Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

MED Pyebridge Update

27 Feb 2023 09:20

RNS Number : 1302R
Kibo Energy PLC
27 February 2023
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

('Kibo' or 'the Company')

 

Dated: 27 February 2023

 

Kibo Energy PLC

('Kibo' or the 'Company')

 

MED's Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Kibo Energy PLC (AIM: KIBO; AltX: KBO), the renewable energy-focused development company, is pleased to note the positive announcement by its subsidiary, Mast Energy Developments ('MED'), with regards to its current flagship and producing asset, the 9 MW Pyebridge synchronous gas-powered flexible generation facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically. The full announcement can be viewed at https://polaris.brighterir.com/public/mast_energy_developments/news/rns/story/r77nkjr and as set out below.

 

Louis Coetzee, CEO of Kibo Energy said: "The Pyebridge site's performance during 2022 has exceeded our expectations, outperforming the average market price by 88% and highlighting MED's ability to provide significantly better returns compared to the market. Furthermore, MED is on track to bringing its next project, Bordesley, into production later this year along with advancing the development of the rest of the projects within its portfolio".

 

Full MED announcement:

 

Mast Energy Developments PLC

 

Pyebridge Has Significant Enhancement of Income Following Capacity Market Auction Results and Update of Trading Results for 2022

 

Mast Energy Developments PLC ('MED' or the 'Company'), the UK-based multi-asset owner and operator in the rapidly growing Flexible Energy market is pleased to announce an update with regards to its current flagship producing asset, the 9 MW Pyebridge Synchronous Gas-powered Flexible Generation Facility (the 'Site' or 'Pyebridge'). The update specifically refers to the Site's Capacity Market ('CM') contract and the outcome of the recent Capacity Market Auction results, as well as an overview of the key highlights with regards to the Site's actual performance for 2022, both operationally and economically.

 

Capacity Market

 

Upon acquisition of the Site by MED, it had a pre-existing T-4 CM contract at a tariff of £8/kW/pa with a contract value of c. £60k per annum. Due to the UK energy market having moved significantly since the Site previously obtained the aforementioned contract, MED took a strategic decision to forego the contract in favour of applying for new replacement CM contracts in the 2022/2023 CM bid window. Consequently, MED applied for and was successful in pre-qualification to bid for two new CM contracts, being a T-1 and a T-4 CM contract. Following the preparation of a robust CM Auction bid strategy, MED is pleased to announce that pursuant to the recent Capacity Market Auctions and subsequent results, its T-1 bid cleared at £60/kW/pa and, its T-4 bid cleared at an unprecedented historic record price of £63/kW/pa.

 

The Directors are pleased at the success of MED's strategy to replace the Site's previous low-value CM contract with new replacement contracts at significantly higher tariffs. The Site's new replacement T-4 contract at £63/kW/pa compared to its previous T-4 CM contract at £8/kW/pa results in a c. 7.5x (or 750%) uplift in income. The new additional T-1 CM contract, which the Site did not have before and is a new additional contract, will further enhance the Site's revenue significantly.

 

The Site's new T-1 CM contract has a revenue value of c. £308k per annum and its new T-4 CM contract has a revenue value of c. £324k per annum (the latter up from the previous T-4 contract's c. £60k per annum). Both contract values will increase the Site's revenue profile accordingly.

 

Pyebridge Trading Update

 

Following the period of the Site's post-acquisition optimisation (see RNS dated 5 July 2022), and since starting full-scale production during March 2022, the Site generated the following actual performance figures for the c. 10-month period March to December 2022 (the 'Period'):

 

* Electricity Generation Sales Revenue for the Period: c. £1.054m,

* Total Electricity Generation Output for the Period: c. 2,738 MWh, and

* Average Electricity Generation Sales Price achieved per MWh sold for the Period: c. £385.

 

Both the achieved generation production and sales price outperformed the market, with the market's average wholesale price in 2022 coming to only c. £204 per MWh, resulting in an 88% performance above the market and validating MED's strategy and ability to outperform the market. MED's success in this regard is mostly related to the astute utilisation of Artificial Intelligence ('AI') and Machine Learning ('ML') techniques related to its trading algorithm, in conjunction with its PPA Route-to-Market partner, Statkraft.

 

The Site's previous financial performance led the Company to increase its expectations of Pyebridge, which were set out in the Pyebridge Trading Update RNS announcement dated 19 October 2022. The Company confirms that due to unexpected variables during the period under review, including the generation of unprecedented record levels of electricity generation from renewables, most notably wind (which is a hedge to reserve power) from September to December 2022 in the UK, and which went beyond those considered possible by the Company when issuing its expectations, the previously stated expectations are no longer valid. This is a consequence of the increase in electricity generation from renewables reducing the reserve power required across the UK during this period and consequently impacting the electricity generation sales at Pyebridge.

 

Pyebridge Asset Value

 

Following the Pyebridge SPA deferred consideration settlement (see RNS dated 16 December 2022), the total effective acquisition purchase price for the Site was reduced to c. £2.1m.

 

During the Site's recent annual insurance cover policy review, the Site's asset value was independently confirmed at c. £6.3m (on a conservative replacement cost basis). The Site's fair asset value compared to its purchase price therefore highlights the significant upside that MED's investment in Pyebridge has established.

 

Pieter Krügel, MED CEO, commented: "We are pleased to report that Pyebridge obtained new Capacity Market contracts at considerably higher values, which will significantly enhance the Site's revenue profile and profitability. Moreover, we are pleased with the Site's actual performance during 2022, with specific reference to the 88% outperformance of the average market price, highlighting our ability to provide significantly better returns compared to the market. We are confident in our ability and strategy to keep delivering outperformance during 2023. Finally, the Site's fair asset value compared to its acquisition price furthermore highlights MED's ability to identify and acquire sites at an attractive discount in order to enhance value for its shareholders.

 

Further, we are advancing the development of the rest of our projects in the portfolio and looking forward to bringing our next project, Bordesley into production later this year.

 

"MED has a very exciting year ahead, being well established and positioned to fast-track production and growth. We look forward to updating investors with further key developments during the year ahead."

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

**ENDS**

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

James Biddle

Roland Cormish

+44 207 628 3396

Beaumont Cornish Limited

Nominated Adviser

Claire Noyce

+44 20 3764 2341

Hybridan LLP

Joint Broker

Damon Heath

+44 207 186 9952

Shard Capital Partners LLP

Joint Broker

Zainab Slemang van Rijmenant

zainab@lifacommunications.com

Lifa Communications

Investor and Media Relations Consultant

 

Johannesburg

27 February 2023

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKDLBLXLLFBBF
Date   Source Headline
30th May 20222:00 pmRNSUpdate on Admission of Shares to AIM & JSE AltX
30th May 20227:00 amRNSLong Duration Energy Storage Projects in SA
27th May 20227:30 amRNSRestoration - Kibo Energy Plc
27th May 20227:00 amRNSUpdate on Acquisition of Brownhill and RTO
20th May 20223:00 pmRNSSettlement of Outstanding Loan and Issue of Shares
20th May 20227:00 amRNSAppointment of Group Chief Financial Officer
17th May 20227:00 amRNSAgreement to deploy 1 GWh Long Duration Storage
3rd May 20227:00 amRNSAmendment to Share Purchase Agreement
1st Apr 20223:00 pmRNSAmendment to Share Purchase Agreement
1st Apr 20227:00 amRNSConvertible Instrument Redemption Date Extension
21st Mar 20227:30 amRNSSuspension - Kibo Energy PLC
21st Mar 20227:00 amRNSAcquisition of Brownhill and Suspension of Trading
1st Mar 202212:00 pmRNSConvertible Instrument Redemtion Date Extension
23rd Feb 20222:05 pmRNSSecond Price Monitoring Extn
23rd Feb 20222:00 pmRNSPrice Monitoring Extension
16th Feb 20223:15 pmRNSFunding Facility and Issue of Shares
14th Feb 20229:06 amRNSSecond Price Monitoring Extn
14th Feb 20229:00 amRNSPrice Monitoring Extension
14th Feb 20227:00 amRNSTen Year PPA on SA Waste to Energy Project Signed
12th Jan 20227:00 amRNSAppointment of Shard Capital Partners LLP
7th Jan 20227:00 amRNSSettlement of Outstanding Fees to Directors
14th Dec 20217:00 amRNSPending Board Change
15th Nov 20217:45 amRNSPyebridge Steady State Operation and Production
10th Nov 20217:00 amRNSIssue of Shares in lieu of Payment to Contractors
8th Nov 20217:45 amRNSReplacement
8th Nov 20217:00 amRNSKatoro Raises £815,000 in Placing
3rd Nov 20217:00 amRNS£860,000 share subscription with Private Investors
20th Oct 20217:05 amRNSMED Signs Term Sheet to Fund Power Projects
19th Oct 20217:00 amRNSESS Inc.
30th Sep 202111:50 amRNSResult of AGM
24th Sep 20218:00 amRNSHalf-year Report
23rd Sep 20217:00 amRNSFunding Update: UK Waste to Energy Project
16th Sep 20218:45 amRNSStrategic Investment in UK Waste to Energy Project
16th Aug 20217:25 amRNSMED acquires Third Standby Generation Facility
12th Aug 20217:20 amRNSMED acquires 9 MW Pyebridge Gas-powered Facility
30th Jul 20217:00 amRNSCompletion of Agreement with IGES
15th Jul 20212:00 pmRNSPrice Monitoring Extension
15th Jul 202111:05 amRNSSecond Price Monitoring Extn
15th Jul 202111:00 amRNSPrice Monitoring Extension
15th Jul 20219:05 amRNSSecond Price Monitoring Extn
15th Jul 20219:00 amRNSPrice Monitoring Extension
24th Jun 20218:00 amRNSHolding(s) in Company TR 1
24th Jun 20217:50 amRNSHolding(s) in Company TR 1
23rd Jun 20214:41 pmRNSSecond Price Monitoring Extn
23rd Jun 20214:35 pmRNSPrice Monitoring Extension
23rd Jun 20212:05 pmRNSSecond Price Monitoring Extn
23rd Jun 20212:00 pmRNSPrice Monitoring Extension
23rd Jun 202111:05 amRNSSecond Price Monitoring Extn
23rd Jun 202111:00 amRNSPrice Monitoring Extension
16th Jun 20214:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.