Power Purchase Agreement with TANESCO - Q3 2023

UK Portfolio

100%

Waste to Energy

Southport (10 MW, 2MW long duration energy storage and

5.5m m3 bio-methane)

Completion of front-end engineering and design (FEED) study - Q1 2023

 

Submission of environmental permit application - Q2 2023

 

Submission of green gas supply scheme application - Q2 2023

 

Financial close - Q2/Q3 2023

Katoro Gold

20.88%

Precious and strategic minerals

katorogold.com

 

Notes

The notes below address the most recent announced initiatives in the interest of providing additional context.

Waste to Energy

The plastic-to-syngas project in South Africa, Sustineri, as announced in an RNS dated 17 January 2023, has commenced with an optimisation and integration study into the production of synthetic oil from non-recyclable plastic waste, thereby adding a potential accelerated additional revenue stream to the project. Since synthetic oil is formed as part of the plastic-to-waste pyrolysis process to produce syngas, the production thereof would require a slight amendment to the process as was designed in the feasibility study phase for syngas in the electricity generation process. This implies that the Project can be developed for execution in two distinct phases, with a first phase being the production of synthetic oil and a second phase the production of syngas and electricity.

The decision to pursue the production of synthetic oil as part of phase 1 is expected to have a positive impact on the Project's profitability and provides the Company with the opportunity to generate revenue much earlier than initially projected. Additionally, it provides an opportunity to construct and commission the pyrolysis plant and related infrastructure earlier, thereby facilitating early revenue. Finally, it also contributes materially to de-risking the Project and will make the Project significantly more attractive to a wider spectrum of interested funders, thereby reducing the funding risk and improving the ability to secure said financing.

As the optimisation study is already underway, it is believed that a technical conclusion may already be reached by end of Q1 2023. As the major project technical and commercial milestones have already been achieved, this will allow the accelerated completion of the funding discussions and commencement of project execution.

Biofuel

The Company, after determining the technical feasibility of the production of bio-coal from biomass, is currently determining the commercial viability of this process under a variety of industrial scale applications. In this regard, the company is undertaking both due diligence investigations and participating in advanced discussions on several projects.

Apart from potentially providing a sustainable fuel source for the Mbeya Power Project and subsequently potentially for the two remaining 300MW projects in the Kibo portfolio (i.e. MCIPP and Benga) as well, there is an opportunity to source and/or cultivate biomass to produce bio-coal at strategically placed biofuel production plants for various leading international companies in the manufacturing industry. The Company is working closely with these manufacturers, who operate a significant number of manufacturing plants in Southern Africa, to complete extensive feasibility studies at identified operating plants. To this extent the Company has already determined and agreed on a roll-out plan to supply some of these operating plants with their total fuel requirement in the form of biofuel, completely replacing their current dependence on coal.

 

Immediate and Short-Term Focus

In executing the Company's strategy referred to above, the Company continues to actively execute the following strategic work streams:

 

· Exit coal by a disposal process of its coal assets, all of which are in southern and eastern Africa (RNS dated 16 June 2021). This process is still underway, and the Company has entertained various approaches/offers since and is currently considering a definitive term sheet in this regard which, should it be agreed, the Company expects to announce. The Company's various coal assets are however faced with some fundamental challenges, of which the following are the most important:

o Funding for the construction of new coal mines is not readily available, especially for thermal coal deposits;

o All the Kibo coal assets are situated in very remote areas with very little to no existing infrastructure, far away from any export port (more than 800 km) and with no significant local coal market; and

o The Kibo coal assets are thermal coal deposits and, although thermal coal is in big demand now, it does not command a premium price, which makes such deposits less attractive for exporters, especially when considered in conjunction with the above two points.

· Convert its African electricity-generating asset fuel supply from coal to biofuel technology, subject to proven technical and commercial feasibility (RNS dated 25 August 2022).

· Identify and secure South African and United Kingdom Waste to Energy ("WtE") and flexible/reserve-power projects (RNSs dated 18 May 2021 and 19 April 2021, respectively).

· Enter the Long Duration Energy Storage ('LDES') market, comprising Battery Energy Storage Systems ('BESS') integrated with utility-scale and microgrid renewable energy solutions (RNS dated 17 May 2022).

· Realise shareholder value with the continuation of its spinout strategy, whereby the Company's WtE and biofuel projects to be potentially held in a new AIM-listed vehicle. Ultimate Sustainable Energy LTD ('USE'), is being prepared for listing on AIM via an initial public offering ('IPO'). (See RNS dated 29 September 2022). In this regard, as part of planning and preparation of the IPO referred to above, the Company has identified a Nomad and Broker and is in advanced negotiations towards agreeing engagement and mandate letters with a view of completing the IPO during Q2 2023.

 

Corporate Update

At the start of the new year, in an RNS dated 11 January 2023, the Company announced the appointment of Beaumont Cornish Limited ('BCL') as its new Nominated Adviser (NOMAD). The Company furthermore welcomed Ajay Saldanha as an independent non-executive director to its Board of Directors. Ajay Saldanha (aged 47) is an experienced banking and investment professional with more than 20 years of experience in the power, energy and utilities sector.

The Company is currently sufficiently funded through its existing financing facilities, assuming deferral or otherwise settlement in equity of the bridge loan facility announced on 16 February 2022 and £660,000 Convertible Loan Instrument held by Kibo executive management and directors, to cover operational expenditure for the short to medium term while the Company actively pursues various funding opportunities. These include equity, debt and project financing, to fund the ongoing development of the various projects within the Kibo Group Project Portfolio and to bring the advanced projects, as outlined above, to Financial Close as soon as possible. Most of the projects included in the Project Portfolio are in advanced stages of development and Kibo is working towards achieving Financial Close for all the advanced projects during the course of 2023, with the specific exclusion of the Mbeya Power Project where Financial Close can realistically only be achieved during 2024.

 

Louis Coetzee, Chief Executive Officer and Non-Executive Chairman of Kibo Energy, says: "We are pleased with the progress we have made since announcing our re-focused strategy to pivot to renewable/alternative energy in 2021. In following this strategy, Kibo has built a robust and diversified project pipeline and bolstered its project development capacity. This diversified portfolio sufficiently de-risks the Kibo strategy execution from Management's perspective and has successfully propelled the Company to a position where it currently has the realistic expectation of seeing several projects in revenue generation status over the next 12 to 24 months.

 

The Company has furthermore strengthened its in-house capability significantly with management and project teams that have extensive skills, knowledge and experience in the renewable energy sector. In this regard, the Company has also recently concluded negotiations with a well-respected international executive in the long-duration energy storage industry to join the Kibo team in heading up the Company's renewable energy and long-duration storage business division. Further announcements will be made in this regard as soon as a commencement date has been finalized.

 

2023 promises to be an eventful year for Kibo and we look forward to providing the market with further updates in due course."

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

**ENDS**

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

James Biddle Roland Cornish

+44 207 628 3396

Beaumont Cornish Limited

Nominated Adviser

Claire Noyce

+44 20 3764 2341

Hybridan LLP

Joint Broker

Damon Heath

+44 207 186 9952

Shard Capital Partners LLP

Joint Broker

Zainab Slemang van Rijmenant

zainab@lifacommunications.com

Lifa Communications

Investor and Media Relations Consultant

 

Johannesburg

01 February 2023

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAKFFDFFDEFA
Date   Source Headline
12th Nov 20147:00 amRNSNotice of Presentation & Letter to Shareholders
10th Nov 20148:00 amRNSCommencement of Accelerated PFS for RCPP
28th Oct 20148:00 amRNSRukwa DMFS Project Update
14th Oct 20148:00 amRNSCommencement of DFS on Imweru
10th Oct 20148:11 amRNSClarification re CEO shareholding
9th Oct 20147:00 amRNSFirst Financial Indicators for RCPP
8th Oct 20149:15 amRNSKibo Mining raises £855,725 in Share Placing
29th Sep 20148:00 amRNSRCPP Update
25th Sep 20144:00 pmRNSInterim Results
18th Sep 20148:00 amRNSRCPP Update
9th Sep 20148:00 amRNSPreliminary Evaluation confirms Mining Viability
2nd Sep 20148:30 amRNSImweru Exploration Results
21st Aug 20148:31 amRNSProgress with DFS at RCPP
31st Jul 20148:00 amRNSResult of AGM & Completion of Placing
29th Jul 20148:00 amRNSRCPP to commence DMFS
15th Jul 20144:40 pmRNSSecond Price Monitoring Extn
15th Jul 20144:35 pmRNSPrice Monitoring Extension
14th Jul 20148:30 amRNSKibo Mining Plc Share Placing
7th Jul 20149:17 amRNSPosting of 2013 Annual Report
30th Jun 20143:56 pmRNSAnnual Financial Statements & Notice of AGM
27th Jun 201412:40 pmRNSFinal Results
27th May 20149:00 amRNS1st Quarter Results
2nd Apr 20141:00 pmRNSUK Investor Show & Registered Company Address
31st Mar 20149:00 amRNSKibo Mining raises £750,000 in Share Placing
17th Mar 20148:00 amRNSTechnical Report - Haneti
24th Feb 20148:00 amRNSTechnical Report Confirms Imweru Upside Potential
14th Feb 20149:30 amRNSAppointment of Director
23rd Jan 20149:00 amRNSShareholder Update: Financial Year 2013/14
14th Jan 20147:00 amRNSPositive Phase 1 Drilling Results From Imweru
20th Dec 20137:00 amRNSDistribution of Shareholding by Major Shareholder
19th Dec 20137:00 amRNSHaneti Nickel and Imweru Gold Projects Update
13th Dec 20137:30 amRNSHaneti Exploration Project Update
5th Dec 20133:48 pmRNSKibo Re-acquires 100% interest in Haneti
4th Dec 20137:30 amRNSIMWERU GOLD PROJECT COMPLETED AHEAD OF SCHEDULE
19th Nov 20137:30 amRNSUpdate on Exploration Activities
28th Oct 20137:30 amRNSKibo Commences 3,000 metre Drill Programme
8th Oct 20137:00 amRNSManagement Team and Financial Advisor Appointed
1st Oct 20137:00 amRNSKibo Issues of Shares for Cash
30th Sep 20139:45 amRNSHalf Year Results Announcement
16th Sep 20137:00 amRNSRecent Encouraging Stream Sampling Results
11th Sep 20137:00 amRNSRaises further £500,000 in Secondary Placement
9th Sep 20137:30 amRNSHaneti Joint Venture Project Update
30th Aug 201310:52 amRNSKibo raises £1,105,000 in Share Placing
13th Aug 20137:30 amRNSKibo Announces new Consolidated Lake Victoria Gold
1st Aug 20137:00 amRNSChange in UK Broking Arrangements
31st Jul 20134:45 pmRNSRESULTS OF THE ANNUAL GENERAL MEETING
31st Jul 20137:00 amRNSHaneti Project Interim Update
18th Jul 20137:00 amRNSMOU Signed with Korean East West Power
11th Jul 20137:00 amRNSHaneti Interim Project Update
8th Jul 201310:00 amRNSAnnual Report, AGM Date and Director Resignations

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.